Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : NGN GSI : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T NGN GSI  C 

UIT-T NGN GSI

Initiative "Normes mondiales sur les réseaux NGN"

Période d'études 2005

Resultats:1303 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27  - Suivant Next
Contributions  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 953 ]  
 
Missing Functional Requirement of Load Sharing for Multicast Data Delivery     Huawei Technologies Co., Ltd.   Q2/13   2008-05-04
[ 952 ]  
 
Load Sharing Function for NGN Multicast     Huawei Technologies Co., Ltd.   Q3/13   2008-05-04
[ 951 ]  
 
Propose for Presentation of CBT in Y.CMR     Huawei Technologies Co.,Ltd.   Q8/13   2008-05-04
[ 950 ]  
 
Propose for Duplication of CBT in Y.CMR     Huawei Technologies Co.,Ltd.   Q8/13   2008-05-04
[ 949 ]  
 
Propose for CBT new use case in section 7.2 and 7.3 of Y.CMR     Huawei Technologies Co.,Ltd.   Q8/13   2008-05-04
[ 948 ]  
 
Propose for CRBT service flow in call Server Domain in Q.CRBT_CRT     Huawei Technologies Co.,Ltd.   Q2/11   2008-05-04
[ 947 ]  
 
Propose for CRBT service flow in Section 6.5 of Q.CRBT_CRT(2)     Huawei Technologies Co.,Ltd.   Q3/11, Q2/11   2008-05-04
[ 946 ]  
 
Propose for CRBT service flow in Section 6.5 of Q.CRBT_CRT(1)     Huawei Technologies Co.,Ltd.   Q3/11, Q2/11   2008-05-05
[ 945 ]  
 
Propose for authentication and authorization for different services and applications in draft IDM Framework     Huawei Technologies Co.,Ltd.   Q15/13   2008-05-04
[ 944 ]  
 
Addition of multicast unicast admission control example for reporting mode     Huawei Technologies Co., Ltd.   Q4/13   2008-05-04
[ 943 ]  
 
A resource control scenario for multicast     Huawei Technologies Co., Ltd.   Q4/13   2008-05-04
[ 942 ]  
 
Proposal for Y.MCFArch 6.4 reference points     China Mobile, Huawei Technologies Co., Ltd.   Q3/13   2008-05-04
[ 941 ]  
 
Proposal for Functional Description and Information Flows - pre-authentication     China Mobile, Huawei Technologies Co., Ltd.   Q3/13   2008-05-04
[ 940 ]  
 
Proposal for Functional Description and Information Flows - network discovery     China Mobile, Huawei Technologies Co., Ltd.   Q3/13   2008-05-04
[ 939 ]  
 
Proposal for Functional Description and Information Flows - initial attachment     China Mobile, Huawei Technologies Co., Ltd.   Q3/13   2008-05-04
[ 938 ]  
 
Information flows for location management and handover execution in Y.MCFArch     China Mobile, Huawei Technologies Co., Ltd.   Q3/13   2008-05-04
[ 937 ]  
 
High level functions of Y.MCFArch     China Mobile, Huawei Technologies Co., Ltd.   Q3/13   2008-05-04
[ 936 ]  
 
Proposals to Q.QCP     British Telecom, Huawei Technologies Co., Ltd.   Q5/11   2008-05-04
[ 935 ]  
 
The Rh' reference point     ZTE Corporation   Q4/13   2008-05-04
[ 934 ]  
 
The Procedure of the Distributed PD-FE Architecture     ZTE Corporation   Q4/13   2008-05-04
[ 933 ]  
 
The Functions of the HPE-FE     ZTE Corporation   Q4/13   2008-05-04
[ 932 ]  
 
Proposing another solution to locate visited TLM-FE     ZTE Corporation   Q3/13   2008-05-04
[ 931 ]  
 
Proposed Clarification and Rewording of Y.cmr     ZTE Corporation   Q8/13   2008-05-05
[ 930 ]  
 
