Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 835 ]
|
Comments on draft Rec. Y.FAid-loc-split
|
France Telecom
|
Q5/13
|
2011-01-07 |
|
[ 834 ]
|
Draft Y.ipv6na - update
|
Huawei
|
Q7/13
|
2011-01-07 |
|
[ 833 ]
|
Proposal of new interfaces for SCF for Y.dsnarch for Jan.2011 meeting
|
ETRI
|
Q19/13
|
2011-01-07 |
|
[ 832 ]
|
Proposals to resolve editor's notes in the Y.dsnarch for Jan.2011 meeting
|
ETRI
|
Q19/13
|
2011-01-07 |
|
[ 831 ]
|
Proposed modification of Figure 7-2 and additional texts for CDF/FEs
|
ETRI
|
Q19/13
|
2011-01-07 |
|
[ 830 ]
|
Proposed modification on the behaviour of NEF and flows for Appendix.I.2.4
|
ETRI
|
Q19/13
|
2011-01-07 |
|
[ 829 ]
|
Proposed changes to clause 6 to cover DSN characteristics in Y.dsnarch
|
ETRI
|
Q19/13
|
2011-01-07 |
|
[ 828 ]
|
Proposal for modification of Appendix I in Y.dsnarch
|
ETRI
|
Q19/13
|
2011-01-07 |
|
[ 827 ]
|
Updating contents of Y.iras document-TD134
|
Korea (Rep. of)
|
Q14/13
|
2011-01-07 |
|
[ 826 ]
|
Proposal for redefining term Condition and related information elements in Y.dpireq
|
Korea (Rep. of)
|
Q17/13
|
2011-01-07 |
|
[ 825 ]
|
Draft Amendment to Recommendation Y.2122, "Information Model and Message Format for Flow Aggregate Information Exchange Functions (FIXF) in NGN"
|
Korea (Rep. of)
|
Q4/13
|
2011-01-07 |
|
[ 824 ]
|
Proposed modification of Y.iptv-netcontrol-fw
|
Korea (Rep. of)
|
Q3/13
|
2011-01-07 |
|
[ 823 ]
|
Proposed modification of Y.ipev
|
Korea (Rep. of)
|
Q12/13
|
2011-01-07 |
|
[ 822 ]
|
Revised draft of Y.ipv6-vmh in 2011 January meeting
|
Korea (Rep. of)
|
Q7/13
|
2011-01-07 |
|
[ 821 ]
|
Service scenario and use case for the profile based application adaptation service
|
Korea (Rep. of)
|
Q14/13
|
2011-01-07 |
|
[ 820 ]
|
Modification of Roaming Procedures in Section 9
|
Korea (Rep. of)
|
Q22/13
|
2011-01-07 |
|
[ 819 ]
|
Modification of Handover Scenarios in Section 11
|
Korea (Rep. of)
|
Q22/13
|
2011-01-07 |
|
[ 818 ]
|
Modification of Handover Procedures in Section 9
|
Korea (Rep. of)
|
Q22/13
|
2011-01-07 |
|
[ 817 ]
|
Proposal for the revised text for Section 7.2.1 in draft Y.ipv6split
|
Korea (Rep. of)
|
Q7/13
|
2011-01-07 |
|
[ 816 ]
|
Proposal for the editorial changes in draft Y.ipv6split
|
Korea (Rep. of)
|
Q7/13
|
2011-01-07 |
|
[ 815 ]
|
Proposed modifications in the service model of Y.gms
|
Korea (Rep. of)
|
Q14/13
|
2011-01-07 |
|
[ 814 ]
|
Proposed modifications in the service scenarios of Y.gms
|
Korea (Rep. of)
|
Q14/13
|
2011-01-07 |
|
[ 813 ]
|
Propose immediate approval of FG-FN Deliverable, "Future Networks: Objectives and Design Goals" as an ITU-T Recommendation
|
Korea (Rep. of)
|
Q21/13
|
2011-01-07 |
|
[ 812 ]
|
Proposal for information flow between MMCF and Multicast Functions in Y.MMC
|
ETRI
|
Q22/13
|
2011-01-06 |
|
[ 811 ]
|
Proposal for interoperability between MMCF and Multicast Functions in Y.MMC
|
ETRI
|
Q22/13
|
2011-01-06 |
|
[ 810 ]
|
Proposal for adding dynamic network information of T2 in Y.dsntocf
|
China Telecom
|
Q19/13
|
2011-01-06 |
|
[ 809 ]
|
