Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 1270 ]
|
Proposed liaison statement and Working Party 5D Workplan regarding WRC-27 agenda item 1.7
|
United States of America
|
|
2024-01-18 |
|
[ 1269 ]
|
Proposed structure of ITU-R Working Party 5D
|
United States of America
|
|
2024-01-18 |
|
[ 1268 ]
|
Detailed Workplan for the development of IMT parameters to support WRC-27 sharing and compatibility studies
|
United States of America
|
|
2024-01-18 |
|
[ 1267 ]
|
Proposed modifications to Recommendation ITU-R M.1036
|
India (Republic of)
|
|
2024-01-18 |
|
[ 1266 ]
|
Proposal for structure of Working Party 5D
|
India (Republic of)
|
|
2024-01-18 |
|
[ 1265 ]
|
Material for discussion towards development of draft new ITU-R Report on minimum requirements related to technical performance for IMT-2030 Radio Interface(s) Technologies (RIT)
|
India (Republic of)
|
|
2024-01-18 |
|
[ 1264 ]
|
Principles for developing new ITU-R Report of technology performance requirements (TPR) for IMT-2030 and beyond
|
Electronics and Telecommunications Research Institute (ETRI)
|
|
2024-01-18 |
|
[ 1263 ]
|
Draft liaison statement on WRC-27 agenda item 1.7
|
Brazil (Federative Republic of)
|
|
2024-01-17 |
|
[ 1262 ]
|
IMT-2030 Development - Technical Performance Requirements
|
Apple Incorporated
|
|
2024-01-17 |
|
[ 1261 ]
|
Working Party 5D structure and WRC-27 related work
|
Brazil (Federative Republic of)
|
|
2024-01-12 |
|
[ 1260 ]
|
Minimum requirements related to technical performance for IMT-2030 radio interface(s)
|
Alliance for Telecommunications Industry Solutions
|
|
2024-01-03 |
|
[ 1259 ]
|
Initial submission of updated material on LTE-Advanced toward Rev. 3 of Recommendation ITU-R M.2150
|
Alliance for Telecommunications Industry Solutions
|
|
2024-01-02 |
|
[ 1258 ]
|
Initial submission of updated material on LTE-Advanced toward Rev. 7 of Recommendation ITU-R M.2012
|
Alliance for Telecommunications Industry Solutions
|
|
2024-01-02 |
|
[ 1257 ]
|
Proposals for structure and working process of WP 5D towards RA-27 and WRC-27
|
IAFI
|
|
2023-12-08 |
|
[ 1256 ]
|
Updates to the draft working document towards a preliminary draft new Report ITU-R M.[IMT.ABOVE 100 GHz] technical feasibility of IMT in bands above 100 GHz
|
Wireless World Research Forum (WWRF)
|
|
2023-06-05 |
|
[ 1255 ]
|
Proposal for update to [preliminary draft new Recommendation ITU-R M. [IMT FRAMEWORK FOR 2030 AND BEYOND]
|
Wireless World Research Forum (WWRF)
|
|
2023-06-05 |
|
[ 1254 ]
|
Working document towards a preliminary draft new Recommendation ITU-R M.[REC.MSS & IMT L-BAND COMPATIBILITY] - Technical and regulatory measures to provide compatibility between IMT and MSS, with respect to MSS operations in the frequency band 1 518-1 525 MHz for administrations wishing to implement IMT in the frequency band 1 492-1 518 MHz
|
Inmarsat Ltd.
|
|
2023-06-05 |
|
[ 1253 ]
|
Proposals to the working document towards preliminary draft new Recommendation ITU-R M.[IMT.FRAMEWORK FOR 2030 AND BEYOND]
|
Nokia Corporation
|
|
2023-06-05 |
|
[ 1252 ]
|
WRC-23 agenda item 1.1 - General considerations on AI1.1 supporting material
|
France
|
|
2023-06-05 |
|
[ 1251 ]
|
Update Report on CITEL PCC.II Activities
|
CITEL Rapporteur
|
|
2023-06-05 |
|
[ 1250 ]
|
Proposed elements for inclusion in the preliminary draft new Recommendation ITU-R M.[IMT. FRAMEWORK FOR 2030 AND BEYOND]
|
Nigeria (Federal Republic of)
,
South Africa (Republic of)
|
|
2023-06-05 |
|
[ 1249 ]
|
Adjacent band compatibility between IMT IN 1 492-1 518 MHz and MSS in 1 518-1 525 MHz
|
GSM Association
|
|
2023-06-05 |
|
[ 1248 ]
|
Proposal for modifications to the preliminary draft new Recommendation ITU-R
M.[IMT.FRAMEWORK 2030 AND BEYOND]
|
British Telecommunications Public Ltd. Co. (BT Plc)
,
Deutsche Telekom AG
,
Orange (F)
,
Telecom Italia S.p.A.
,
Telefónica, S.A.
