Contributions
[ AI/Question: Q4/15 ] |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 1812 ]
|
G.fast: G.9701 test parameters text improvements
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1810 ]
|
G.fast: Various text updates to G.9701 Amd1 Low power mode
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1809 ]
|
G.fast: Proposal to restrict upstream transmit power for 8dBm profile
|
Broadcom Corporation
|
Q4/15
|
2016-02-02 |
|
[ 1808 ]
|
G.fast: G.ploam: G.997.2 parameters to support G.fast XLOG test parameter
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1807 ]
|
G.vdsl: Mis-estimation of SNR during MEDLEY
|
Broadcom Corporation
,
Intel Corporation
,
Qualcomm, Inc.
|
Q4/15
|
2016-02-02 |
|
[ 1806 ]
|
Future work on G.fast recommendations
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1805 ]
|
G.fast, Editorial Correction to Figure Z-2.1
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1804 ]
|
G.fast: G.fast XLOG test parameter
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1802 ]
|
G.fast, G.ploam: VCE ID and VCE port index in G.9701 Amd2 and G.997.2 Amd2
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1801 ]
|
G.ploam, G.fast: Clarification on Unavailable State for corrigendum
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1800 ]
|
G.ploam: Test parameter update time stamps in G.997.2 Amd1
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1799 ]
|
G.fast, G.ploam: Corrigenda to G.9701 and G.997.2
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1798 ]
|
G.ploam, G.fast: Link state forced/enable/actual in G.9701 Amd1 and G.997.2 Amd1.
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1797 ]
|
G.ploam: Missing lom failure in G.997.1
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1792 ]
|
G.vector: Considerations about Multi-Vendor Vectoring standardization
|
Telecom Italia S.p.A.
|
Q4/15
|
2016-02-02 |
|
[ 1791 ]
|
G.fast: On data rate reporting
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1787 ]
|
Proposal for TIGAV transmission method
|
Intel Corporation
|
Q4/15
|
2016-02-02 |
|
[ 1783 ]
|
G.fast: Upstream Hlog reporting
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1782 ]
|
G.ploam, Capability reporting in G.997.1 and G.997.2
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1774 ]
|
On G.fast based solution for Coax application
|
British Telecommunications Public Ltd. Co. (BT Plc)
,
Futurewei Technologies US R&D Center
|
Q4/15
|
2016-02-02 |
|
[ 1744 ]
|
On the details of TIGAV procedure
|
Intel Corporation
|
Q4/15
|
2016-02-02 |
|
[ 1743 ]
|
Proposed eoc settings for Annex Q when used with G.993.5
|
Intel Corporation
|
Q4/15
|
2016-02-02 |
|
[ 1742 ]
|
On the timeout of L2.1-Entry procedure (G.9701 Amd 1)
|
Intel Corporation
|
Q4/15
|
2016-02-02 |
|
[ 1740 ]
|
Proposed corrigendum to G.9701
|
Intel Corporation
|
Q4/15
|
2016-02-02 |
|
[ 1702 ]
(Rev.1) |
G.fast Amendment 2: Maximum Bit Loading Revisited
|
Huawei Technologies Co., Ltd.
,
Metanoia Technologies
,
Swisscom SA
|
Q4/15
|
2016-02-01 |
|
[ 1701 ]
(Rev.1) |
G.fast: Exchange and determine the time out of initialization stages in handshake
|
Huawei Technologies Co., Ltd.
|
Q4/15
|
2016-02-01 |
|
[ 1672 ]
|
G.fast: Dynamic Bandwidth Allocation (DBA) for G.fast - control and management
|
ADTRAN
,
AT&T, Inc.
|
Q4/15
|
2016-02-01 |
|
[ 1668 ]
(Rev.1) |
G.fast: FTU-R software upgrade over eoc
|
ADTRAN
,
AT&T, Inc.
,
CenturyLink
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-02-01 |
|
[ 1662 ]
|
G.fast, G.hs: G.994.1 tone sets for coax
|
ADTRAN
,
AT&T, Inc.
,
Broadcom Corporation
,
Qualcomm, Inc.
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-02-01 |
|
[ 1661 ]
|
G.Fast: Requirements for operation on copper lines extended to include coaxial cables
|
ZTE Corporation
|
Q4/15
|
2016-02-01 |
|
[ 1660 ]
|
G.Fast: Requirements for Dynamic Bandwidth Allocation (DBA) in G.fast operation on coax
|
ZTE Corporation
|
Q4/15
|
2016-02-01 |
|
[ 1567 ]
|
G.fast: Framework for Dynamic US/DS Time Assignment Mechanism
|
Qualcomm, Inc.
|
Q4/15
|
2016-01-29 |
|
[ 1565 ]
|
G.fast - specification of Impulse noise monitoring
|
Swisscom SA
|
Q4/15
|
2016-01-29 |
|
[ 1563 ]
(Rev.1) |
G.fast: requirements for the DBA TDD DS/US ratio limits
|
AT&T, Inc.
,
ADTRAN
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-01-29 |
|
[ 1562 ]
|
G.fast coax cable configurations
|
ADTRAN
,
AT&T, Inc.
|
Q4/15
|
2016-01-29 |
|
[ 1561 ]
(Rev.1) |
G.fast 212 MHz amendment
|
AT&T, Inc.
,
Orange
,
TELUS Communications
|
Q4/15
|
2016-01-29 |
|
[ 1550 ]
|
G.fast: Signalling of DBA updates over the RMC
|
ADTRAN
,
AT&T, Inc.
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-01-28 |
|
[ 1549 ]
|
G.fast: DBA proposed way for changing the TDD DS/US ratio during showtime
|
ADTRAN
,
AT&T, Inc.
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-01-28 |
|
[ 1526 ]
|
G.fast - Need for improved reporting of EFTR
|
Swisscom SA
|
Q4/15
|
2016-01-27 |
|
[ 1524 ]
|
G.fast - Need for seamless reconfiguration of TARSNRM
|
Swisscom SA
|
Q4/15
|
2016-01-22 |
|
[ 1499 ]
|
Release of BT cable (20 pair) NEXT measurements for use in simulations
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2015-12-10 |
|
[ 1496 ]
|
G.dpm: Proposal for text modifications in G.dpm draft Recommendation
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2015-06-09 |
|
[ 1482 ]
|
G.fast: Proposed text updates for G.9701 Amd 1
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2015-06-09 |
|
[ 1481 ]
|
G.vdsl2: Proposed update for Annex Q profiles
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2015-06-09 |
|
[ 1478 ]
|
G.fast: Proposed change in retransmission function definition
|
Broadcom Corporation
|
Q4/15
|
2015-06-09 |
|
[ 1469 ]
|
G.vdsl: Proposed limits for CPE Common Mode Emission
|
Broadcom Corporation
|
Q4/15
|
2015-06-09 |
|
[ 1463 ]
+Add.1-2 |
G.vector: channel measurements for two Belgacom paper cable samples
|
Belgacom SA Account Payable Service
|
Q4/15
|
2015-06-09 |
|
[ 1461 ]
|
G.dpm: Proposed text for an amendment to G.9979
|
Marvell Semiconductor Inc.
|
Q4/15, Q18/15
|
2015-06-09 |
|
[ 1460 ]
|
G.fast: New format for RPA request
|
Broadcom Corporation
|
Q4/15
|
2015-06-09 |
|
[ 1459 ]
|
G.inp, G.vdsl: Reduce HRTref for VTU-R in 35b
|
Broadcom Corporation
|
Q4/15
|
2015-06-09 |
Resultats:256 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):