Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 2140 ]
(Rev.1) |
Comments to new draft G.8152 MPLS-TP model
|
ZTE Corporation
|
Q14/15
|
2012-08-27 |
|
[ 2139 ]
|
Review of providing experience and information for ITU-T new recommendation L.xxx
|
FiberHome Technologies Group; China
|
Q16/15
|
2012-08-27 |
|
[ 2138 ]
(Rev.1) |
Comments on the minimal polynomial and code length in G.975.1
|
China Unicom
,
FiberHome Technologies Group
|
Q8/15
|
2012-08-27 |
|
[ 2137 ]
|
Proposal for revision of recommendation L.47
|
FiberHome Technologies Group; China
|
Q18/15
|
2012-08-27 |
|
[ 2136 ]
(Rev.1-2) |
A method to facilitate dynamic resource allocation(DRA)
|
ZTE Corporation
|
Q4A/15
|
2012-08-27 |
|
[ 2135 ]
(Rev.1) |
Proposal of adding 4-channel 40G application codes into G.959.1
|
China Unicom
,
FiberHome Technologies Group
|
Q6/15
|
2012-08-27 |
|
[ 2134 ]
|
Comment and suggestion for OAM generate process in G.8021
|
China Mobile Communications Corporation
,
FiberHome Technologies Group
|
Q10/15
|
2012-08-27 |
|
[ 2133 ]
|
Correction of OAM "ETH-CSF"
Withdrawn: Incorrect document uploaded.
|
FiberHome Technologies Group
|
Q9/15
|
2012-08-27 |
|
[ 2132 ]
|
gsmp permanent 1 to 1 smp
|
FiberHome Technologies Group
|
Q9/15
|
2012-08-27 |
|
[ 2131 ]
(Rev.1-2) |
example of state machine for SMP
|
China Unicom
,
FiberHome Technologies Group
,
ZTE Corporation
|
Q9/15
|
2012-08-27 |
|
[ 2130 ]
|
Proposal for ONU registration and wavelength tuning functions required in MW-PONs with wavelength-splitter-based ODN
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q2/15
|
2012-08-27 |
|
[ 2129 ]
|
Modification to G-Ach extraction process in cd05
|
China Mobile Communications Corporation
,
FiberHome Technologies Group
|
Q10/15
|
2012-08-27 |
|
[ 2128 ]
|
Considerations on the Error Vector Magnitude definition for G.698.2
|
ADVA Optical Networking
,
Agilent Technologies R&D and Marketing GmbH & Co. KG
,
Oclaro Technology plc
|
Q6/15
|
2012-08-27 |
|
[ 2127 ]
|
Signal Processing Steps for Test & Measurement of Complex Modulation Signals
|
ADVA Optical Networking
,
Agilent Technologies R&D and Marketing GmbH & Co. KG
,
Oclaro Technology plc
|
Q6/15
|
2012-08-27 |
|
[ 2126 ]
|
The requirement of remote management for LAN-side Device in home network
|
FiberHome Technologies Group; China
|
Q1/15
|
2012-08-27 |
|
[ 2125 ]
|
G.fast: FEC resilience tests results.
|
Broadcom Corporation
|
Q4A/15
|
2012-08-27 |
|
[ 2124 ]
|
G.vector: VCE vendor and version information in O-SIGNATURE
|
Broadcom Corporation
|
Q4A/15
|
2012-08-27 |
|
[ 2123 ]
|
Unidirectional OTDR testing of spliced G652 to G657 fibre in FTTH access networks
|
Prysmian SpA
|
Q5/15
|
2012-08-27 |
|
[ 2122 ]
(Rev.1-3) |
Proposal of general parameters for NRZ 2.5 G application code in G.698.3
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q6/15
|
2012-08-27 |
|
[ 2121 ]
(Rev.1) |
Proposal of seed signal input power parameters for NRZ 2.5 G application code
|
Electronics and Telecommunications Research Institute (ETRI)
,
LG-Ericsson
|
Q6/15
|
2012-08-27 |
|
[ 2120 ]
|
Transport of wavelength information via new PLOAM message for enabling ONU transfer in MW-PON system
|
Alcatel-Lucent Shanghai Bell
|
Q2/15
|
2012-08-27 |
|
[ 2119 ]
(Rev.1) |
G.vector: Proposed text changes to address SRA when G.998.4 is enabled
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4A/15
|
2012-08-27 |
|
[ 2118 ]
(Rev.1) |
Strong Authentication and Key Management for XG-PON1
|
Alcatel-Lucent Shanghai Bell
,
China Mobile Communications Corporation
,
China Unicom
,
China
|
Q2/15
|
2012-08-27 |
