Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG 15 : Réunion 2020-01-27 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG 15  C (2020-01-27) 

UIT-T SG 15

Transport, access and home

Période d'études 2017

Réunion  du 2020-01-27 au 2020-02-07

Lieu : Suisse [Genève]

Autres réunions : 2021-12-06  2021-04-12  2020-09-07  2019-07-01  2018-10-08  2018-01-29  2017-06-19 

Resultats:436 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Suivant Next
Contributions  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 1621 ]  
 
Additional use case for technical paper of G.hn in industrial application     Huawei Technologies Co., Ltd. (China)   Q18/15   2020-01-13
[ 1620 ]  
 
Proposal on the attenuation specification value of G.654.E fibre     Corning Incorporated (United States) , OFS Fitel, LLC (United States) , Prysmian SpA (Italy) , Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)   Q6/15, Q5/15   2020-01-13
[ 1619 ]  
 
Proposed updates to Draft revised Recommendation G.8151/Y.1374     China Information Communication Technologies Group   Q14/15   2020-01-13
[ 1618 ]  
 
Proposed updates to Draft revised Recommendation G.8051/Y.1345     China Information Communication Technologies Group   Q14/15   2020-01-13
[ 1617 ]  
 
New IEEE 802.3 timestamp project     Microsemi Corporation (United States)   Q13/15, Q11/15   2020-01-12
[ 1616 ]  
 
Towards keeping Sub1G Simple to Implement     Microsemi Corporation (United States)   Q11/15   2020-01-12
[ 1615 ]  
 
Thoughts on the layers and end-points for OTN Security     Microsemi Corporation (United States)   Q11/15   2020-01-12
[ 1614 ]  
 
Comparison of MTN Path overhead options     Microsemi Corporation (United States)   Q11/15   2020-01-12
[ 1613 ]  
 
MTN Path Overhead Proposal - Overhead Frame Structure     Microsemi Corporation (United States)   Q11/15   2020-01-12
[ 1612 ]  
 
Introduction of alternative tail-end tuning into G.698.4     ADVA Optical Networking (United Kingdom) , China Unicom , Telefon AB - LM Ericsson (Sweden)   Q6/15   2020-01-12
[ 1611 ]  
 
Fibre propagation delay measurement with a practical FPGA based system     ADVA Optical Networking (United Kingdom) , Deutsche Telekom AG (Germany) , Orange Polska S.A. (Poland)   Q6/15   2020-01-11
[ 1610 ]  
 
Cable identification using application of a voltage for metallic wire     Communication Line Products Association of Japan   Q17/15   2020-01-11
[ 1609 ]  
 
Maximum Spectral Excursion definition for 25G interfaces     ADVA Optical Networking (United Kingdom)   Q6/15   2020-01-11
[ 1608 ]  
 
G.mtn-prot - APS Protocol     Huawei Technologies Co., Ltd. (China)   Q11/15   2020-01-11
[ 1607 ]  
 
MTN Protection Switching Architecture     Huawei Technologies Co., Ltd. (China)   Q12/15, Q11/15   2020-01-11
[ 1606 ]  
 
MTN Linear Protection - Network Objectives     Huawei Technologies Co., Ltd. (China)   Q11/15   2020-01-11
[ 1605 ]  
 
Skeleton and text proposal for MTN equipment Recommendation     Huawei Technologies Co., Ltd. (China)   Q11/15   2020-01-11
[ 1604 ]  
 
FEC bypass indication mode and FEC degraded SER     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China)   Q11/15   2020-01-11
[ 1603 ]  
 
consolidation of idle block adaptation process and invalid block replacement process     Huawei Technologies Co., Ltd. (China)   Q11/15   2020-01-11
[ 1602 ]  
 
Discussion for handling error contamination issue     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China)   Q11/15   2020-01-11
[ 1601 ]  
 
Specification consideration on idle block adaptation at MTN section adaptation     Huawei Technologies Co., Ltd. (China)   Q11/15   2020-01-11
[ 1600 ]  
 
Statistical evaluation of block formatting process's impact on MTN path error monitoring     Huawei Technologies Co., Ltd. (China)   Q11/15   2020-01-11
[ 1599 ]  
 
Path layer error monitoring mechanism analysis     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China)   Q11/15   2020-01-11
[ 1598 ]  
 
MTN UNI and NNI fault condition processing consideration     Huawei Technologies Co., Ltd. (China)   Q11/15   2020-01-11
[ 1597 ]  
 
Discussion and comparison of proposed OAM mechanisms     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China)   Q11/15   2020-01-11
[ 1596 ]  
 
