Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG15 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG15  C 

UIT-T SG15

Transport network structures

Période d'études 2009

Resultats:398 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Suivant Next
Contributions  [ AI/Question: Q4/15 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 1486 ]  
 
G.hnem: Proposal for update of the text for sections 7.4.5 -7.4.7, 7.5     Lantiq AEG   Q4/15   2011-02-02
[ 1485 ]  
 
G.hnem: Proposal for the number of symbols for PFH transmission     Lantiq AEG   Q4/15   2011-02-02
[ 1484 ]  
 
G.hn: Proposal for AKM procedure update for multicast     Lantiq   Q4/15   2011-02-02
[ 1483 ]  
 
G.hn: Proposal for using CTMG frame for all short management messages     Lantiq   Q4/15   2011-02-02
[ 1482 ]  
 
G.hn: Proposal for channel estimation protocol update     Lantiq   Q4/15   2011-02-02
[ 1481 ]  
 
G.hn: Miscellaneous G.9961 corrigendum issues     Lantiq   Q4/15   2011-02-02
[ 1480 ]  
 
G.hn: Miscellaneous G.9960 corrigendum issues     Lantiq   Q4/15   2011-02-02
[ 1479 ]  
 
G.hn: Miscellaneous G.9960 amendment issues     Lantiq   Q4/15   2011-02-02
[ 1478 ]  
 
G.hnem: Proposal for the text update for section 7.8 (PMI)     Lantiq AEG   Q4/15   2011-02-02
[ 1477 ]  
 
G.hnem: Proposal for updates in the text of section 7.7.3     Lantiq AEG   Q4/15   2011-02-02
[ 1476 ]  
 
G.hnem: Proposal for update of the text for section 7.4.1-7.4.4     Lantiq AEG   Q4/15   2011-02-02
[ 1475 ]  
 
Updates to §7.2.3.1 on PFH     Yitran Communications   Q4/15   2011-02-02
[ 1474 ]  
 
Interleaver Design     Yitran Communications   Q4/15   2011-02-02
[ 1473 ]  
 
G.hnem: Proposal for update of the text for section 7.3     Lantiq AEG   Q4/15   2011-02-02
[ 1472 ]  
 
Discussion on Channel Estimation Symbols     Yitran Communications   Q4/15   2011-02-02
[ 1471 ]  
 
G.vdsl, G.hn: BT's FTTdp Vision     BT   Q4/15   2011-02-02
[ 1470 ]  
 
Comments to G3     Yitran Communications   Q4/15   2011-02-02
[ 1469 ]  
 
G.hnem: Proposal for update of the text for sections 7.1, 7.2     Lantiq AEG   Q4/15   2011-02-02
[ 1466 ]  
 
G.hnem: Proposal for the text update of Annex C     Lantiq AEG   Q4/15   2011-02-02
[ 1464 ]  
 
G.hnem: Informative Appendix to describe use cases and installation examples     Lantiq AEG   Q4/15   2011-02-02
[ 1460 ]  
 
G.gen: G.vdsl: G.hn: On the feasibility of a low complexity G.hn based FTTdp solution     CopperGate Communications   Q4/15   2011-02-02
[ 1444 ]  
 
G.hn: corrections to Tunnel termination for a corrigendum to G.9961     CopperGate Communications   Q4/15   2011-02-02
[ 1443 ]  
 
G.hn: Handling multicast traffic in G.hn     CopperGate Communications   Q4/15   2011-02-02
[ 1442 ]  
 
G.hn: Differentiate between DLL multicast traffic and PHY multicast traffic in G.hn     CopperGate Communications   Q4/15   2011-02-02
[ 1438 ]  
 
G.gen: G.vdsl: G.ploam: Ambiguity of SES and UAS during re-initialization     Alcatel-Lucent Bell N.V.   Q4/15   2011-02-02
[ 1437 ]  
 
