Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 1590 ]
(Rev.1) |
New Appendix B for G.8021.1
|
Ciena Corporation
|
Q9/15
|
2011-11-18 |
|
[ 1589 ]
(Rev.1) |
Noise Generation in G.8263
|
Telefon AB - LM Ericsson
|
Q13/15
|
2011-11-18 |
|
[ 1588 ]
(Rev.1) |
Input for G.8021.1 Clauses 8.1 and 8.2
|
Ciena Corporation
|
Q9/15
|
2011-11-18 |
|
[ 1587 ]
(Rev.1) |
Proposal for text concerning packet selection in G.8260
|
Telefon AB - LM Ericsson
|
Q13/15
|
2011-11-18 |
|
[ 1586 ]
(Rev.1) |
Discussion on reference points and network limits in G.8271
|
Telefon AB - LM Ericsson
|
Q13/15
|
2011-11-18 |
|
[ 1585 ]
(Rev.1) |
Input for G.8021.1 Clause 8
|
Ciena Corporation
|
Q9/15
|
2011-11-18 |
|
[ 1584 ]
|
Withdrawn: Duplicate of C-1585
Withdrawn
|
Ciena Corporation
|
|
2011-11-18 |
|
[ 1583 ]
(Rev.1) |
Proposal for network limits in G.8271
|
Telefon AB - LM Ericsson
|
Q13/15
|
2011-11-18 |
|
[ 1582 ]
(Rev.1) |
Input for G.8021.1 Appendix A
|
Ciena Corporation
|
Q9/15
|
2011-11-18 |
|
[ 1581 ]
(Rev.1) |
Proposal for Distributed G.8031 Amendment
|
Fujitsu Network Communications, Inc.
|
Q9/15
|
2011-11-18 |
|
[ 1580 ]
(Rev.1) |
Proposal for Distributed G.873.1 Amendment
|
Fujitsu Network Communications, Inc.
|
Q9/15
|
2011-11-18 |
|
[ 1579 ]
(Rev.1) |
Comments on the recent G.798 change for the dTLC contribution to aAIS and aTSF
|
PMC-Sierra, Inc.
|
Q9/15
|
2011-11-18 |
|
[ 1578 ]
(Rev.1) |
Network Defect Handling for Hitless Adjustment to ODUflex(GFP) (HAO) During Bandwidth Resizing (BWR)
|
PMC-Sierra, Inc.
|
Q11/15
|
2011-11-18 |
|
[ 1577 ]
(Rev.1) |
Hitless Adjustment to ODUflex(GFP) (HAO) Performance Parameters During Bandwidth Resizing (BWR) - Measurement Time References
|
PMC-Sierra, Inc.
|
Q11/15
|
2011-11-18 |
|
[ 1576 ]
(Rev.1) |
ODUflex related extensions to information model in G.874.1
|
Infinera Corporation
|
Q14/15
|
2011-11-18 |
|
[ 1575 ]
(Rev.1) |
Mapping between G.798 atomic functions and G.874.1 managed objects
|
Infinera Corporation
|
Q14/15
|
2011-11-18 |
|
[ 1574 ]
(Rev.1) |
Hitless Adjustment to ODUflex(GFP) (HAO) Performance Parameters During Bandwidth Resizing (BWR) - Latency-based Approach
|
PMC-Sierra, Inc.
|
Q11/15
|
2011-11-18 |
|
[ 1573 ]
(Rev.1) |
Flexible Rate OTU signal
|
Finisar Corporation
,
Infinera Corporation
,
Verizon Communication Corporation
|
Q6/15, Q12/15, Q11/15
|
2011-11-18 |
|
[ 1572 ]
(Rev.1) |
G.inp: Crosstalk management in PET mode
|
Metanoia Technologies, Inc.
|
Q4/15
|
2011-11-18 |
|
[ 1571 ]
(Rev.1) |
G.8263 : PEC-S-F state under limits of noise tolerance
|
Cisco Systems, Inc.
|
Q13/15
|
2011-11-18 |
|
[ 1570 ]
(Rev.1) |
Utilization of IP mapping for hop-by-hop BC model
|
Cisco Systems, Inc.
|
Q13/15
|
2011-11-18 |
|
[ 1569 ]
(Rev.1) |
Two-step clock issue with multicast transmission
|
Cisco Systems, Inc.
|
Q13/15
|
2011-11-18 |
|
[ 1568 ]
|
Proposal and Comments on MPLS-TP
|
Cisco Systems, Inc.
,
Ericsson, Inc.
,
Juniper Networks
,
Nokia Siemens Networks GmbH & Co. KG
,
Verizon Communication Corporation
|
Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15
|
2011-11-18 |
|
[ 1567 ]
|
Principle of Cooperation and Lines of Responsibility
|
AT&T, Inc.
,
Cisco Systems, Inc.
,
Ericsson, Inc.
,
Juniper Networks
,
Nokia Siemens Networks GmbH & Co. KG
,
Verizon Communication Corporation
|
QALL/15
|
2011-11-18 |
|
[ 1566 ]
|
Proposed text for G.8121.2 for Performance Monitoring processes
|
Cisco Systems, Inc.
