Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG 15 : Réunion 2019-07-01 : Documents Temporaires  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG 15  TD-WP1 (2019-07-01) 

UIT-T SG 15

Transport, access and home

Période d'études 2017

Réunion  du 2019-07-01 au 2019-07-12

Lieu : Suisse [Genève]

Autres réunions : 2021-12-06  2021-04-12  2020-09-07  2020-01-27  [ 2019-07-01 ]  2018-10-08  2018-01-29  2017-06-19 

Resultats:91 documents
Résultats :  Précédent -  1 - 2
Documents Temporaires  (WP1)   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 346-WP1 ]  
(Rev.1) 
Report of the Q2/15 meeting     Rapporteur Q2/15   Q2/15   2019-06-14
[ 345-WP1 ]  
(Rev.1) 
Agenda of the Q2/15 meeting     Rapporteur Q2/15   Q2/15   2019-06-14
[ 344-WP1 ]  
 
Report of the Q1/15 meeting     Rapporteur Q1/15   Q1/15   2019-06-14
[ 343-WP1 ]  
 
Agenda of the Q1/15 meeting     Rapporteur Q1/15   Q1/15   2019-06-14
[ 342-WP1 ]  
 
Draft Recommendation ITU-T G.9806     Editors G.9806   Q2/15   2019-06-14
[ 341-WP1 ]  
 
G.9806 (2019) Living list     Editors G.9806 (2019)   Q2/15   2019-06-14
[ 340-WP1 ]  
(Rev.1) 
G.hsp.req living list     Editors G.hsp.req   Q2/15   2019-06-14
[ 339-WP1 ]  
 
LS/i/r on HNT Standardization Work Plan (reply to SG15-LS141)     IEEE 802.3   Q1/15   2019-06-14
[ 338-WP1 ]  
 
LS/i/r on ANT Standardization Work Plan     IEEE 802.3   Q1/15   2019-06-14
[ 337-WP1 ]  
 
Higher Speed Gigabit-Capable Passive Optical Networks: Common Transmission Convergence Layer Specification     Editors G.hsp.ComTC   Q2/15   2019-06-14
[ 336-WP1 ]  
 
Issues list for G.vector     Editor G.993.5   Q4/15   2019-06-14
[ 335-WP1 ]  
(Rev.1) 
Issues list for G.vdsl     Rapporteur Q4/15   Q4/15   2019-06-14
[ 334-WP1 ]  
(Rev.1) 
Issues list for G.mgfast     Rapporteur Q4/15   Q4/15   2019-06-14
[ 333-WP1 ]  
 
Issues list for G.inp     Rapporteur Q4/15   Q4/15   2019-06-14
[ 332-WP1 ]  
 
LS/i/r on the new version of the Home Network Transport (HNT) Standards Overview and Work Plan (reply to SG15-LS141)     ITU-T Study Group 5   Q1/15   2019-06-13
[ 331-WP1 ]  
(Rev.1) 
G.9803 Amd.1 Living List     Editors G.9803   Q2/15   2019-06-13
[ 330-WP1 ]  
 
LS/o on Opening discussion on Cooperative Dynamic Bandwidth Assignment     Rapporteur Q2/15   Q2/15   2019-06-13
[ 329-WP1 ]  
 
Draft text for G.mgfast-PHY     Editor G.mgfast   Q4/15   2019-06-10
[ 328-WP1 ]  
 
LS/o/r to SG9 regarding the new draft recommendation J.cable-ott (reply to SG9-LS73)     Rapporteur Q18/15   Q18/15   2019-05-29
[ 327-WP1 ]  
 
LS/o to Broadband Forum and HomeGrid Forum concerning the work in ITU-T Q18/15 on the channel modelling and test methodology of power line communication in home network     Rapporteur Q18/15   Q18/15   2019-05-29
[ 326-WP1 ]  
 
LS/o/r to ITU-R 5D concerning document ITU-R SM.2351-2 and the work of ITU-T Q18/15 in smart grid networks (reply to ITU-R WP5D - Document 5D/TEMP/604(Rev.1) -E)     Rapporteur Q18/15   Q18/15   2019-05-29
[ 325-WP1 ]  
 
