Contributions
Numéro
Titre
Source
AI/Question
Filtre...
AI1.1
AI1.10
AI1.12
AI1.13
AI1.14
AI1.15
AI1.16
AI1.17
AI1.18
AI1.19
AI1.2
AI1.3
AI1.4
AI1.5
AI1.7
AI1.8
AI1.9
AI11.7
AI15
AI9.1
AI9.1 A)
AI9.1 B)
AI9.1 C)
AI9.1A)
AI9.1B)
AI9.1C)
AI9.1D
AI9.1D)
Q1/5
Q101/5
Q205/5
Q228/3
Q236/1
Q238/5
Q242/5
Q256/5
Q257/5
Q261/5
Q263/5
Q37/5
Q37-6/5
Q48/5
Q7/5
Effacer filtre
Date
[ 47 ]
Proposed liaison statement to Working Party 5D on the studies related to RR No. 21,5 regarding AAS
France
2020-07-10
[ 46 ]
Proposed draft liaison response to ITU-T Study Group 11 (copy to ITU-D SG2 Q5/2, ITU-R Working Parties 1B, 5B and 5D, and the RAG) - Disaster Relief Use Cases
Chairmen, WP 5A and WG 5A-3
2020-07-09
[ 45 ]
Working Party 5A Management
Chairman, WP 5A
2020-07-09
[ 44 ]
Proposed modification to Recommendation ITU-R M.1450-5
Institute of Electrical and Electronics Engineers, Inc.
2020-07-09
[ 43 ]
Proposed modification to Recommendation ITU-R M.1801-2
Institute of Electrical and Electronics Engineers, Inc.
2020-07-09
[ 42 ]
Progression of the working document towards a preliminary draft new Report on utility communication systems
Canada
Q37/5
2020-06-25
[ 41 ]
Development of the working document towards a preliminary draft revision of Report ITU-R M.2417-0 - Technical and operational characteristics of land-mobile service applications
in the frequency range 275-450 GHz
Canada
Q256/5
2020-06-25
[ 40 ]
Proposed working document towards a preliminary draft new Report ITU-R M.[CAV] - Connected Automated Vehicles (CAV)
Canada
Q261/5
2020-06-25
[ 39 ]
Outcome of the sixteenth meeting of the Chairmen and Vice-Chairmen of the Radiocommunication Study Groups, Working Parties and other Subordinate Groups
Director, BR
2020-06-25
[ 38 ]
Contribution to Working Parties 5A, 5B, 5C and 5D on relevant agenda item of WRC-23
Iran (Islamic Republic of)
2020-06-15
[ 37 ]
Way forward on radiocommunication systems train to trackside (RSTT) in the 2020-2023 Study Period
United States of America
2020-06-12
[ 36 ]
Proposed update to working document towards a preliminary draft new Report ITU-R M.[100-GHZ.RSTT.COEXIST] - Coexistence between high-speed railway radiocommunication system between train and trackside operating in the frequency bands 92-94 GHz, 94.1-100 GHz and 102-109.5 GHz, and radio astronomy and Earth exploration-satellite (active and passive)
United States of America
2020-06-12
[ 35 ]
Update on mobile services in the United States within 27.5-28.35 GHz
United States of America
2020-06-12
[ 34 ]
Proposed revisions to working document towards revision of Land Mobile Handbook Vol. 4 - Intelligent Transport Systems
United States of America
2020-06-12
[ 33 ]
Possible harmonization of frequency bands for connected automated vehicle (CAV) communication
United States of America
Q261/5
2020-06-12
[ 32 ]
Liaison statement to Working Parties 4C, 5A, 5B, 5C, 7B and 7C (copy for information to Working Party 3M) - WRC-23 agenda item 1.16
WP 4A
AI1.16
2020-06-10
[ 31 ]
Liaison statement to Working Parties 4B, 4C, 5A, 5B, 5C, 7B and 7C (copy for information to Working Party 3M) - WRC-23 agenda item 1.17
WP 4A
AI1.17
2020-06-10
[ 30 ]
Liaison statement to Working Parties 5A, 5B, 5C, 7B (copy for information to Working Party 3M) - WRC-23 agenda item 1.19
WP 4A
AI1.19
2020-06-10
[ 29 ]
Liaison statement to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 7B, 7C and 3M - WRC-23 agenda item 1.18
WP 4C
AI1.18
2020-06-08
[ 28 ]
Liaison statement to Working Party 5C (copy for information to Working Parties 3M, 5A, 5B) - WRC-23 agenda item 1.15
WP 4A
AI1.15
2020-06-08
[ 27 ]
Liaison statement to Working Parties 5A and 5B (copy for information to Working Parties 3M and 5C) - WRC-23 agenda item 1.15
WP 4A
AI1.15
2020-06-08
[ 26 ]
Liaison statement to Working Parties 5A and 3M - Information for studies on WRC-23 agenda item 9.1, topic b)
WP 4C
AI9.1
2020-06-08
[ 25 ]
Reply liaison statement on the new version of the Access Network Transport (ANT) standard overview and work plan
ITU-T SG 9
2020-05-27
[ 24 ]
Preliminary position on WRC-23 agenda
World Meteorological Organization
2020-05-13
