Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG 15 : Réunion 2016-02-15 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG 15  C (2016-02-15) 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Période d'études 2013

Réunion  du 2016-02-15 au 2016-02-26

Lieu : Suisse [Genève]

Autres réunions : 2016-09-19  2015-06-22  2014-11-24  2014-03-24  2013-12-06  2013-07-01  2013-02-01 

Resultats:371 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Suivant Next
Contributions  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 1619 ]  
 
Proposal of new appendix about network migration of SDTN in G.asdt     China Mobile Communications Corporation , FiberHome Technologies Group , Ministry of Industry and Information Technology (MIIT)   Q14/15, Q12/15   2016-02-01
[ 1618 ]  
 
G.hn: Auto-Pairing mechanism     ZTE Corporation   Q18/15   2016-02-01
[ 1617 ]  
 
Revised proposal of multi-dimensional modulation format in G.Sup.39     China Unicom , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q6/15   2016-02-01
[ 1616 ]  
 
Revised Proposals about the Super-Nyquist DWDM in G.sup39     China Unicom , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q6/15   2016-02-01
[ 1615 ]  
(Rev.1) 
Consideration and proposal on PTP event message in FlexO IrDI  
C-1615 Rev.1 adds Q13/15 as a destination Question. There is no change to the content of the Contribution.
 
ZTE Corporation   Q13/15, Q11/15   2016-02-01
[ 1614 ]  
 
Consideration and proposal on overhead format of FlexO     ZTE Corporation   Q11/15   2016-02-01
[ 1613 ]  
 
Proposals about the scope of the G.metro     China Unicom , ZTE Corporation   Q6/15   2016-02-01
[ 1612 ]  
 
Considerations on overhead of FlexE aware client mapping method     ZTE Corporation   Q11/15   2016-02-01
[ 1611 ]  
(Rev.1) 
Frequency error test results - CPRI over ODU2r  
C-1611 Rev.1 adds Q13/15 as a destination Question. There is no change to the content of the Contribution.
 
IP Light   Q13/15, Q11/15   2016-02-01
[ 1610 ]  
 
EVM related results and proposal of G.698.2     China Unicom , ZTE Corporation   Q6/15   2016-02-01
[ 1609 ]  
 
Proposals about centralized recovery for SDN controlled transport network     China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , ZTE Corporation   Q9/15, Q14/15, Q12/15   2016-02-01
[ 1608 ]  
 
Application code proposal in G.metro     ADVA Optical Networking , China Unicom , Ericsson Canada, Inc. , Finisar Corporation , Huawei Technologies Co., Ltd. , ZTE Corporation   Q6/15   2016-02-01
[ 1607 ]  
 
Consideration of information between HEE and TEE in G.metro     China Unicom   Q6/15, Q14/15   2016-02-01
[ 1606 ]  
 
Proposal of parameters for G.654.E fibre category     Communication Line Products Association of Japan , Nippon Telegraph and Telephone Corporation (NTT)   Q6/15, Q5/15   2016-02-01
[ 1605 ]  
 
Short reach application codes and AWG requirement in G.metro     China Unicom , Ericsson Canada, Inc. , Finisar Corporation , ZTE Corporation   Q7/15, Q6/15   2016-02-01
[ 1604 ]  
 
Field trials and proposal of G.654 for terrestrial application     China Unicom , FiberHome Technologies Group , Ministry of Industry and Information Technology (MIIT) , OFS Fitel, LLC   Q6/15, Q5/15   2016-02-01
[ 1603 ]  
(Rev.1) 
The requirement of Yang module in MPLS-TP  
C-1603 Rev.1 adds Q14/15 as a destination Question. There is no change to the content of the Contribution.
 
FiberHome Technologies Group   Q14/15, Q10/15   2016-02-01
[ 1602 ]  
 
The consideration of interworking between OTUC1 and OTU4     FiberHome Technologies Group   Q11/15   2016-02-01
[ 1601 ]  
 
Proposal to the centralized restoration for G.asdtn and HRM     Ministry of Industry and Information Technology (MIIT)   Q9/15, Q14/15, Q12/15   2016-02-01
[ 1600 ]  
(Rev.1) 
The suggestion about multichannel parallel interfaces in B100G  
C-1600 Rev.1 adds Q6/15 as a destination Question. There is no change to the content of the Contribution.
 