G.vdsl: Re-Initialization Policies: Proposed changes to working text for G.993.2     Alcatel-Lucent Bell N.V.   Q4/15   2011-02-02
[ 1434 ]  
 
A proposal to start a new Recommendation for "Narrow band, sub 1 GHz, wireless transceivers - PHY & MAC layer specifications"     CopperGate Communications   Q4/15   2011-02-02
[ 1433 ]  
 
G.hn: Proposed Annex for extension of G.hn for optical transmission media     CopperGate Communications   Q4/15   2011-02-02
[ 1432 ]  
 
G.hn: Backup Domain master related corrigendum items for G.9961     CopperGate Communications   Q4/15   2011-02-02
[ 1431 ]  
 
G.hn: Corrigendum items for G.9961     CopperGate Communications   Q4/15   2011-02-02
[ 1430 ]  
 
G.hn: Update of the text for the "symbol boosting" mechanism     CopperGate Communications   Q4/15   2011-02-02
[ 1429 ]  
 
G.hn: Orthogonal preambles for the Neighbour domain interference mitigation (NDIM) mechanism     CopperGate Communications   Q4/15   2011-02-02
[ 1428 ]  
 
G.hn: MIMO transmission scheme for PHY frames and signals other than 'frames where the payload is intended only for MIMO receivers', for G.hn-MIMO     CopperGate Communications   Q4/15   2011-02-02
[ 1427 ]  
 
G.hn: Update of the "modulation of unloaded subcarriers" text of G.hn-MIMO     CopperGate Communications   Q4/15   2011-02-02
[ 1426 ]  
 
G.hn: Channel estimation protocol for G.hn-MIMO     CopperGate Communications   Q4/15   2011-02-02
[ 1425 ]  
 
G.hn: Update of the text of 'Tx ports mapping' for G.hn-MIMO     CopperGate Communications   Q4/15   2011-02-02
[ 1423 ]  
 
Draft baseline text describing the Alternative Electrical Length Estimation Method (AELEM)     BT   Q4/15   2011-02-01
[ 1422 ]  
 
G.adsl: G.vdsl : Low Power Modes for Remote VDSL2 Nodes     BT   Q4/15   2011-02-01
[ 1421 ]  
 
G.VDSL: INM INPEQ Histogram     BT   Q4/15   2011-02-01
[ 1419 ]  
 
G.VDSL: INM IAT Histogram     BT   Q4/15   2011-02-01
[ 1417 ]  
 
G.LT: PSD Shaped SELT     BT   Q4/15   2011-02-01
[ 1411 ]  
 
Fixes in the recommendation to deal with multicast traffic     Marvell Semiconductor   Q4/15   2011-02-01
[ 1410 ]  
 
G.hn: Proposal for Channel Estimation bandwidth reservation     Marvell Semiconductor   Q4/15   2011-02-01
[ 1409 ]  
 
Bandwidth allocation protocol     Marvell Semiconductor   Q4/15   2011-02-01
[ 1408 ]  
 
Proposal for Corrigendum (Geneva meeting) - analyzing different fixes to the current approved versions of G.9960 and G.9961     Marvell Semiconductor   Q4/15   2011-02-01
[ 1407 ]  
 
G.vdsl: End to End Model and Precision requirements from ToD over VDSL2     Ministry of Communications (Israel (State of))   Q4/15   2011-02-01
[ 1403 ]  
 
G.gen: G.hn: G.vdsl: Reference Modelling for FTTdp Final Drops - For Information     BT   Q4/15   2011-02-01
[ 1402 ]  
 
G.gen: G.hn: G.vdsl: RF Ingress above 30 MHz - For Information     BT   Q4/15   2011-02-01
[ 1393 ]  
 
G.INP: VDSL2 will require retransmission upstream     BT   Q4/15   2011-02-01
[ 1390 ]  
 
G.vdsl: Operator control of transitions out of showtime (Reinit policies)     Swisscom   Q4/15   2011-02-01
Resultats:398 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-11-17