LS/o/r to ITU-R 5A concerning document ITU-R M.[IMT.USAGE] and the work of ITU-T Q18/15 in smart grid networks (reply to ITU-R WP5A - LS46 -E)     Rapporteur Q18/15   Q18/15   2019-05-29
[ 324-WP1 ]  
 
LS/i/r on coordination of bidirectional optical for access (reply to SG15-LS174)     IEEE 802.3 Working Group   Q2/15   2019-03-12
[ 323-WP1 ]  
 
LS/i/r on the preliminary draft revision of Report ITU-R SM.2351-2 on smart grid utility management systems     ITU-R Working party 5D   Q15/15   2019-03-12
[ 322-WP1 ]  
 
LS/i on status of work items related to DOCSIS     ETSI TC CABLE   Q18/15   2019-02-25
[ 321-WP1 ]  
 
LS/i/r on the preliminary draft revision of Report ITU-R SM.2351-2 on smart grid utility management systems     ITU-R WP5A   Q18/15, Q15/15   2019-02-21
[ 320-WP1 ]  
 
LS/i/r- Answers to ITU-T regarding CO-DBA (reply to SG15-LS173)     O-RAN Alliance WG4   Q2/15   2019-02-20
[ 319-WP1 ]  
 
LS/i/r on new version of the Home Network Transport (HNT) Standards Overview and Work Plan (reply to SG15-LS141)     ITU-T Study Group 17   Q1/15   2019-02-20
[ 318-WP1 ]  
 
LS/i on Opening discussion on standardization of bidirectional optics for access     Rapporteur Q2/15   Q2/15   2019-01-11
[ 317-WP1 ]  
 
LS/i/r to Q2/15 regarding next step in ID-247i4 about ExtVLAN list order issue (reply to SG15-LS171)     Broadband Forum   Q2/15   2019-01-03
[ 316-WP1 ]  
 
LS/i on start of new draft Recommendations ITU-T J.cable-ott "System architecture and interfaces between a cable television operator and an OTT service provider"     ITU-T Study Group 9   Q18/15   2019-01-03
[ 315-WP1 ]  
 
LS/i on Status of work items related to DOCSIS (reply to CABLE(18)000036r2)     ITU-T Study Group 9   Q18/15, Q1/15   2019-01-03
[ 314-WP1 ]  
 
LS/i/r on the new version of the Home Network Transport (HNT) Standards Overview and Work Plan (reply to SG15-LS141)     ITU-T Study Group 9   Q1/15   2019-01-03
[ 313-WP1 ]  
 
LS/o on Opening discussion on Cooperative Dynamic Bandwidth Assignment     Rapporteur Q2/15   Q2/15   2018-12-21
[ 312-WP1 ]  
 
LS/i - Liaison to ITU-T Q4/SG15 regarding test parameter subcarrier groupsize     Broadband Forum   Q4/15   2018-12-19
[ 311-WP1 ]  
 
LS/i - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart Grid Utility Management Systems     ITU-R Working Party 5A   Q4/15, Q2/15, Q18/15, Q15/15, Q1/15   2018-11-30
[ 310-WP1 ]  
 
LS/i - WT-352 Issue 2 Multi-wavelength PON Inter-Channel-Termination Protocol (ICTP) Specification     Broadband Forum   Q2/15   2018-11-30
[ 309-WP1 ]  
 
LS/i/r - Reply from MoCA to ITU-T SG15 on HNT overview and worm plan (reply to SG15-LS141)     MoCA   Q1/15   2018-11-30
[ 308-WP1 ]  
 
LS/i - Preliminary draft revision of Report ITU-R SM.2351-2 on smart grid utility management systems     ITU-R Working Party 5D   Q18/15, Q15/15   2018-11-30
[ 307-WP1 ]  
 
LS/o - Current status of Extended VLAN OMCI     Rapporteur Q2/15   Q2/15   2018-11-29
[ 306-WP1 ]  
 
LS/i/r - CPRI TWG response to Liaison Statement "SG15-LS128 to CPRI on Cooperative Dynamic Bandwidth Assignment"     CPRI   Q2/15   2018-11-13
Resultats:91 documents
Résultats :  Précédent -  1 - 2  
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-8-29