FiberHome Technologies Group   Q6/15, Q11/15   2016-02-01
[ 1599 ]  
 
Proposals to clause 7.3 of G.asdtn on multi-layer and multi-domain control     Ministry of Industry and Information Technology (MIIT)   Q14/15, Q12/15   2016-02-01
[ 1598 ]  
 
G.vlc: requirements on Data link layer per uplink mode     Ministry of Industry and Information Technology (MIIT)   Q18/15   2016-02-01
[ 1597 ]  
 
G.vlc: Simulation results on DCO-OFDM and ACO-OFDM     Ministry of Industry and Information Technology (MIIT)   Q18/15   2016-02-01
[ 1596 ]  
 
Proposed modification of ASTAP input on disaster management     Nippon Telegraph and Telephone Corporation (NTT)   Q17/15   2016-02-01
[ 1595 ]  
 
Test results and discussion of the EVM metrics     CAICT, P.R.China , ZTE Corporation   Q6/15   2016-02-01
[ 1594 ]  
 
Proposed description on MDRU size consideration     Nippon Telegraph and Telephone Corporation (NTT)   Q17/15   2016-02-01
[ 1593 ]  
 
100G system in-service OSNR monitoring and embedded OTDR test     AICT, P.R.China , China Mobile Communications Corporation , ZTE Corporation   Q6/15   2016-02-01
[ 1592 ]  
(Rev.1-2) 
Propose SG15 to start pre-research project on IMT2020 Mobile back haul and front haul network     Ministry of Industry and Information Technology (MIIT) , China Mobile Communications Corporation   Q6/15, Q2/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15   2016-02-01
[ 1591 ]  
 
Promote the progress of G.MDSP to address operators' urgent needs     Ministry of Industry and Information Technology (MIIT) , China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom   Q9/15   2016-02-01
[ 1590 ]  
 
Consideration in defining data model for transport network     Fujitsu Limited   Q14/15   2016-02-01
[ 1589 ]  
 
Consideration in progressing LTP and LP in for transport network     Fujitsu Limited   Q14/15   2016-02-01
[ 1588 ]  
 
Updated SDL diagrams for G.806     Fujitsu Limited   Q11/15   2016-02-01
[ 1587 ]  
 
Counter processes text for G.8121.1     Fujitsu Limited   Q10/15   2016-02-01
[ 1586 ]  
 
Comments on G.8121     Fujitsu Limited   Q10/15   2016-02-01
[ 1585 ]  
 
Terminology for traffic shaping function     Fujitsu Limited   Q3/15, Q14/15, Q10/15   2016-02-01
[ 1584 ]  
 
Update of G.709 Appendix VII     Alcatel-Lucent USA Inc.   Q11/15   2016-01-31
[ 1583 ]  
 
Reconsideration of G.709 Appendix XII - OTLC.4 Structure     Alcatel-Lucent USA Inc.   Q11/15   2016-01-31
[ 1582 ]  
 
New Ethernet Rates and impact on OTN standardization     Alcatel-Lucent USA Inc.   Q11/15   2016-01-31
[ 1581 ]  
 
Clarification of ODU SMP Bridge and Selector Operation     Alcatel-Lucent USA Inc.   Q9/15   2016-01-31
[ 1580 ]  
 
Proposal of electrical performance for revision of recommendation L.60     FiberHome Technologies Group   Q16/15   2016-01-31
[ 1579 ]  
 
Revision proposal for Appendix I Chinese experience of recommendation L.60     FiberHome Technologies Group   Q16/15   2016-01-31
[ 1578 ]  
 
Propose to include pilot-tone auxiliary channel protocol as the G.ROF PON adaptation function     FiberHome Technologies Group   Q2/15   2016-01-31
[ 1577 ]  
 
Comparison of three technical approaches of PON adaptation function in G.ROF     FiberHome Technologies Group   Q2/15   2016-01-31
[ 1576 ]  
 
Comments on Clauses 5 and 6 of draft revised Recommendation G.872     Alcatel-Lucent USA Inc.   Q12/15   2016-01-31
[ 1575 ]  
 
Proposal re Clause 11 of draft revised Recommendation G.872     Alcatel-Lucent USA Inc.   Q12/15   2016-01-31
[ 1574 ]  
 
Proposed new material for media element in G.798     Coriant GmbH & Co. KG , ZTE Corporation   Q6/15, Q14/15, Q12/15, Q11/15   2016-01-29
[ 1573 ]  
 
Proposed new material for OSC layer in G.798     Coriant GmbH & Co. KG   Q11/15   2016-01-29
[ 1572 ]  
 
Proposed changes to clause 12/G.798     Coriant GmbH & Co. KG   Q11/15   2016-01-29
[ 1571 ]  
 
Proposed changes to clause 11/G.798     Coriant GmbH & Co. KG   Q11/15   2016-01-29
[ 1570 ]  
 
Proposed changes to clauses 9 and 10/G.798     Coriant GmbH & Co. KG   Q11/15   2016-01-29
Resultats:371 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-11-17