Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 1619 ]
|
Proposal of new appendix about network migration of SDTN in G.asdt
|
China Mobile Communications Corporation
,
FiberHome Technologies Group
,
Ministry of Industry and Information Technology (MIIT)
|
Q14/15, Q12/15
|
2016-02-01 |
|
[ 1618 ]
|
G.hn: Auto-Pairing mechanism
|
ZTE Corporation
|
Q18/15
|
2016-02-01 |
|
[ 1617 ]
|
Revised proposal of multi-dimensional modulation format in G.Sup.39
|
China Unicom
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q6/15
|
2016-02-01 |
|
[ 1616 ]
|
Revised Proposals about the Super-Nyquist DWDM in G.sup39
|
China Unicom
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q6/15
|
2016-02-01 |
|
[ 1615 ]
(Rev.1) |
Consideration and proposal on PTP event message in FlexO IrDI
C-1615 Rev.1 adds Q13/15 as a destination Question. There is no change to the content of the Contribution.
|
ZTE Corporation
|
Q13/15, Q11/15
|
2016-02-01 |
|
[ 1614 ]
|
Consideration and proposal on overhead format of FlexO
|
ZTE Corporation
|
Q11/15
|
2016-02-01 |
|
[ 1613 ]
|
Proposals about the scope of the G.metro
|
China Unicom
,
ZTE Corporation
|
Q6/15
|
2016-02-01 |
|
[ 1612 ]
|
Considerations on overhead of FlexE aware client mapping method
|
ZTE Corporation
|
Q11/15
|
2016-02-01 |
|
[ 1611 ]
(Rev.1) |
Frequency error test results - CPRI over ODU2r
C-1611 Rev.1 adds Q13/15 as a destination Question. There is no change to the content of the Contribution.
|
IP Light
|
Q13/15, Q11/15
|
2016-02-01 |
|
[ 1610 ]
|
EVM related results and proposal of G.698.2
|
China Unicom
,
ZTE Corporation
|
Q6/15
|
2016-02-01 |
|
[ 1609 ]
|
Proposals about centralized recovery for SDN controlled transport network
|
China Telecommunications Corporation
,
FiberHome Technologies Group
,
Huawei Technologies Co., Ltd.
,
ZTE Corporation
|
Q9/15, Q14/15, Q12/15
|
2016-02-01 |
|
[ 1608 ]
|
Application code proposal in G.metro
|
ADVA Optical Networking
,
China Unicom
,
Ericsson Canada, Inc.
,
Finisar Corporation
,
Huawei Technologies Co., Ltd.
,
ZTE Corporation
|
Q6/15
|
2016-02-01 |
|
[ 1607 ]
|
Consideration of information between HEE and TEE in G.metro
|
China Unicom
|
Q6/15, Q14/15
|
2016-02-01 |
|
[ 1606 ]
|
Proposal of parameters for G.654.E fibre category
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q6/15, Q5/15
|
2016-02-01 |
|
[ 1605 ]
|
Short reach application codes and AWG requirement in G.metro
|
China Unicom
,
Ericsson Canada, Inc.
,
Finisar Corporation
,
ZTE Corporation
|
Q7/15, Q6/15
|
2016-02-01 |
|
[ 1604 ]
|
Field trials and proposal of G.654 for terrestrial application
|
China Unicom
,
FiberHome Technologies Group
,
Ministry of Industry and Information Technology (MIIT)
,
OFS Fitel, LLC
|
Q6/15, Q5/15
|
2016-02-01 |
|
[ 1603 ]
(Rev.1) |
The requirement of Yang module in MPLS-TP
C-1603 Rev.1 adds Q14/15 as a destination Question. There is no change to the content of the Contribution.
|
FiberHome Technologies Group
|
Q14/15, Q10/15
|
2016-02-01 |
|
[ 1602 ]
|
The consideration of interworking between OTUC1 and OTU4
|
FiberHome Technologies Group
|
Q11/15
|
2016-02-01 |
|
[ 1601 ]
|
Proposal to the centralized restoration for G.asdtn and HRM
|
Ministry of Industry and Information Technology (MIIT)
|
Q9/15, Q14/15, Q12/15
|
2016-02-01 |
|
[ 1600 ]
(Rev.1) |
The suggestion about multichannel parallel interfaces in B100G
C-1600 Rev.1 adds Q6/15 as a destination Question. There is no change to the content of the Contribution.
