Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : WP3M : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-R WP3M  C 

UIT-R WP3M

Propagation point-à-point et Terre-espace

Resultats:419 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Suivant Next
Contributions  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 119 ]  
 
Liaison statement to Working Party 5D (copied for information and action (if any) to Working Parties 4C, 5A, 6A, 7B and Task Group 5/1 and copied for information only to Working Parties 3J, 3K and 3M) - Modelling and simulation of IMT networks for use in sharing and compatibility studies     WP 4A     2016-10-06
[ 118 ]  
 
Liaison statement to Working Parties 3K and 3M (copy for information to Working Party 5D) - Propagation data and predictions for coexistence and compatibility studies between the satellite and terrestrial components of IMT systems in the 2 GHz band     WP 4C     2016-09-29
[ 117 ]  
 
Information document on the updated tentative meeting schedule of Study Group 3 and its Working Parties     Chairman, SG 3     2016-08-12
[ 116 ]  
+Ann.1-15 
Report on the meeting of Working Party 3M (Geneva, 20-29 June 2016)     Chairman, WP 3M     2016-07-04
[ 115 ]  
 
Liaison statement to Working Parties 4A, 4C, 6A and 7B (copied to Working Parties 3J, 3K, 3M and Task Group 5/1 for information) - Modelling and simulation of IMT networks for use in sharing and compatibility studies     WP 5D     2016-06-30
[ 114 ]  
 
Final list of participants - Working Party 3M (Geneva, 20-29 June 2016)     Director, BR     2016-06-30
[ 113 ]  
 
Documents to be considered in Working Party 3M     Chairman, WP 3M     2016-06-27
[ 112 ]  
 
Liaison statement to Working Party 7B (copied to Working Parties 1A, 3M, 4A, 4B, 4C, 5B, 5C and 6A for information) - Technical and operational characteristics for the work under WRC-19 agenda item 1.7     WP 5D   AI1.7   2016-06-24
[ 111 ]  
 
Liaison statement to Working Party 7B (copied to Working Parties 3M, 4C, 5A, 5B, 5C and 6A for information) - Technical and operational characteristics for the work under WRC-19 agenda item 1.3     WP 5D   AI1.3   2016-06-23
[ 110 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 5A, 5C, 7D and 3M for information) - WRC-19 agenda item 9.1, issue 9.1.9     WP 5D   AI9.1   2016-06-23
[ 109 ]  
 
Documents to be considered in Working Party 3M     Chairman, WP 3M     2016-06-21
[ 108 ]  
 
Proposed revision to Recommendation ITU-R P.1812-4 - Smooth path diffraction loss  
WP 3K agreed that Document 3K/65 should also be assigned to WP 3M.
 
LS telcom AG     2016-06-20
[ 107 ]  
(Rev.1) 
Reply liaison statement to Study Group 3, Working Parties 3J, 3K, and 3M (copied for information to Task Group 5/1) - Propagation advice in support of WRC-19 agenda item 1.13: input requested from Working Party 5D     WP 5D   AI1.13   2016-06-20
[ 106 ]  
 
List of documents issued (Documents 3M/1 - 3M/106)     BR Study Groups Department     2016-06-17
[ 105 ]  
 
Proposed modifications to the Recommendation ITU-R P.452-16 - Hydrometeor-scatter interference prediction methodology - clarification (Document re-assigned from WP 3K)     Poland (Republic of)     2016-06-17
[ 104 ]  
 
Building entry loss measurements at 3, 10 and 17 GHz frequencies     Orange     2016-06-10
[ 103 ]  
 
Satellite measurement data at 20 GHz from high latitude locations in Inland and maritime climates     Telenor ASA     2016-06-13
[ 102 ]  
 
Rain rate distributions from stations with long-term measurements in Norway     Telenor ASA     2016-06-13
[ 101 ]  
 
Information document on ESA activity to support Study Group 3 activities on digital products     European Space Agency , Czech Technical University in Prague, Faculty of Electrical Engineering     2016-06-13
[ 100 ]  
 
Updated rainfall rate statistics for DBSG3 Table IV-1     Spain     2016-06-13
[ 99 ]  
 
Data pre-processing and format for Table IV-12     Spain     2016-06-13
[ 98 ]  
 
Use of experimental drop size distributions for rain attenuation prediction     Spain     2016-06-13
[ 97 ]  
 
Recommendation ITU-R P.1853-1: Question about parameters for time series of scintillation     European Space Agency     2016-06-13
[ 96 ]  
 
Atmospheric depolarisation on slant paths, modelling of ice effects, comparison with new Ka band measurements in Portugal     Portugal , European Space Agency     2016-06-13
[ 95 ]  
 
