International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP7C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP7C  C 

ITU-R WP7C

Remote Sensing Systems

Results:275 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 25 ]  
 
WRC Resolutions and Recommendations related to the work of Study Group 7     Chairman, SG 7     2008-03-24
[ 24 ]  
 
The operation and technical characteristics of the Meteor-M-1 mission     Russian Federation   235/7, 141/7, 139/7   2008-03-21
[ 23 ]  
 
Preliminary draft new Recommendation ITU-R RS.[PATTERN EESS] - Reference antenna pattern for passive sensors operating in the Earth exploration-satellite service (passive) to be used in compatibility analsyses [in the frequency range 1.4-100 GHz]     France   232/7, 215/7, 233/7   2008-03-21
[ 22 ]  
 
List and definition of parameters concerning the technicla and operational characteristics of passive sensors below 275 GHz     France     2008-03-21
[ 21 ]  
 
Agenda item 1.6, WRC-11: Spectrum use by the passive services between 275 GHz and 3 000 GHz     France   235/7   2008-03-21
[ 20 ]  
 
Beam efficiency of the proposed antenna pattern for passive sensors     France     2008-03-21
[ 19 ]  
 
Draft reply liaison to ITU-D SG 2 RG Q22/2 - Proposed replacement annex for ITU-D Study Group 2 Document 138, Annex 4     United States of America     2008-03-20
[ 18 ]  
 
Proposed modifications to Recommendation ITU-R RS.1166-3 - Performance and interference criteria for active spaceborne sensors     United States of America     2008-03-20
[ 17 ]  
 
Working document towards a report or recommendation on the use of passive remote sensing spectrum between 275 and 3 000 GHz     United States of America   235/7   2008-03-20
[ 16 ]  
 
Proposed preliminary draft revision to Recommendation ITU-R RS.577-5: Preferred frequencies and necessary bandwidths for spaceborne active remote sensors     United States of America     2008-03-20
[ 15 ]  
 
Draft reply liaison statement to Working Party 3J (copy to Working Party 1A) - Typical bandwidths for radiocommunication systems under the purview of Working Party 7C     United States of America     2008-03-20
[ 14 ]  
 
Working document - Planning for studies in support of WRC-11 Agenda item 1.16 - (Resolution 671[COM6/16] (WRC-11)) - Recognition of systems in the meteorological aids service in the frequency range below 20 kHz     United Kingdom of Great Britain and Northern Ireland     2008-03-20
[ 13 ]  
 
Draft liaison statement to Working Party 7A - Considerations relating to sharing and compatibility studies in support of WRC-11 Agenda item 1.16 (Resolution 671[COM6/16] (WRC-07))     United Kingdom of Great Britain and Northern Ireland     2008-03-20
[ 12 ]  
 
Draft liaison statement to Working Party 5C - Considerations relating to sharing and compatibility studies in support of WRC-11 Agenda item 1.16 (Resolution 671[COM6/16](WRC-07))     United Kingdom of Great Britain and Northern Ireland     2008-03-20
[ 11 ]  
 
Draft liaison statement to Working Party 5B - Considerations relating to sharing and compatibility studies in support of WRC-11 Agenda item 1.16 (Resolution 671[COM6/16](WRC-07))     United Kingdom of Great Britain and Northern Ireland     2008-03-20
[ 10 ]  
 
Draft liaison statement to Working Parties 3J and 3L - Considerations relating to propagation models for studies in support of WRC-11 Agenda item 1.16 (Resolution 671[COM6/16](WRC-07))     United Kingdom of Great Britain and Northern Ireland     2008-03-20
[ 9 ]  
(Rev.1) 
WRC-11 AI 1.6: Review No. 5.565 (Passive sensing 275-3 000 GHz) and optical links     European Space Agency     2008-03-18
[ 8 ]  
 
Structure of Study Group 7 and its Working Parties     Chairman, SG 7     2008-03-13
[ 7 ]  
 
Liaison statement to WP 4A (copied to WPs 3M, 5A, 5B, 7B and 7C) - Gateway links for high altitude platforms stations in the range from 5 850 to 7 075 MHz     WP 5C     2008-02-19
[ 6 ]  
 
Liaison statement to Working Parties 1A, 4A, 7B, 7C and 7D - WRC-11 Agenda item 1.8 - consideration of technical and regulatory issues relative to the fixed service in the bands between 71 GHz and 238 GHz     WP 5C     2008-02-19
[ 5 ]  
 
Preparation of the CPM Report to WRC-11 following the results of the first session of CPM-11     Chairman, CPM-11     2008-01-29
[ 4 ]  
 
Recommendation to be brought to the attention of Study Groups 3, 4 and 7     BR, Study Group Department     2008-01-16
[ 3 ]  
 
Recommendation to be brought to the attention of Study Group 7     BR Study Group Department     2008-01-16
[ 2 ]  
 
Reply liaison statement to ITU-R Study Group 7 regarding a working document towards a ITU-D Study Group 2 Report on the use of remote sensing for disaster prediction, detection and mitigation     ITU-D Study Group 2   22/2   2007-11-20
[ 1 ]  
 
Documents to be carried over from the 2003-2007 Study period     WP 7C     2007-11-19
Results:275 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2011-09-21