Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 998 ]
|
Detailed ME proposal for G.FIN.NM
|
China Unicom
,
Huawei Technologies Co., Ltd. (China)
|
Q3/15
|
2024-06-17 |
|
[ 997 ]
|
B1T path layer frame format
|
ADTRAN Holdings Inc. (United States)
,
China Information Communication Technologies Group
|
Q11/15
|
2024-06-17 |
|
[ 996 ]
|
The initial thoughts on the protocol of G.WMCI.
|
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q3/15
|
2024-06-17 |
|
[ 995 ]
|
B1T OTN layering
|
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q11/15
|
2024-06-17 |
|
[ 994 ]
|
Proposal to add new contents for the draft L.pcc
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q7/15
|
2024-06-17 |
|
[ 993 ]
|
Proposals to update G.661 about the ROPA
|
China Unicom
,
ZTE Corporation (China)
|
Q6/15
|
2024-06-17 |
|
[ 992 ]
(Rev.1) |
Considerations on port state decision based on enhanced accuracy TLV
|
China Information Communication Technologies Group
|
Q13/15
|
2024-06-17 |
|
[ 991 ]
|
Further considerations about the transceiver for the 4.8T and 6T bands
|
China Information Communication Technologies Group
,
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q6/15
|
2024-06-17 |
|
[ 990 ]
(Rev.1) |
Text proposal on use cases and high-level design requirements for G.Suppl-FTS
|
China Information Communication Technologies Group
|
Q13/15
|
2024-06-17 |
|
[ 989 ]
|
Proposal of revision of G Suppl. 55
|
National Institute of Information and Communications Technology (NICT) (Japan)
|
Q2/15
|
2024-06-17 |
|
[ 988 ]
|
Text proposal for OTN interfaces in G.781
|
China Information Communication Technologies Group
|
Q13/15
|
2024-06-17 |
|
[ 987 ]
|
Considerations about the system architectures of G.dfos
|
Ministry of Industry and Information Technology (MIIT) (China)
,
ZTE Corporation (China)
|
Q6/15
|
2024-06-17 |
|
[ 986 ]
|
Considerations for out-of-band and in-band sensing wavelength options for new draft ITU-T Rec. G.dfos
|
Ministry of Communications (India)
,
Sterlite Technologies Limited (India)
|
Q6/15
|
2024-06-17 |
|
[ 985 ]
|
Baseline draft on new Recommendation L.nis "Technical and functional requirements for network infrastructures sharing"
|
Ministry of Communications (India)
|
Q7/15
|
2024-06-17 |
|
[ 984 ]
|
Modulation formats and transceiver configurations for vHSP
|
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
|
Q2/15
|
2024-06-17 |
|
[ 983 ]
|
Text proposal for WP1 TP on Broadband access & in-premises network
|
Nokia Corporation (Finland)
|
Q4/15
|
2024-06-17 |
|
[ 982 ]
|
Considerations on B1T OTN
|
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q11/15
|
2024-06-17 |
|
[ 981 ]
(Rev.1) |
G.supPONsecurity: Text Proposal for Duplicate-ONU-SN issue
|
Nokia Corporation (Finland)
|
Q2/15
|
2024-06-17 |
|
[ 980 ]
|
M+1 fgOTN protection application in power grid communication network
|
Huawei Technologies Co., Ltd. (China)
,
State Grid Corporation of China
|
Q11/15
|
2024-06-17 |
|
[ 979 ]
|
Mapping of multiple E1 signals into fgOPUflex(1) proposal
|
Huawei Technologies Co., Ltd. (China)
,
State Grid Corporation of China
|
Q11/15
|
2024-06-17 |
|
[ 978 ]
|
G.709 AM3 corrigendum
|
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2024-06-17 |
|
[ 977 ]
|
Considerations on the B1T frame structure
|
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2024-06-17 |
|
[ 976 ]
|
Analysis and considerations of B1T LO and HO ODU path
|
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
|
Q11/15
|
2024-06-17 |
|
[ 975 ]
(Rev.1) |
Update and revise electrical characteristics for optical electrical hybrid cable
|
China Information Communication Technologies Group
|
Q5/15
|
2024-06-17 |
|
[ 974 ]
|
Port recognition for ODN visualization
|
ZTE Corporation (China)
|
Q2/15
|
2024-06-17 |
|
[ 973 ]
(Rev.1) |
G.sup.VHSP: some proposals for the coherent PON
|
China Information Communication Technologies Group
|
Q2/15
|
2024-06-17 |
|
[ 972 ]
(Rev.1) |