Proposal for adding procedure C5 in Y.DSNarch
|
China Telecom
|
Q19/13
|
2011-01-06 |
|
[ 808 ]
|
Proposal of adding an overview of the NGN SIDE Functional architecture in section 7 of Y.NGN-SIDE Arch
|
China Telecom
,
ZTE Corporation
|
Q5/13, Q3/13
|
2011-01-06 |
|
[ 807 ]
|
Proposal of adding general characteristics in section 6.1 of Y.NGN-SIDE Arch
|
China Telecom
,
ZTE Corporation
|
Q5/13, Q3/13
|
2011-01-06 |
|
[ 806 ]
|
Proposal for redefining and renaming OPE-FE and OPS-FE in Y.dsntocf
|
China Telecom
|
Q19/13
|
2011-01-06 |
|
[ 805 ]
|
Proposal for some minor changes in Y.dsntocf
|
China Telecom
|
Q19/13
|
2011-01-06 |
|
[ 804 ]
|
Proposal for adding external interface description in TOCF
|
China Telecom
|
Q19/13
|
2011-01-06 |
|
[ 803 ]
|
MOC group requirements
|
China Telecom
|
Q3/13
|
2011-01-06 |
|
[ 802 ]
|
Proposed location-based service requirement in Y.MOC-reqts
|
China Telecom
|
Q3/13
|
2011-01-06 |
|
[ 801 ]
|
Proposed service feature of Y.MOC-reqts
|
China Telecom
|
Q3/13
|
2011-01-06 |
|
[ 800 ]
|
Proposed modification of Service requirement of MOC of Y.MOC-reqts
|
China Telecom
|
Q3/13
|
2011-01-06 |
|
[ 799 ]
|
Proposed modification of clause 6 of Y.MOC-reqts
|
China Telecom
|
Q3/13
|
2011-01-06 |
|
[ 798 ]
|
Proposal for enriching the description of shortest path routing model in Y.PTDN_routing
|
CATR
,
MIIT, China
|
Q20/13
|
2011-01-06 |
|
[ 797 ]
|
Proposal for enriching the description of alternative routing model in Y.PTDN_routing
|
CATR
,
MIIT, China
|
Q20/13
|
2011-01-06 |
|
[ 796 ]
|
Clarifying the QoS guarantee of dual routing model in Y.PTDN_reliability
|
CATR
,
MIIT, China
|
Q20/13
|
2011-01-06 |
|
[ 795 ]
|
Proposal for baseline text of draft recommendation for Y.PTDN_T_interface
|
CATR
,
MIIT, China
|
Q20/13
|
2011-01-06 |
|
[ 794 ]
|
Proposal for baseline text of draft recommendation for Y.PTDN_M_interface
|
CATR
,
MIIT, China
|
Q20/13
|
2011-01-06 |
|
[ 793 ]
|
Update the description of trail protection in Y.PTDN_reliability
|
CATR
,
MIIT, China
|
Q20/13
|
2011-01-06 |
|
[ 792 ]
|
Update description of the shortest path routing model in Y.PTDN_reliability
|
CATR
,
MIIT, China
|
Q20/13
|
2011-01-06 |
|
[ 791 ]
|
Proposal to initiate a work item to study Streaming Service capability over Multi-connection
|
MIIT, China
|
Q9/13
|
2011-01-06 |
|
[ 790 ]
|
Proposal for adding description of Multi-connection service control functional entity in Y.MC-ARCH
|
MIIT, China
|
Q9/13
|
2011-01-06 |
|
[ 789 ]
|
Proposal for Adding Description of Multi-connection Application Support Functional Entity in Y.MC-ARCH
|
MIIT, China
|
Q9/13
|
2011-01-06 |
|
[ 788 ]
|
Proposal for UE Initiated Multi-connection Service Decomposition After Call Established
|
MIIT, China
|
Q9/13
|
2011-01-06 |
|
[ 787 ]
|
Proposal for Network Initiated Multi-connection Service Decomposition After Call Established
|
MIIT, China
|
Q9/13
|
2011-01-06 |
|
[ 786 ]
|
Proposal for Modification of Multi-connection Service Decomposition
|
MIIT, China
|
Q9/13
|
2011-01-06 |
Resultats:1485 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):