Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 119 ]
|
Liaison statement to Working Party 5D (copied for information and action (if any) to Working Parties 4C, 5A, 6A, 7B and Task Group 5/1 and copied for information only to Working Parties 3J, 3K and 3M) - Modelling and simulation of IMT networks for use in sharing and compatibility studies
|
WP 4A
|
|
2016-10-06 |
|
[ 118 ]
|
Liaison statement to Working Parties 3K and 3M (copy for information to Working Party 5D) -
Propagation data and predictions for coexistence and compatibility studies between the satellite and terrestrial components of IMT systems in the 2 GHz band
|
WP 4C
|
|
2016-09-29 |
|
[ 117 ]
|
Information document on the updated tentative meeting schedule of Study Group 3 and its Working Parties
|
Chairman, SG 3
|
|
2016-08-12 |
|
[ 116 ]
+Ann.1-15 |
Report on the meeting of Working Party 3M (Geneva, 20-29 June 2016)
|
Chairman, WP 3M
|
|
2016-07-04 |
|
[ 115 ]
|
Liaison statement to Working Parties 4A, 4C, 6A and 7B (copied to Working Parties 3J, 3K, 3M and Task Group 5/1 for information) - Modelling and simulation of IMT networks for use in sharing and compatibility studies
|
WP 5D
|
|
2016-06-30 |
|
[ 114 ]
|
Final list of participants - Working Party 3M (Geneva, 20-29 June 2016)
|
Director, BR
|
|
2016-06-30 |
|
[ 113 ]
|
Documents to be considered in Working Party 3M
|
Chairman, WP 3M
|
|
2016-06-27 |
|
[ 112 ]
|
Liaison statement to Working Party 7B (copied to Working Parties 1A, 3M, 4A, 4B, 4C, 5B, 5C and 6A for information) - Technical and operational characteristics for the work under WRC-19 agenda item 1.7
|
WP 5D
|
AI1.7
|
2016-06-24 |
|
[ 111 ]
|
Liaison statement to Working Party 7B (copied to Working Parties 3M, 4C, 5A, 5B, 5C and 6A for information) - Technical and operational characteristics for the work under WRC-19 agenda item 1.3
|
WP 5D
|
AI1.3
|
2016-06-23 |
|
[ 110 ]
|
Liaison statement to Working Party 4A (copy to Working Parties 5A, 5C, 7D and 3M for information) - WRC-19 agenda item 9.1, issue 9.1.9
|
WP 5D
|
AI9.1
|
2016-06-23 |
|
[ 109 ]
|
Documents to be considered in Working Party 3M
|
Chairman, WP 3M
|
|
2016-06-21 |
|
[ 108 ]
|
Proposed revision to Recommendation ITU-R P.1812-4 - Smooth path diffraction loss
WP 3K agreed that Document 3K/65 should also be assigned to WP 3M.
|
LS telcom AG
|
|
2016-06-20 |
|
[ 107 ]
(Rev.1) |
Reply liaison statement to Study Group 3, Working Parties 3J, 3K, and 3M (copied for information to Task Group 5/1) - Propagation advice in support of WRC-19 agenda item 1.13: input requested from Working Party 5D
|
WP 5D
|
AI1.13
|
2016-06-20 |
|
[ 106 ]
|
List of documents issued (Documents 3M/1 - 3M/106)
|
BR Study Groups Department
|
|
2016-06-17 |
|
[ 105 ]
|
Proposed modifications to the Recommendation ITU-R P.452-16 - Hydrometeor-scatter interference prediction methodology - clarification (Document re-assigned from WP 3K)
|
Poland (Republic of)
|
|
2016-06-17 |
|
[ 104 ]
|
Building entry loss measurements at 3, 10 and 17 GHz frequencies
|
Orange
|
|
2016-06-10 |
|
[ 103 ]
|
Satellite measurement data at 20 GHz from high latitude locations in Inland and maritime climates
|
Telenor ASA
|
|
2016-06-13 |
|
[ 102 ]
|
Rain rate distributions from stations with long-term measurements in Norway
|
Telenor ASA
|
|
2016-06-13 |
|
[ 101 ]
|
Information document on ESA activity to support Study Group 3 activities on digital products
|
European Space Agency
,
Czech Technical University in Prague, Faculty of Electrical Engineering
|
|
2016-06-13 |
|
[ 100 ]
|
Updated rainfall rate statistics for DBSG3 Table IV-1
|
Spain
|
|
2016-06-13 |
|
[ 99 ]
|
Data pre-processing and format for Table IV-12
|
Spain
|
|
2016-06-13 |
|
[ 98 ]
|
Use of experimental drop size distributions for rain attenuation prediction
|
Spain
|
|
2016-06-13 |
|
[ 97 ]
|
Recommendation ITU-R P.1853-1: Question about parameters for time series of scintillation
|
European Space Agency
|
|
2016-06-13 |
|
[ 96 ]
|
Atmospheric depolarisation on slant paths, modelling of ice effects, comparison with new Ka band measurements in Portugal
|
Portugal
,
European Space Agency
|
|
2016-06-13 |
|
[ 95 ]
|
Atmospheric characterisation at Cebreros deep-space network sites by means of ground-base radiometric measurements