,
Ericsson, Inc.
,
Nokia Siemens Networks GmbH & Co. KG
|
Q9/15
|
2011-11-18 |
|
[ 1565 ]
|
Proposed text for G.8121.2 for Lock Instruct and Loopback processes
|
Cisco Systems, Inc.
,
Ericsson, Inc.
,
Nokia Siemens Networks GmbH & Co. KG
|
Q9/15
|
2011-11-18 |
|
[ 1564 ]
(Rev.1) |
Holdover specification in G.8263
|
Telefon AB - LM Ericsson
|
Q13/15
|
2011-11-18 |
|
[ 1563 ]
(Rev.1) |
Discussion on Architecture and BMC algorithm for the Time Sync Telecom Profile (G.8275 and G.8275.1)
|
Telefon AB - LM Ericsson
|
Q13/15
|
2011-11-18 |
|
[ 1562 ]
(Rev.1-2) |
Proposed OAM management added to the new draft recommendation G.8152
|
ZTE Corporation
|
Q14/15
|
2011-11-18 |
|
[ 1561 ]
(Rev.1) |
PTP Mapping in the first Time Sync Telecom Profile (G. 8275.1)
|
Telefon AB - LM Ericsson
|
Q13/15
|
2011-11-18 |
|
[ 1560 ]
(Rev.1) |
Proposal of study point for optical submarine cable system in the next Study Period
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q8/15
|
2011-11-18 |
|
[ 1559 ]
(Rev.1) |
Proposed text about alarm management added to the new draft recommendation G.8152
|
ZTE Corporation
|
Q14/15
|
2011-11-18 |
|
[ 1558 ]
(Rev.1) |
Proposed text about performance management added to the new draft recommendation G.8152
|
ZTE Corporation
|
Q14/15
|
2011-11-18 |
|
[ 1557 ]
(Rev.1) |
Proposed text about the pseudo-wire(PW) added to the new draft recommendation G8152
|
ZTE Corporation
|
Q14/15
|
2011-11-18 |
|
[ 1556 ]
(Rev.1) |
Information and proposal on MPI measurement
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q5/15
|
2011-11-18 |
|
[ 1555 ]
(Rev.1) |
Proposal about use cases for MPLS-TP OAM management in G.8152
|
FiberHome Technologies Group
|
Q14/15
|
2011-11-18 |
|
[ 1554 ]
(Rev.1) |
Proposals about OTN failure and probable cause mapping for G.7710
|
FiberHome Technologies Group
|
Q14/15
|
2011-11-18 |
|
[ 1553 ]
(Rev.1) |
Comments on the DCN Management for G.7710
|
FiberHome Technologies Group
|
Q14/15
|
2011-11-18 |
|
[ 1552 ]
(Rev.1) |
Proposal of upgraded multiple wavelength PON network architecture
|
FiberHome Technologies Group
|
Q2/15
|
2011-11-18 |
|
[ 1551 ]
(Rev.1) |
Consideration on XG-PON coexistence ODN architecture for G.987.1
|
FiberHome Technologies Group
|
Q2/15
|
2011-11-18 |
|
[ 1550 ]
(Rev.1) |
Proposal to add RS232/RS485 interface service ME in G.988
|
FiberHome Technologies Group
|
Q2/15
|
2011-11-18 |
|
[ 1549 ]
(Rev.1) |
The support of XGPON for serial devices in the smart grid
|
FiberHome Technologies Group
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q2/15
|
2011-11-18 |
|
[ 1548 ]
|
Withdrawn, duplicate of C-1549
Withdrawn
|
FiberHome Technologies Group
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q2/15
|
2011-11-18 |
|
[ 1547 ]
(Rev.1) |
Proposal on Questions of Q5/15 for next study period
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q5/15
|
2011-11-18 |
|
[ 1546 ]
(Rev.1) |
Comments and proposal on revision of G.657
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q5/15
|
2011-11-18 |
|
[ 1545 ]
(Rev.1) |
Proposal for change of test signal in O.173
|
Communications and Information network Association of Japan (CIA
|
Q15/15
|
2011-11-18 |
|
[ 1544 ]
(Rev.1) |
Proposal for editorial modifications of Revised Draft O.173
|
Communications and Information network Association of Japan (CIA
|
Q15/15
|
2011-11-18 |
|
[ 1543 ]
(Rev.1) |
Proposal for editorial modifications of Draft O.xgponjitter
|
Communications and Information network Association of Japan (CIA
|
Q15/15
|
2011-11-18 |
|
[ 1542 ]
(Rev.1) |
G.8080 - SP10 - Call Routing Discussion
|
Ciena Canada
|
Q14/15, Q12/15
|
2011-11-17 |
|
[ 1541 ]
(Rev.1) |
G.7044 impact on G.7713
|
Ciena Canada
|
Q14/15, Q11/15
|
2011-11-17 |
Resultats:2390 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):