|
[ 2117 ]
|
Comment on Ethernet over server layer
|
NEC Corporation
|
Q10/15
|
2012-08-27 |
|
[ 2116 ]
|
Comments on G.8112
|
NEC Corporation
|
Q10/15
|
2012-08-27 |
|
[ 2115 ]
|
Consideration of the CSF function on G.8021
|
NEC Corporation
|
Q9/15
|
2012-08-27 |
|
[ 2114 ]
|
Clarification of APS protocol type on G.smp m:1 architecture
|
NEC Corporation
|
Q9/15
|
2012-08-27 |
|
[ 2113 ]
|
Proposed text for the network connectivity in G.Supplement for G.8032
|
NEC Corporation
|
Q9/15
|
2012-08-27 |
|
[ 2112 ]
+Corr.1 |
Add management item as a main function in G.9960
|
FiberHome Technologies Group
|
Q4B/15
|
2012-08-27 |
|
[ 2111 ]
+Corr.1 |
Proposal to G.multi: wavelength management channel choice and announcement in Stacked-PON
|
FiberHome Technologies Group
|
Q2/15
|
2012-08-27 |
|
[ 2110 ]
+Corr.1 |
Proposal to G.multi: the framework of transmission convergence layer function in CO
|
FiberHome Technologies Group
|
Q2/15
|
2012-08-27 |
|
[ 2109 ]
+Corr.1 |
Proposal on supporting OTDR function for G.984.5
|
FiberHome Technologies Group
|
Q2/15
|
2012-08-27 |
|
[ 2108 ]
+Corr.1 |
Proposal on an asymmetric wavelength number physical architechture for G.ngpon2.2
|
FiberHome Technologies Group
|
Q2/15
|
2012-08-27 |
|
[ 2107 ]
|
OAM configuration examples for G.supplement for G.8032
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q9/15
|
2012-08-27 |
|
[ 2106 ]
|
Architecture Considerations for Time Distribution
|
ADVA Optical Networking
|
Q13/15
|
2012-08-26 |
|
[ 2105 ]
|
G.8261.1 Network limits
|
ADVA Optical Networking
|
Q13/15
|
2012-08-26 |
|
[ 2104 ]
|
PTP Network Probe and PTP Clock Probe
|
ADVA Optical Networking
|
Q13/15
|
2012-08-26 |
|
[ 2103 ]
|
Exact PTP clockclass values in application
|
China Mobile Communications Corporation
|
Q13/15
|
2012-08-26 |
|
[ 2102 ]
|
Proposal on PTP multicast MAC address in 8275.1
|
China Mobile Communications Corporation
|
Q13/15
|
2012-08-26 |
|
[ 2101 ]
|
Test and analysis of time synchronization using 1588v2 in 100G OTN long haul transport network
|
China Mobile Communications Corporation
|
Q13/15
|
2012-08-26 |
|
[ 2100 ]
|
Coordinate mechanism for SyncE and PTP
|
China Mobile Communications Corporation
|
Q13/15
|
2012-08-26 |
|
[ 2099 ]
(Rev.1-2) |
Analysis and comparison on PTN ring protection proposals
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q9/15
|
2012-08-26 |
|
[ 2098 ]
(Rev.1-3) |
MPLS-TP Shared-Ring protection (MSRP) mechanism for ring topology
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q9/15
|
2012-08-26 |
|
[ 2097 ]
(Rev.1-2) |
PTN requirements on Ring protection
Revision 2 of this Contribution is incorrectly titled; the correct title is: PTN requirements on Ring protection
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q9/15
|
2012-08-26 |
|
[ 2096 ]
(Rev.1-2) |
Promoting progress of G.8131.1 MPLS-TP APS Linear Protection
|
China Mobile Communications Corporation; China
|
Q9/15
|
2012-08-26 |
|
[ 2095 ]
|
PRTC Timing Signal Variation for a Particular Design
|
SymmetriCom, Inc.
|
Q13/15
|
2012-08-25 |
|
[ 2094 ]
|
G.hn: Update of relaying tables in G.9961
|
Marvell Semiconductor Inc.
|
Q4B/15
|
2012-08-25 |
|
[ 2093 ]
|
G.hn: MA priorities of PROBEs and CTMG
|
Marvell Semiconductor Inc.
|
Q4B/15
|
2012-08-25 |
|
[ 2092 ]
|
G.hn: Updates on the Network admission procedure (NAP)
|
Marvell Semiconductor Inc.
|
Q4B/15
|
2012-08-25 |
|
[ 2091 ]
|
G.hn: interfaces for Management, Control and Security for G.hn
|
Marvell Semiconductor Inc.
|
Q4B/15
|
2012-08-25 |
Resultats:2390 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):