G.sup.VHSP: several technical variants for IMDD TDM PON
|
China Information Communication Technologies Group
|
Q2/15
|
2024-06-17 |
|
[ 971 ]
|
Proposed revisions for Recommendation G.652
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q6/15, Q5/15, Q2/15
|
2024-06-17 |
|
[ 970 ]
|
Considerations for Wavelength Band Expansion in 800G DWDM Systems
|
KDDI Corporation (Japan)
,
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q6/15
|
2024-06-17 |
|
[ 969 ]
|
Additional details about WTR for G.8275.1 and G.8275.2
|
Ciena Canada
|
Q13/15
|
2024-06-16 |
|
[ 968 ]
|
Clarification on T-GM behavior in Acquiring state
|
Ciena Canada
|
Q13/15
|
2024-06-16 |
|
[ 967 ]
|
Field trial results about C6T+L6T 800G DWDM applications
|
China Information Communication Technologies Group
,
China Telecommunications Corporation
|
Q6/15
|
2024-06-15 |
|
[ 966 ]
|
Security Threats Proposal for FTTR-4B
|
Huawei Technologies Co., Ltd. (China)
|
Q3/15
|
2024-06-15 |
|
[ 965 ]
(Rev.1) |
G.988: Traffic descriptor update for 50G-PON
|
Futurewei Technologies Inc. (United States)
,
Huawei Technologies Co., Ltd. (China)
|
Q2/15
|
2024-06-15 |
|
[ 964 ]
(Rev.1) |
Proposal update to clause 8.4.9 of ITU-T G.Sup72
|
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
State Grid Corporation of China
,
ZTE Corporation (China)
|
Q14/15, Q12/15
|
2024-06-14 |
|
[ 963 ]
(Rev.1) |
Proposal update to G.7711 clauses 2, 5, 6, A.1, I, I.13 and bibliography for v5.0
|
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
State Grid Corporation of China
|
Q14/15, Q12/15
|
2024-06-14 |
|
[ 962 ]
(Rev.1) |
Proposal update to G.7711 Appendix XVII "Controller Lifecycle and Security" for v5.0
|
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
State Grid Corporation of China
|
Q14/15, Q12/15
|
2024-06-14 |
|
[ 961 ]
(Rev.1) |
Proposal update to G.7711 Annex R "Temporal Expression" for v5.0
|
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
State Grid Corporation of China
|
Q14/15, Q12/15
|
2024-06-14 |
|
[ 960 ]
(Rev.1) |
Proposal update to G.7711 Annex O "Compute" for v5.0
|
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
State Grid Corporation of China
|
Q14/15, Q12/15
|
2024-06-14 |
|
[ 959 ]
(Rev.1) |
Proposal update to G.7711 Annex I "OAM" for v5.0
|
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
State Grid Corporation of China
|
Q14/15, Q12/15
|
2024-06-14 |
|
[ 958 ]
|
Proposal update to G.7711 Annex H "Control model" for v5.0
|
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
State Grid Corporation of China
|
Q14/15, Q12/15
|
2024-06-14 |
|
[ 957 ]
(Rev.1) |
Clarifications to proposed Self-Tuning Mechanism for revised G.698.4
|
Lumentum (United States)
,
NEC Corporation (Japan)
|
Q6/15
|
2024-06-14 |
|
[ 956 ]
|
G.hn: G9961 updates for the hierarchical bidirectional transmission
|
Maxlinear Inc (United States)
|
Q3/15
|
2024-06-14 |
|
[ 955 ]
|
G.hn: G9960 pending updates for the hierarchical bidirectional transmission
|
Maxlinear Inc (United States)
|
Q3/15
|
2024-06-14 |
|
[ 954 ]
|
Initial draft of Technical Paper section describing Q2/15 work
|
Futurewei Technologies Inc. (United States)
|
Q4/15, Q3/15, Q2/15, Q1/15
|
2024-06-14 |
|
[ 953 ]
|
Proposal for way forward on G.9804.4 (50G TWDM-PON)
|
Futurewei Technologies Inc. (United States)
|
Q2/15
|
2024-06-14 |
|
[ 952 ]
(Rev.1) |
Text proposal for draft revised Recommendation G.698.4
|
China Unicom
,
Telefon AB - LM Ericsson (Sweden)
|
Q6/15
|
2024-06-14 |
|
[ 951 ]
|
Crosstalk calculation with the self-tuning method proposed in WD06-26 (Berlin, 16-18 April 2024)
|
China Unicom
,
Telefon AB - LM Ericsson (Sweden)
|
Q6/15
|
2024-06-14 |
|
[ 950 ]
(Rev.1) |
Considerations on 50G-PON dual-rate receiving ability
|
China Telecommunications Corporation
|
Q2/15
|
2024-06-14 |
|
[ 949 ]
|
Proposed text refresh of 50G upstream parameters in G.9805
|
China Telecommunications Corporation
|
Q2/15
|
2024-06-14 |
Resultats:347 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):