|
FiberHome Technologies Group
|
Q6/15, Q11/15
|
2016-02-01 |
|
[ 1599 ]
|
Proposals to clause 7.3 of G.asdtn on multi-layer and multi-domain control
|
Ministry of Industry and Information Technology (MIIT)
|
Q14/15, Q12/15
|
2016-02-01 |
|
[ 1598 ]
|
G.vlc: requirements on Data link layer per uplink mode
|
Ministry of Industry and Information Technology (MIIT)
|
Q18/15
|
2016-02-01 |
|
[ 1597 ]
|
G.vlc: Simulation results on DCO-OFDM and ACO-OFDM
|
Ministry of Industry and Information Technology (MIIT)
|
Q18/15
|
2016-02-01 |
|
[ 1596 ]
|
Proposed modification of ASTAP input on disaster management
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q17/15
|
2016-02-01 |
|
[ 1595 ]
|
Test results and discussion of the EVM metrics
|
CAICT, P.R.China
,
ZTE Corporation
|
Q6/15
|
2016-02-01 |
|
[ 1594 ]
|
Proposed description on MDRU size consideration
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q17/15
|
2016-02-01 |
|
[ 1593 ]
|
100G system in-service OSNR monitoring and embedded OTDR test
|
AICT, P.R.China
,
China Mobile Communications Corporation
,
ZTE Corporation
|
Q6/15
|
2016-02-01 |
|
[ 1592 ]
(Rev.1-2) |
Propose SG15 to start pre-research project on IMT2020 Mobile back haul and front haul network
|
Ministry of Industry and Information Technology (MIIT)
,
China Mobile Communications Corporation
|
Q6/15, Q2/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15
|
2016-02-01 |
|
[ 1591 ]
|
Promote the progress of G.MDSP to address operators' urgent needs
|
Ministry of Industry and Information Technology (MIIT)
,
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
China Unicom
|
Q9/15
|
2016-02-01 |
|
[ 1590 ]
|
Consideration in defining data model for transport network
|
Fujitsu Limited
|
Q14/15
|
2016-02-01 |
|
[ 1589 ]
|
Consideration in progressing LTP and LP in for transport network
|
Fujitsu Limited
|
Q14/15
|
2016-02-01 |
|
[ 1588 ]
|
Updated SDL diagrams for G.806
|
Fujitsu Limited
|
Q11/15
|
2016-02-01 |
|
[ 1587 ]
|
Counter processes text for G.8121.1
|
Fujitsu Limited
|
Q10/15
|
2016-02-01 |
|
[ 1586 ]
|
Comments on G.8121
|
Fujitsu Limited
|
Q10/15
|
2016-02-01 |
|
[ 1585 ]
|
Terminology for traffic shaping function
|
Fujitsu Limited
|
Q3/15, Q14/15, Q10/15
|
2016-02-01 |
|
[ 1584 ]
|
Update of G.709 Appendix VII
|
Alcatel-Lucent USA Inc.
|
Q11/15
|
2016-01-31 |
|
[ 1583 ]
|
Reconsideration of G.709 Appendix XII - OTLC.4 Structure
|
Alcatel-Lucent USA Inc.
|
Q11/15
|
2016-01-31 |
|
[ 1582 ]
|
New Ethernet Rates and impact on OTN standardization
|
Alcatel-Lucent USA Inc.
|
Q11/15
|
2016-01-31 |
|
[ 1581 ]
|
Clarification of ODU SMP Bridge and Selector Operation
|
Alcatel-Lucent USA Inc.
|
Q9/15
|
2016-01-31 |
|
[ 1580 ]
|
Proposal of electrical performance for revision of recommendation L.60
|
FiberHome Technologies Group
|
Q16/15
|
2016-01-31 |
|
[ 1579 ]
|
Revision proposal for Appendix I Chinese experience of recommendation L.60
|
FiberHome Technologies Group
|
Q16/15
|
2016-01-31 |
|
[ 1578 ]
|
Propose to include pilot-tone auxiliary channel protocol as the G.ROF PON adaptation function
|
FiberHome Technologies Group
|
Q2/15
|
2016-01-31 |
|
[ 1577 ]
|
Comparison of three technical approaches of PON adaptation function in G.ROF
|
FiberHome Technologies Group
|
Q2/15
|
2016-01-31 |
|
[ 1576 ]
|
Comments on Clauses 5 and 6 of draft revised Recommendation G.872
|
Alcatel-Lucent USA Inc.
|
Q12/15
|
2016-01-31 |
|
[ 1575 ]
|
Proposal re Clause 11 of draft revised Recommendation G.872
|
Alcatel-Lucent USA Inc.
|
Q12/15
|
2016-01-31 |
|
[ 1574 ]
|
Proposed new material for media element in G.798
|
Coriant GmbH & Co. KG
,
ZTE Corporation
|
Q6/15, Q14/15, Q12/15, Q11/15
|
2016-01-29 |
|
[ 1573 ]
|
Proposed new material for OSC layer in G.798
|
Coriant GmbH & Co. KG
|
Q11/15
|
2016-01-29 |
|
[ 1572 ]
|
Proposed changes to clause 12/G.798
|
Coriant GmbH & Co. KG
|
Q11/15
|
2016-01-29 |
|
[ 1571 ]
|
Proposed changes to clause 11/G.798
|
Coriant GmbH & Co. KG
|
Q11/15
|
2016-01-29 |
|
[ 1570 ]
|
Proposed changes to clauses 9 and 10/G.798
|
Coriant GmbH & Co. KG
|
Q11/15
|
2016-01-29 |
Resultats:371 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):