International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP-7D : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP-7D  C 

ITU-R WP-7D

Radio Astronomy

Results:244 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 194 ]  
 
Draft revision of Recommendation ITU-R RA.314-10 - Preferred frequency bands for radio astronomical measurements     Committee on Radio Astronomy Frequencies     2022-09-20
[ 193 ]  
 
Updates to working document toward a preliminary draft new Report ITU-R RA.[Harmonics] - Unwanted emissions created by harmonics in radio astronomy bands: measurement of impacts of harmonic emission at radio facilities     United States of America     2022-09-20
[ 192 ]  
 
Updates to the preliminary draft new Report - Technical and operational characteristics of widely-distributed array systems operating above 200 GHz     United States of America     2022-09-20
[ 191 ]  
 
Updates to working document towards a preliminary draft new Report ITU-RA.[67-116 GHz] - Technical and operational characteristics of radio astronomy systems and sharing feasibility in the 3-4 mm band (67-116 GHz)     United States of America     2022-09-20
[ 190 ]  
 
Updates to preliminary draft new Report ITU-R RA.[350MHz] - Technical and operational characteristics of radio astronomy systems operating below 350 MHz     United States of America   Q237/7, Q145/7, Q129/7   2022-09-20
[ 189 ]  
 
Updates to working document towards a preliminary draft new Report ITU-R RA.[RAS-IMT-COMPAT-43 GHZ] - Possible coordination and protection measures for stations of the radio astronomy service operating in the 42.5-43.5 GHz allocation and IMT systems operating in the 37-43.5 GHz mobile service allocation     United States of America     2022-09-20
[ 188 ]  
 
Updates to preliminary draft new Question ITU-R XXX/7 - Radio astronomy in the shielded zone of the Moon     United States of America     2022-09-20
[ 187 ]  
 
Updates to working document toward a preliminary draft new Report ITU-R RA.CMB - Technical and Operational Characteristics of Broadband, Background-Limited Bolometers Operating in the mm Wave Regime     United States of America     2022-09-20
[ 186 ]  
 
Elevation of the preliminary draft new Report on Geodetic VLBI     United States of America     2022-09-20
[ 185 ]  
 
Preliminary position on WRC-23 Agenda     World Meteorological Organization     2022-09-20
[ 184 ]  
 
Report on Working Party 7D Correspondence Group on updates to the working document towards a preliminary draft new Report [HARMONICS]     Chairman, CG     2022-09-19
[ 183 ]  
 
Reply liaison statement to Working Party 5B (copy to Working Party 7D for information) - Draft CPM text for WRC-23 agenda item 1.11, Resolution 361 (Rev.WRC-19)     WP 4C     2022-09-19
[ 182 ]  
 
Liaison statement to Working Party 3M (copy to Working Parties 1A, 1B, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Extending the application of propagation Recommendations to frequencies greater than 100 GHz     WP 4B     2022-09-19
[ 181 ]  
 
Working document towards a preliminary draft new Report ITU-R RA.[67-116GHz] - Technical and operational characteristics of radio astronomy systems and sharing feasibility in the 3-4 mm band (67-116 GHz)     Korea (Republic of)     2022-09-15
[ 180 ]  
 
Updates to working document towards a preliminary draft new Report ITU-R RA.[RAS-IMT-COMPAT-43-GHz] - Possible coordination and protection measures for stations of the radio astronomy service from IMT systems operating in shared and adjacent bands within 42.5 to 43.5 GHz     Korea (Republic of)     2022-09-15
[ 179 ]  
 
Draft revision of Report ITU-R RA.2188-0 (2010) - Power flux-density and e.i.r.p. levels potentially damaging to radio astronomy receivers     Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science     2022-08-31
[ 178 ]  
 
Liaison statement to Working Party 4C (copy for information to Working Party 7D) - Draft CPM text for WRC-23 agenda item 1.11, Resolution 361 (Rev.WRC-19)     WP 5B   AI1.11   2022-08-03
[ 177 ]  
 
Reply liaison statement to Working Parties 7C and 7D (copy to Working Parties 4C, 5A and 5D for information) - Beam WPT     WP 1A     2022-07-20
[ 176 ]  
 
Liaison statement to Working Parties 5A, 5B, 5C, and 5D (copy to Working Parties 7C and 7D for information) - Draft revision of Report ITU-R SM.2352-0     WP 1A     2022-07-11
[ 175 ]  
 
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D - WRC-23 agenda item 1.4     WP 5D   AI1.4   2022-07-01
[ 174 ]  
 
Reply liaison statement to Working Party 7C (copy to Working Parties 4A, 4C, 5B, 5C, and 7D for information) - WRC-23 agenda item 1.14 Activities     WP 5A   AI1.14   2022-06-20
[ 173 ]  
 
Liaison statement to Working Parties 1A, 1B, 1C, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Future development of P-series recommendations to address frequencies above 100 GHz     WP 3M     2022-06-14
[ 172 ]  
 
Reply liaison statement to Working Party 7C (Copy to Workings Parties 4A, 4C, 5B, 5A and 7D) - WRC-23 agenda item 1.14     WP 5C   AI1.14   2022-06-13
[ 171 ]  
 
Reply liaison statement to Working Party 7B (copy to Working Parties 3K, 3M, 4A, 5A, 5B, 7C and 7D for information) - Activities relating to WRC-23 agenda item 1.13     WP 5C   AI1.13   2022-06-06
[ 170 ]  
 