Atmospheric characterisation at Cebreros deep-space network sites by means of ground-base radiometric measurements     European Space Agency     2016-06-13
[ 94 ]  
 
Proposed revision to Recommendation ITU-R P.[BEL] - Proposed building entry loss model up to 40 GHz in urban environment     Japan   211/3   2016-06-13
[ 93 ]  
 
Contributions to ITU-R Study Group 3 databanks - Slant-path attenuation and rain rate statistics (Table II-1) and statistics of rain intensity (Table IV-1) from measurements in Ljubljana     Slovenia (Republic of) , European Space Agency     2016-06-13
[ 92 ]  
 
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C and 5D - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz     WP 1A     2016-06-13
[ 91 ]  
 
Proposed revision to Recommendation ITU-R P.452-16 - Clutter loss model for below-rooftop terminals urban environments     Korea (Republic of)     2016-06-13
[ 90 ]  
 
Proposed revision of Recommendation ITU-R P.618-12 - A new approach for the effective path-length model for rain attenuation based on rain-cell characteristics: Additional test results for rain attenuation model based on the new test protocol     Korea (Republic of)     2016-06-13
[ 89 ]  
 
Propagation measurements in Budapest, Hungary with Alphasat TDP5/ Aldo Paraboni Scientific Experiment     Hungary , European Space Agency     2016-06-13
[ 88 ]  
 
Update of Recommendation ITU-R P.1238 (copy to Working Groups 3M and 3J for information)     Intel Corporation     2016-06-13
[ 87 ]  
 
Update of Recommendation ITU-R P.452 (copy to Working Parties 3K and 3J for information)     Intel Corporation     2016-06-13
[ 86 ]  
 
SCINTEX editorial changes     European Space Agency     2016-06-13
[ 85 ]  
 
Proposed update of Recommendation ITU-R P.676-10 - "Attenuation by atmospheric gases"     Luxembourg , Italy     2016-06-13
[ 84 ]  
 
Proposed editorial changes in Recommendation ITU-R P.618-12 - "Propagation data and prediction methods required for the design of Earth-space telecommunication systems"     Luxembourg     2016-06-13
[ 83 ]  
 
Update set of validation examples for Earth-space propagation prediction methods     Luxembourg     2016-06-13
[ 82 ]  
 
Short-term weather forecasts and radio-propagation models for optimizing data volume return in Ka-band satellite-to-Earth communication links     European Space Agency , Italy     2016-06-13
[ 81 ]  
 
Report on activity of the Correspondence Group - Building entry loss     CG 3J-3K-3M-8     2016-06-13
[ 80 ]  
 
Proposed revision of DBSG3 Table IV-1     France , European Space Agency , Italy , Portugal , Spain     2016-06-10
[ 79 ]  
 
Building entry loss - Measurements in a large urban office     United Kingdom of Great Britain and Northern Ireland     2016-06-13
[ 78 ]  
 
Contribution to ITU-R Study Group 3 databanks - Statistics of rain cell characteristics parameters derived from a meteorological radar in complex terrain     Austria     2016-06-12
[ 77 ]  
 
Information document of Recommendation ITU-R P.452-16 - The suggestions of propagation modelling of IMT sharing and compatibility studies     China (People's Republic of)     2016-06-12
[ 76 ]  
 
China _ 2012 model improvement and additional analysis with other rain attenuation prediction models proposed to Recommendation ITU-R P.618 and ITU-R P.530     China (People's Republic of)     2016-06-12
[ 75 ]  
 
Building entry loss measurement results for above 6 GHz frequency band     China (People's Republic of)     2016-06-12
[ 74 ]  
 
A conversion model of annual statistics to worst-month statistics for troposcatter     China (People's Republic of)     2016-06-12
[ 73 ]  
 
Measurements results of building entry loss in the 2 GHz to 60 GHz frequency range     Telefon AB - LM Ericsson     2016-06-11
[ 72 ]  
 
On Recommendation ITU-R P.452-16: Suggestions on propagation modelling to IMT sharing and coexistence studies     Telefon AB - LM Ericsson     2016-06-11
[ 71 ]  
 
Progressing the working document towards a preliminary draft new Recommendation ITU-R P.[BEL] "Prediction of Building Entry Loss"     Telefon AB - LM Ericsson     2016-06-11
[ 70 ]  
 
Discussion paper: building entry loss - Statistics, modelling and MM-wave measurements     United Kingdom of Great Britain and Northern Ireland     2016-06-10
Resultats:419 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2019-08-23