Contributions
[ AI/Question: Q13/15 ] |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 245 ]
|
PLL bandwidth requirement for G.8261.1 network limit test
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2013-06-17 |
|
[ 244 ]
|
Delay asymmetry test result using different traffic generation methods
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2013-06-17 |
|
[ 243 ]
|
Proposals for Transient and Holdover Specifications for G.8273.2
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2013-06-17 |
|
[ 241 ]
|
The time noise generation of T-BC in G.8273.2
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2013-06-17 |
|
[ 240 ]
|
Explanation of Time Selector Block in G.8273.2 Functional Model
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2013-06-17 |
|
[ 239 ]
|
Network limit and HRM hops of G.8271.1
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2013-06-17 |
|
[ 238 ]
|
HRM2 SyncE transients of G.8271.1
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2013-06-17 |
|
[ 237 ]
|
Clock Classes for G.8275.1 and T-BC/T-TSC Models
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2013-06-17 |
|
[ 212 ]
|
The Coordination and Transformation of Time and Frequency Information of G.8273.2 T-BC Network Element
|
China Unicom
|
Q13/15
|
2013-06-17 |
|
[ 211 ]
|
Relationship between networks PDV cumulative thresholds and 1pps performance in ITU-T Rec. G.8271.1
|
China Unicom
|
Q13/15
|
2013-06-17 |
|
[ 210 ]
|
Propose about messaging behaviour of boundary clock in Multicast/Unicast network
|
China Unicom
|
Q13/15
|
2013-06-17 |
|
[ 180 ]
(Rev.1-2) |
Proposal for Phase/time traceability information of PTP clock in holdover
|
Ministry of Industry and Information Technology (MIIT)
|
Q13/15
|
2013-06-17 |
|
[ 153 ]
|
Extension to G.8273 Annex B to address the combined 'PRTC + T-GM' case
|
Calnex Solutions Limited
,
Deutsche Telekom AG
|
Q13/15
|
2013-06-16 |
|
[ 152 ]
|
G.8260 & G.8273: Practical considerations in doing Constant Time Error measurements.
|
Calnex Solutions Limited
|
Q13/15
|
2013-06-16 |
|
[ 147 ]
|
T-GM: types, PRTC integration and performance
|
A1 Telekom Austria AG
,
China Mobile Communications Corporation
,
Deutsche Telekom AG
,
Orange
|
Q13/15
|
2013-06-16 |
|
[ 124 ]
|
G.8275.1: Title
|
SymmetriCom, Inc.
|
Q13/15
|
2013-06-15 |
|
[ 123 ]
|
G.8275.1: Default Parameter Values
|
SymmetriCom, Inc.
|
Q13/15
|
2013-06-15 |
|
[ 122 ]
|
G.8272: Revisions to Appendix 1 to include the case of a combined PRTC/T-GM
|
SymmetriCom, Inc.
|
Q13/15
|
2013-06-15 |
|
[ 121 ]
|
G.8263: Modification to Proposed Testing Appendix
|
SymmetriCom, Inc.
|
Q13/15
|
2013-06-15 |
|
[ 120 ]
|
G.8260: The Use of Exceptions for Network Limits using FPP
|
SymmetriCom, Inc.
|
Q13/15
|
2013-06-15 |
|
[ 119 ]
|
Percentile Average Clarification in G.8260
|
SymmetriCom, Inc.
|
Q13/15
|
2013-06-15 |
|
[ 118 ]
|
FPP and Percentile of Live Network PDV
|
SymmetriCom, Inc.
|
Q13/15
|
2013-06-15 |
|
[ 83 ]
|
How to handle unused PTP fields in BMCA/G.781 [G.8275.1]
|
Microsemi Semiconductor Corporation
|
Q13/15
|
2013-06-13 |
|
[ 82 ]
|
Noise Generation & Noise Transfer Text [G.8273.2]
|
Microsemi Semiconductor Corporation
|
Q13/15
|
2013-06-13 |
|
[ 81 ]
|
Adding Applicable Interfaces to PRTC [G.8272]
|
Microsemi Semiconductor Corporation
|
Q13/15
|
2013-06-13 |
|
[ 80 ]
|
Wander Generation Variable Temperature [G.8263]
|
Microsemi Semiconductor Corporation
|
Q13/15
|
2013-06-13 |
|
[ 79 ]
|
Clarification of Holdover Requirements for PEC-S [G.8263]
|
Microsemi Semiconductor Corporation
|
Q13/15
|
2013-06-13 |
|
[ 78 ]
|
Using G.781 for Time Profile [G.827x]
|
Microsemi Semiconductor Corporation
|
Q13/15
|
2013-06-13 |
|
[ 77 ]
|
Compliant & Non-Compliant Networks (Re-routes, Outage, Congestion) with FPP [G.8260, G.8261.1]
|
Microsemi Semiconductor Corporation
|
Q13/15
|
2013-06-13 |
|
[ 71 ]
|
G.8273.2 latest draft - editorial comments
|
Integrated Device Technology (IDT)
|
Q13/15
|
2013-06-13 |
|
[ 70 ]
|
G.8273 latest draft - editorial comments
|
Integrated Device Technology (IDT)
|
Q13/15
|
2013-06-13 |
|
[ 69 ]
|
G.8263 Holdover
|
Integrated Device Technology (IDT)
|
Q13/15
|
2013-06-13 |
|
[ 59 ]
|
G.8263 Wander Generation
|
Integrated Device Technology (IDT)
|
Q13/15
|
2013-06-13 |
|
[ 50 ]
|
Proposal for PTP clockclasses
|
China Mobile Communications Corporation
|
Q13/15
|
2013-06-13 |
|
[ 49 ]
|
Proposal for HRM hops and BC constant time error
|
China Mobile Communications Corporation
|
Q13/15
|
2013-06-13 |
|
[ 48 ]
(Rev.1) |
Proposal to reserve Priority 1 in BMCA
|
China Mobile Communications Corporation
|
Q13/15
|
2013-06-13 |
|
[ 24 ]
|
G.8275.1: Proposed Updates to the Alternate BMCA
|
Juniper Networks
|
Q13/15
|
2013-06-04 |
Resultats:87 documents Résultats :
Précédent -
1 -
2
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):