Reply liaison statement to Working Party 7B (copy to Working Parties 3K, 3M, 4A, 5B, 5C, 7C, and 7D for information) - Activities relating to WRC-23 agenda item 1.13     WP 5A   AI1.13   2022-06-06
[ 169 ]  
 
Reply liaison statement to Working Party 5B (copy to Working Party 7D and IMO for information) - WRC-23 agenda item 1.11, Resolution 361 (Rev.WRC-19)     WP 4C   AI1.11   2022-05-16
[ 168 ]  
 
Reply liaison statement to Working Party 1A (copy to Working Party 7D for information) - Editorial update of Recommendation ITU-R SM.329     WP 7C     2022-05-06
[ 167 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, and 7D (copy to Working Parties 3J and 3M for information) - WRC-23 agenda item 1.14     WP 7C   AI1.14   2022-05-06
[ 166 ]  
 
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 5D, 6A, and 7D - Preliminary draft CPM text on WRC-23 agenda item 9.1, topic a)     WP 7C   AI9.1A)   2022-05-06
[ 165 ]  
 
Liaison statement to Working Parties 3K, 3M, 4A, 5A, 5B, 5C, 7C, and 7D - Report on progress of activities relating to agenda item 1.13 (WRC-23)     WP 7B   AI1.13   2022-05-05
[ 164 ]  
+Ann.1-14 
Report of the meeting of Working Party 7D (Geneva, 25-29 April 2022)     Chairman, WP 7D     2022-04-29
[ 163 ]  
 
Working Party 7D - Final List of Participants (Geneva, 25-29 April 2022)     Director, BR     2022-04-29
[ 162 ]  
 
List of documents issued (Documents 7D/120 - 7D/162)     BR, Study Groups Department     2022-04-25
[ 161 ]  
 
Working document toward a preliminary draft new Report - Unwanted emissions created by harmonics in radio astronomy bands: measurement of impacts of harmonic emission to radio facilities     Germany (Federal Republic of) , Committee on Radio Astronomy Frequencies   Q145/7   2022-04-14
[ 160 ]  
 
Updates to working document toward a preliminary draft new Report - Unwanted emissions created by harmonics in radio astronomy bands: measurement of impacts of harmonic emission to radio facilities     United States of America     2022-04-18
[ 159 ]  
 
Draft liaison statement to Working Party 1A - Editorial corrections to Recommendation ITU-R SM.329-12     United States of America     2022-04-18
[ 158 ]  
 
Updates to the preliminary draft new Report - Technical and operational characteristics of widely distributed-array mm-wave and sub-mm-wave systems above 200 GHz     United States of America     2022-04-18
[ 157 ]  
 
Working document towards a preliminary draft new Report ITU-R RA.[67-116GHz] - Technical and operational characteristics of radio astronomy systems in the 3-4 mm band (67-116 GHz)     United States of America     2022-04-18
[ 156 ]  
 
Updates to working document towards a preliminary draft new Report ITU-R RA.[300MHz] - Technical and operational characteristics of radio astronomy systems operating below 300 MHz     United States of America     2022-04-18
[ 155 ]  
 
Updates to working document towards a preliminary draft new Report ITU-R RA.[RAS-IMT-COMPAT-43 GHz] - Possible coordination and protection measures for stations of the radio astronomy service from IMT systems operating in shared and adjacent bands within 42.5 to 43.5 GHz     United States of America     2022-04-18
[ 154 ]  
 
Contribution towards a working document toward a preliminary draft new Question ITU-R XXX/7 - Facilitation of radio astronomy service operations in the shielded zone of the Moon     United States of America     2022-04-18
[ 153 ]  
 
Updates to working document toward a preliminary draft new Report - Technical and operational characteristics of bolometers operating in the millimeter-wave regime     United States of America     2022-04-18
[ 152 ]  
 
Updates to the working document towards a preliminary draft new Report on Geodetic VLBI     United States of America     2022-04-18
[ 151 ]  
 
Working document towards a preliminary draft new Report - Technical and operational characteristics of radio astronomy systems operating below 300 MHz     Square Kilometre Array Organisation     2022-04-19
[ 150 ]  
 
Updates to working document towards PDN Report ITU-R RA.[RAS-IMT-COMPAT-43-GHz] - Possible coordination and protection measures for stations of the radio astronomy service from IMT systems operating in shared and adjacent bands within 42.5 to 43.5 GHz     Committee on Radio Astronomy Frequencies     2022-04-15
[ 149 ]  
 
Updates to working document towards a preliminary draft new Report - Technical and operational characteristics of radio astronomy systems operating below 300 MHz     Committee on Radio Astronomy Frequencies     2022-04-15
[ 148 ]  
 
Working document toward a preliminary draft new Report - Technical and operational characteristics of bolometers operating in the millimeter-wave regime     Committee on Radio Astronomy Frequencies     2022-04-15
[ 147 ]  
 
Liaison statement to Working Party 4C (copy to Working Party 7D for information) - WRC-23 agenda item 1.11, Resolution 361 (Rev.WRC-19)     WP 5B   AI1.11   2022-04-14
[ 146 ]  
 
Updates to working document towards a preliminary draft new Report - Technical and operational characteristics of radio astronomy systems operating below 300 MHz     Australia     2022-04-14
[ 145 ]  
 
Request for characteristics of SRS data relay system links needed to enable compatibility studies with the radio astronomy service - WRC-23 agenda item 1.13     Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science   AI1.13   2022-04-12
Results:244 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2023-11-12