Proposed network layer handover procedure for Y.RACF     ZTE Corporation   Q4/13   2008-05-04
[ 929 ]  
 
Proposed impact of security on QoS performance in Y.Secmechanisms     ZTE Corporation   Q15/13   2008-05-04
[ 928 ]  
 
Proposed impact of security on QoS performance in Y.racf R2     ZTE Corporation   Q15/13, Q4/13   2008-05-04
[ 927 ]  
 
Propose the location of functional entity supporting Layer-3 mobility for Y.MCFArch     ZTE Corporation   Q3/13   2008-05-04
[ 926 ]  
 
Proposal to move the PD-FE selection mechanism to a right section in Y.RACF (Y.2111)     ZTE Corporation   Q4/13   2008-05-04
[ 925 ]  
 
Proposal to modification to section GSC-FE of Draft Recom. Y.NGN-FRA R2     ZTE Corporation   Q3/13   2008-05-04
[ 924 ]  
 
Proposal to modification to section 8.2 of Y.ngn-accounting R2     ZTE Corporation   Q2/13   2008-05-04
[ 923 ]  
 
Proposal to add the clarification in Figure 20 in Y.RACF (Y.2111)     ZTE Corporation   Q4/13   2008-05-04
[ 922 ]  
 
A Proposal on studying Next Generation Call Centre Technology in NGN     China Telecom, ZTE Corporation   Q2/13   2008-05-05
[ 921 ]  
 
Proposal of some modifications and addition to the draft Recommendation Q.LMF     ZTE Corporation   Q2/19, Q5/13   2008-05-04
[ 920 ]  
 
Proposal for initiating the study on IP based mobility security for NGN     ZTE Corporation   Q15/13   2008-05-05
[ 919 ]  
 
Proposal for host based mobility control scenarios and procedures for Y.MCFArch     ZTE Corporation   Q3/13   2008-05-04
[ 918 ]  
 
Proposal for adding a mobility support scenario in RACF     ZTE Corporation   Q4/13   2008-05-04
[ 917 ]  
 
Online charging scenario based on policy     ZTE Corporation   Q2/13   2008-05-04
[ 916 ]  
 
Offline charging scenario based on Session     ZTE Corporation   Q2/13   2008-05-05
[ 915 ]  
 
Offline charging scenario based on Event     ZTE Corporation   Q2/13   2008-05-04
[ 914 ]  
 
Network-based mobility control scenarios and procedures     ZTE Corporation   Q7/11, Q3/13   2008-05-04
[ 913 ]  
 
Modification the description in Functional Architecture     ZTE Corporation   Q4/13   2008-05-04
[ 912 ]  
 
Modification of functional requirements for control functions in Y.ipsplit     ZTE Corporation   Q3/13   2008-05-04
[ 911 ]  
 
Modification for the ABG-FE to CBG-FE in FRA R2     ZTE Corporation   Q3/13   2008-05-04
[ 910 ]  
 
Issues about the impacts on RACF in Y.MCFArch     ZTE Corporation   Q4/13   2008-05-04
[ 909 ]  
 
Example of implementation of RACF for CPEs     ZTE Corporation   Q4/13   2008-05-05
[ 908 ]  
 
Centralized RACF Architecture in MPLS-TE Core Networks in Outsourcing Mode     ZTE Corporation   Q4/13   2008-05-04
[ 907 ]  
 
Add the resource control procedure     ZTE Corporation   Q4/13   2008-05-04
[ 906 ]  
 
Add charging information over Reference point Rw     ZTE Corporation   Q4/13   2008-05-04
[ 905 ]  
 
Add charging correlation information items to the Nc     ZTE Corporation   Q4/13   2008-05-04
[ 904 ]  
 
Add charging correlation information component to Ru     ZTE Corporation   Q4/13   2008-05-04
Resultats:1303 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2008-08-28