|
European Space Agency
|
|
2016-06-13 |
|
[ 94 ]
|
Proposed revision to Recommendation ITU-R P.[BEL] - Proposed building entry loss model up to 40 GHz in urban environment
|
Japan
|
211/3
|
2016-06-13 |
|
[ 93 ]
|
Contributions to ITU-R Study Group 3 databanks - Slant-path attenuation and rain rate statistics (Table II-1) and statistics of rain intensity (Table IV-1) from measurements in Ljubljana
|
Slovenia (Republic of)
,
European Space Agency
|
|
2016-06-13 |
|
[ 92 ]
|
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C and 5D - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz
|
WP 1A
|
|
2016-06-13 |
|
[ 91 ]
|
Proposed revision to Recommendation ITU-R P.452-16 - Clutter loss model for below-rooftop terminals urban environments
|
Korea (Republic of)
|
|
2016-06-13 |
|
[ 90 ]
|
Proposed revision of Recommendation ITU-R P.618-12 - A new approach for the effective path-length model for rain attenuation based on rain-cell characteristics: Additional test results for rain attenuation model based on the new test protocol
|
Korea (Republic of)
|
|
2016-06-13 |
|
[ 89 ]
|
Propagation measurements in Budapest, Hungary with Alphasat TDP5/ Aldo Paraboni Scientific Experiment
|
Hungary
,
European Space Agency
|
|
2016-06-13 |
|
[ 88 ]
|
Update of Recommendation ITU-R P.1238 (copy to Working Groups 3M and 3J for information)
|
Intel Corporation
|
|
2016-06-13 |
|
[ 87 ]
|
Update of Recommendation ITU-R P.452 (copy to Working Parties 3K and 3J for information)
|
Intel Corporation
|
|
2016-06-13 |
|
[ 86 ]
|
SCINTEX editorial changes
|
European Space Agency
|
|
2016-06-13 |
|
[ 85 ]
|
Proposed update of Recommendation ITU-R P.676-10 - "Attenuation by atmospheric gases"
|
Luxembourg
,
Italy
|
|
2016-06-13 |
|
[ 84 ]
|
Proposed editorial changes in Recommendation ITU-R P.618-12 - "Propagation data and prediction methods required for the design of Earth-space telecommunication systems"
|
Luxembourg
|
|
2016-06-13 |
|
[ 83 ]
|
Update set of validation examples for Earth-space propagation prediction methods
|
Luxembourg
|
|
2016-06-13 |
|
[ 82 ]
|
Short-term weather forecasts and radio-propagation models for optimizing data volume return in Ka-band satellite-to-Earth communication links
|
European Space Agency
,
Italy
|
|
2016-06-13 |
|
[ 81 ]
|
Report on activity of the Correspondence Group - Building entry loss
|
CG 3J-3K-3M-8
|
|
2016-06-13 |
|
[ 80 ]
|
Proposed revision of DBSG3 Table IV-1
|
France
,
European Space Agency
,
Italy
,
Portugal
,
Spain
|
|
2016-06-10 |
|
[ 79 ]
|
Building entry loss - Measurements in a large urban office
|
United Kingdom of Great Britain and Northern Ireland
|
|
2016-06-13 |
|
[ 78 ]
|
Contribution to ITU-R Study Group 3 databanks - Statistics of rain cell characteristics parameters derived from a meteorological radar in complex terrain
|
Austria
|
|
2016-06-12 |
|
[ 77 ]
|
Information document of Recommendation ITU-R P.452-16 - The suggestions of propagation modelling of IMT sharing and compatibility studies
|
China (People's Republic of)
|
|
2016-06-12 |
|
[ 76 ]
|
China _ 2012 model improvement and additional analysis with other rain attenuation prediction models proposed to Recommendation ITU-R P.618 and ITU-R P.530
|
China (People's Republic of)
|
|
2016-06-12 |
|
[ 75 ]
|
Building entry loss measurement results for above 6 GHz frequency band
|
China (People's Republic of)
|
|
2016-06-12 |
|
[ 74 ]
|
A conversion model of annual statistics to worst-month statistics for troposcatter
|
China (People's Republic of)
|
|
2016-06-12 |
|
[ 73 ]
|
Measurements results of building entry loss in the 2 GHz to 60 GHz frequency range
|
Telefon AB - LM Ericsson
|
|
2016-06-11 |
|
[ 72 ]
|
On Recommendation ITU-R P.452-16: Suggestions on propagation modelling to IMT sharing and coexistence studies
|
Telefon AB - LM Ericsson
|
|
2016-06-11 |
|
[ 71 ]
|
Progressing the working document towards a preliminary draft new Recommendation ITU-R P.[BEL] "Prediction of Building Entry Loss"
|
Telefon AB - LM Ericsson
|
|
2016-06-11 |
|
[ 70 ]
|
Discussion paper: building entry loss - Statistics, modelling and MM-wave measurements
|
United Kingdom of Great Britain and Northern Ireland
|
|
2016-06-10 |
Resultats:419 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):