,
Telia Company AB
|
|
2023-06-05 |
|
[ 1247 ]
|
Contribution to Working Party 5D draft new Recommendation ITU-R M.[IMT.VISION 2030 AND BEYOND]
|
N/A
|
|
2023-06-05 |
|
[ 1246 ]
|
Studies in reply to WRC-19 Document 550 on the verification of RR No. 21.5 FOR the notification of IMT stations which use an array of active elements
|
GSOA
|
|
2023-06-05 |
|
[ 1245 ]
|
Proposals on working document towards a preliminary draft new Recommendation ITU-R M.[IMT.FRAMEWORK FOR 2030 2030 AND BEYOND]
|
GSOA
|
|
2023-06-05 |
|
[ 1244 ]
|
Finalisation and upgrade of draft new Recommendation ITU-R M.[FSS_ES_IMT_ FSS_ES_IMT_26/42/47GHZ]
|
GSOA
|
|
2023-06-05 |
|
[ 1243 ]
|
Reply liaison statement to Working Party 4A - Progress on the work on elements on a working document towards a new Recommendation/Report ITU-R S.[MITIGATION MEASURES]
|
GSOA
|
|
2023-06-05 |
|
[ 1242 ]
|
Proposal on Sections 7 and 8 of preliminary draft new Report ITU-R M.[IMT.MULTIMEIDA]
|
Huawei Technologies Sweden AB
|
|
2023-06-05 |
|
[ 1241 ]
|
Proposals for preliminary draft new Report ITU-R M.[IMT. MULTIMEDIA]
|
Verizon Communication Corporation
|
|
2023-06-05 |
|
[ 1240 ]
|
Proposals for preliminary draft new Report ITU-R M.[IMT.APPLICATIONS]
|
Telecom Italia S.p.A.
,
T-Mobile USA
,
Verizon Communication Corporation
|
|
2023-06-05 |
|
[ 1239 ]
|
Further modifications to the PDNR ITU-R M.[IMT-ADVANCED.UNWANT.MS]
|
IAFI
|
|
2023-06-03 |
|
[ 1238 ]
|
Further modifications to the PDNR ITU-R M.[IMT-ADVANCED.UNWANT.BS]
|
IAFI
|
|
2023-06-03 |
|
[ 1237 ]
|
Review and updating of various ITU-R Questions of relevance to WP5D
|
IAFI
|
|
2023-06-03 |
|
[ 1236 ]
|
Further updates to the preliminary draft new Report ITU-R M. [IMT.MULTIMEDIA]
|
IAFI
|
|
2023-06-03 |
|
[ 1235 ]
|
Draft summary of Report ITU-R M.[IMT.ABOVE 100GHZ] for Sub-Working Group IMT-2030
|
IAFI
|
|
2023-06-03 |
|
[ 1234 ]
|
Proposals for the draft new Recommendation ITU-R M.[IMT.FRAMEWORK FOR 2030 AND BEYOND]
|
IAFI
|
|
2023-06-03 |
|
[ 1233 ]
|
Proposal for capability diagram of the preliminary draft new Recommendation ITU-R M.[IMT.FRAMEWORK 2030 AND BEYOND]
|
Telefon AB - LM Ericsson
,
InterDigital Communications Corp.
,
Nokia Corporation
,
Qualcomm, Inc.
,
Samsung Electronics Co., Ltd.
|
|
2023-06-05 |
|
[ 1232 ]
|
Update proposal to working document towards a preliminary draft new Recommendation ITU-R M.[IMT.VISION 2030 AND BEYOND]
|
Finland
|
|
2023-06-05 |
|
[ 1231 ]
|
Input for the working document towards a preliminary draft new Report ITU-R M.[IMT.ABOVE 100 GHZ]
|
Telefon AB - LM Ericsson
|
|
2023-06-05 |
|
[ 1230 ]
|
Proposal for development of new ITU-R Report on national approaches for IMT-2020 deployment
|
India (Republic of)
|
|
2023-06-05 |
|
[ 1229 ]
|
Amendment on working document towards a preliminary draft new Report ITU-R M.[IMT.AAS]
|
India (Republic of)
|
|
2023-06-05 |
|
[ 1228 ]
|
Proposal for further update to [Preliminary draft new Recommendation or the working document towards a preliminary draft new Recommendation] ITU-R M.[IMT.FRAMEWORK FOR 2030 AND BEYOND]
|
India (Republic of)
|
|
2023-06-05 |
|
[ 1227 ]
|
Proposal on Section 4-13 of preliminary draft new Recommendation ITU-R M.[IMT.FRAMEWORK FOR 2030 AND BEYOND]
|
Electronics and Telecommunications Research Institute (ETRI)
|
|
2023-06-05 |
|
[ 1226 ]
|
Proposal on Section 4-12 of preliminary draft new Recommendation ITU-R M.[IMT.FRAMEWORK FOR 2030 AND BEYOND]
|
Electronics and Telecommunications Research Institute (ETRI)
|
|
2023-06-05 |
|
[ 1225 ]
|
Proposed modification to draft working document towards a preliminary draft new Report ITU-R M.[IMT.ABOVE 100 GHz] - Technical feasibility of IMT in bands above 100 GHz
|
National Institute of Information and Communications Technology (NICT)
,
Waseda University
|
|
2023-06-04 |
|
[ 1224 ]
|
[Preliminary draft new Recommendation ITU-R M.[IMT.FRAMEWORK FOR 2030 AND BEYOND] - [ Working document towards a preliminary draft new Recommendation ITU-R M.[IMT.FRAMEWORK FOR 2030 AND BEYOND] - IMT - Framework and overall objectives of the future development [of the terrestrial component] of IMT for 2030 and beyond
|
Apple Incorporated
|
|
2023-06-04 |
|
[ 1223 ]
|
Update of working document towards a preliminary draft new Recommendation ITU-R M.[IMT.VISION 2030 AND BEYOND] - Clause 4
|
Soonchunhyang University
,
KT Corporation
|
|
2023-06-05 |
|
[ 1222 ]
|
Update of working document towards a preliminary draft new Recommendation ITU-R M.[IMT.VISION 2030 AND BEYOND] - Clause 2.3
|
Soonchunhyang University
,
KT Corporation
|
|
2023-06-03 |
|
[ 1221 ]
|
Update of working document towards a preliminary draft new Recommendation ITU-R M.[IMT.VISION 2030 AND BEYOND] - Clauses 1, 2.1 and 2.2
|
Soonchunhyang University
,
KT Corporation
|
|
2023-06-03 |
Resultats:1518 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):