[ 23 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C (copy to Working Parties 3J and 3M for information) - Request system characteristics of primary services to be used for sharing and compatibility studies in the frequency range 231.5-252 GHz and adjacent bands
WP 7C
AI1.14
2020-04-30
[ 22 ]
(Rev.1)
Liaison statement to Working Parties 5A, 5B, 5C and 6A - Preparations for studies under WRC-23 agenda item 1.12
WP 7C
AI1.12
2020-04-30
[ 21 ]
Liaison statement to Working Parties 3M, 5A, 5C, 7C and 7D requesting characteristics for use in sharing studies under WRC-23 agenda item 1.13 (Working Party 5B for information and action if appropriate)
WP 7B
AI1.13
2020-04-28
[ 20 ]
Liaison statement on disaster relief use cases
ITU-T SG 11
2020-03-25
[ 19 ]
Organization of the work on WRC-23 agenda item 9.1, topic c) (copy for information to Working Party 5D) - Study the use of International Mobile Telecommunication systems for fixed wireless broadband in the frequency bands allocated to the fixed service on a primary basis, in accordance with Resolution 175 (WRC-19)
Chairmen, WP 5A and 5C
AI9.1
2020-03-17
[ 18 ]
Liaison statement to ITU-R Working Party 5A - Development of a draft new Report ITU-R M.[IMT.C-V2X] - Application of the Terrestrial Component of IMT for Cellular-V2X
WP 5D
2020-03-09
[ 17 ]
Liaison statement from ITU-D Study Group 2 Question 5/2 to ITU-R Working Parties 5A and 5D on emergency services supported through IMT
ITU-D SG 2
2020-03-06
[ 16 ]
Liaison statement to Working Parties 3K and 3M (for information to Working Parties 1B, 3J, 4A, 4B, 4C, 5A, 5B, 5C, 7B, 7C and 7D - Preparations for WRC-23 agenda items 1.1 and 1.2
WP 5D
AI1.2 , AI1.1
2020-03-06
[ 15 ]
Liaison statement to ITU-R Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 7B and 7C - Preparations for WRC-23 agenda item 1.2
WP 5D
AI1.2
2020-03-06
[ 14 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C, and 7D - Information for studies on WRC-23 agenda item 1.4
WP 5D
AI1.4
2020-03-06
[ 13 ]
Liaison statement to Working Party 4C (copy to Working Parties 5A and 5C for information) - Sharing and coexistence studies between the mobile-satellite service and terrestrial IMT systems in the 2 655-2 690 MHz frequency band in certain countries of Region 3
WP 5D
2020-03-06
[ 12 ]
Results from the Fifteenth meeting of Study Group 5 (2-3 September 2019) of interest to Working Party 5A
Chairman, WP 5A
2020-03-03
[ 11 ]
Liaison statement from ITU-D Study Group 1 Q5/1 to ITU-R Study Group 5 Working Parties 5A and 5D on Questions ITU-R 77-8/5 and ITU-R 238-3/5
ITU-D SG 1
2020-03-03
[ 10 ]
Liaison on the new version of the Home Network Transport (HNT) standards overview and work plan
ITU-T SG 15
2020-02-19
[ 9 ]
Liaison on the new version of the Access Network Transport (ANT) standards overview and work plan
ITU-T SG 15
2020-02-19
[ 8 ]
Liaison statement to Task Group 6/1 (copy to Working Parties 3K, 3M, 5A, 5B, 5C and 5D) - WRC-23 agenda item 1.5
WP 6A
2020-02-12
[ 7 ]
Liaison statement to Working Party 5A (copy to Working Party 5C and Task Group 6/1 for information) - Issues related to Services ancillary to broadcasting/Services ancillary to programme-making relative to WRC-23 agenda item 1.5
WP 6A
AI1.5
2020-02-12
[ 6 ]
Liaison statement to Working Parties 5A and 5C and for information to Working Parties 4C, 5B and 5D - Resolution ITU-R 59-2 and related work within Working Party 6A
WP 6A
2020-02-12
[ 5 ]
Liaison statement on technical reports on use cases and requirements as well as architecture for vehicular multimedia
ITU-T FG-VM
2020-01-20
[ 4 ]
Working Party 5A preparatory work for WRC-23 (copy for information to Working Parties 5B, 5C and 5D)
Chairman, Working Party 5A
2020-01-09
[ 3 ]
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T SG5 WP1/5, ITU-R Working Parties 1A, 1C, 4A, 5A, 5C, 5D and 6A on strategies and policies concerning human exposure to EMF
ITU-D SG 2
2019-11-29
[ 2 ]
Liaison statement from ITU-D Study Group 2 Question 5/2 to ITU-R Working Party 5A on collaboration
ITU-D SG 2
2019-11-18
[ 1 ]
Documents to be carried over from the 2015-2019 study period
WP 5A
2019-10-31
Resultats:847 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):