Proposal for the specification of MTN path subnetwork     Huawei Technologies Co., Ltd. (China)   Q11/15   2020-01-11
[ 1595 ]  
 
Outline proposal for a draft new recommendation G.mtn architecture     Huawei Technologies Co., Ltd. (China)   Q12/15   2020-01-14
[ 1594 ]  
 
Proposals on WP2/15 restructuring for the next study period     Japan   Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15   2020-01-11
[ 1593 ]  
 
L.100-rev 2020 criteria rationale     OFS Fitel, LLC (United States)   Q16/15   2020-01-10
[ 1592 ]  
 
Open Cable budget proposal for Recommendation G.977.1     Subcom, LLC (United States)   Q8/15   2020-01-10
[ 1591 ]  
 
Monitoring Oscillator and Frequency Fault     Ciena Canada   Q13/15   2020-01-10
[ 1590 ]  
 
Timing distribution over G.mtn interfaces     Ciena Canada   Q13/15   2020-01-10
[ 1589 ]  
 
SyncE for PAM4 based interfaces     Ciena Canada   Q13/15   2020-01-10
[ 1588 ]  
 
Specific management of telecommunications     Central African Rep.   Q17/15   2020-01-10
[ 1587 ]  
 
Detailed explanation on the request for assistance from ITU-T     Ministère des Postes, des Télécommunications et de l'Economie Numérique (Guinea)   QALL/15   2020-01-10
[ 1586 ]  
 
Proposal to specify oFEC for FlexO-LR 450 km application     Acacia Communications, Inc (United States)   Q11/15   2020-01-10
[ 1585 ]  
 
Draft new recommendation for Requirements for Fibre Optic Network Terminal Box: L.font     Ministry of Communications (India) , Sterlite Optical Technologies Ltd (India)   Q16/15   2020-01-10
[ 1584 ]  
 
Proposal to include a new Appendix to the Draft New Recommendation ITU-T L.oha "Optical fibre cables for in-home applications"     Ministry of Communications (India) , Sterlite Optical Technologies Ltd (India)   Q16/15   2020-01-10
[ 1583 ]  
 
Proposal on new Technical Report for "Optical fibre and cable for space division multiplexing transmission"     Communication Line Products Association of Japan , KDDI Corporation (Japan) , NEC Corporation (Japan) , Nippon Telegraph and Telephone Corporation (NTT) (Japan)   Q5/15   2020-01-10
[ 1582 ]  
 
Proposed modification to Appendix III of Recommendation G.650.1     Communication Line Products Association of Japan , Nippon Telegraph and Telephone Corporation (NTT) (Japan)   Q5/15   2020-01-10
[ 1581 ]  
 
Modification proposal on draft new Recommendation G.977.1     Communication Line Products Association of Japan , NEC Corporation (Japan) , Nippon Telegraph and Telephone Corporation (NTT) (Japan)   Q8/15   2020-01-10
[ 1580 ]  
 
Proposal of update of GNSS-TR     Nippon Telegraph and Telephone Corporation (NTT) (Japan)   Q13/15   2020-01-10
[ 1579 ]  
 
Proposal of methods of PRTC time error measurement assuming non-ideal GNSS signal reception environments     Nippon Telegraph and Telephone Corporation (NTT) (Japan)   Q13/15   2020-01-10
[ 1578 ]  
 
Proposal of revised Appendix of TDD interference in G.8271     Nippon Telegraph and Telephone Corporation (NTT) (Japan)   Q13/15   2020-01-10
[ 1577 ]  
 
Consideration of cascaded T-TC media converters on G.8273.3 Amd2     NEC Corporation (Japan)   Q13/15   2020-01-10
[ 1576 ]  
 
Relative cost analysis to determine the number of TWDM channels in G.9804 series     Nippon Telegraph and Telephone Corporation (NTT) (Japan)   Q2/15   2020-01-10
[ 1575 ]  
 
Proposal for ComTC Clause 19     Futurewei Technologies US R&D Center (United States)   Q2/15   2020-01-10
[ 1574 ]  
 
Proposal for ComTC Clause 18     Futurewei Technologies US R&D Center (United States)   Q2/15   2020-01-10
[ 1573 ]  
 
Proposal for ComTC Clause 17     Futurewei Technologies US R&D Center (United States)   Q2/15   2020-01-10
[ 1572 ]  
 
Proposal for ComTC Clause 16     Futurewei Technologies US R&D Center (United States)   Q2/15   2020-01-10
Resultats:436 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-8-9