Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 154 ]
|
Test results of second order prediction (SOP)
|
Huawei Technologies
|
Q6/16
|
2009-01-19 |
|
[ 153 ]
|
Processing plan for GSAD
|
Huawei Technologies
|
Q8/16
|
2009-01-19 |
|
[ 152 ]
|
Test and Performance evaluation plan for GSAD
|
Huawei Technologies
|
Q8/16
|
2009-01-19 |
|
[ 151 ]
|
Proposal for the finalization of row 3 of the GSAD ToR
|
Huawei Technologies
|
Q8/16
|
2009-01-19 |
|
[ 150 ]
+Add.1-2 |
Objective evaluation and submission of G.718 floating point Annex
Note from TSB: The content of this contribution is the same as COM16-C.48
|
LM Ericsson
,
France Telecom
,
Huawei
,
Motorola
,
Panasonic
,
Texas Instruments
|
Q9/16
|
2009-01-19 |
|
[ 149 ]
|
Maintenance of G.718
Note from TSB: The content of this contribution is the same as COM16-C.49
|
Panasonic
,
France Telecom
,
Huawei
,
LM Ericsson
,
Motorola
|
Q9/16
|
2009-01-19 |
|
[ 148 ]
|
Option of SWB/Stereo extension to G.718 core to be applied at Layer 4
Note from TSB: The content of this contribution is the same as COM16-C.45
|
LM Ericsson
,
Motorola
,
Panasonic
|
Q9/16, Q10/16
|
2009-01-19 |
|
[ 147 ]
|
Proposal of modification policy in draft Rec. H.IRP
|
SCAT
|
Q22/16, Q21/16
|
2009-01-19 |
|
[ 146 ]
|
Proposal of modification policy in draft Rec. H.IDscheme
|
SCAT
|
Q22/16, Q21/16
|
2009-01-19 |
|
[ 145 ]
+Add.1 |
Toward a H.265 low complexity profile
|
Tandberg
,
Nokia
|
Q6/16
|
2009-01-19 |
|
[ 144 ]
|
Proposal of a skeleton for a draft new Rec. F.SA&TCFC Service "Awareness and Traffic Control Functional Component"
|
MIIT, P.R. China
|
Q24/16, Q22/16
|
2009-01-19 |
|
[ 143 ]
|
Proposal to create a WI for a new F-series Recommendation on "Service Awareness and Traffic Control Functional Component"
|
MIIT, P.R. China
|
Q24/16, Q22/16
|
2009-01-19 |
|
[ 142 ]
|
Discussion on some user cases of the equivalent cooperation model between the services network and bearer network
|
MIIT, P.R. China
|
Q24/16
|
2009-01-19 |
|
[ 141 ]
|
Discussion on some public components in the equivalent cooperation model between the bearer network and the service network
|
MIIT, P.R. China
|
Q24/16
|
2009-01-19 |
|
[ 140 ]
|
Discussion on multimedia functions based on the equivalent cooperation of the bearer network and service network
|
MIIT, P.R. China
|
Q24/16
|
2009-01-19 |
|
[ 139 ]
|
Comments on "Toolbox for content coding"
|
MIIT, P.R. China
|
Q6/16
|
2009-01-19 |
|
[ 138 ]
|
Proposal on draft Recommendation H.IPTV-TDES.3
|
China Telecom
|
Q13/16
|
2009-01-19 |
|
[ 137 ]
|
Proposed on draft Recommendation H.IPTV-WBTM
|
China Telecom
|
Q13/16
|
2009-01-19 |
|
[ 136 ]
|
Proposal on ECMAScript requirement
|
China Telecom
|
Q13/16
|
2009-01-19 |
|
[ 135 ]
|
Proposal of end-system source retransmission for Content Delivery Error Recovery Architecture
|
China Telecom
|
Q13/16
|
2009-01-19 |
|
[ 134 ]
|
Delivery mechanism of Audience Measurement
|
ZTE Corporation
|
Q13/16
|
2009-01-19 |
|
[ 133 ]
|
Proposed new definitions for F.VSreqs
|
ZTE Corporation
|
Q22/16, Q21/16
|
2009-01-19 |
|
[ 132 ]
+Add.1 |
Proposed to reactive the study of IPTV Service Navigation System standard
|
ZTE Corporation
|
Q13/16
|
2009-01-19 |
|
[ 131 ]
|
Clarification of web-based service discovery
|
ZTE Corporation
|
Q13/16
|
2009-01-19 |
|
[ 130 ]
+Add.1 |
Performance of KTA
|
LM Ericsson
|
Q6/16
|
2009-01-19 |
|
[ 129 ]
+Add.1 |
Intra frame coding of adaptive loop filter coefficients
|
LM Ericsson
|
Q6/16
|
2009-01-19 |
|
[ 128 ]
+Add.1 |
Post-filter with reduced delay requirements
|
Qualcomm Inc.
|
Q6/16
|
2009-01-19 |
|
[ 127 ]
|
Proposal for updated and harmonized joint G.729.1/G.718 SWB/Stereo Characterization Phase I conditions
|
LM Ericsson
|
Q10/16
|
2009-01-19 |
|
[ 126 ]
+Add.1 |
Experimental Results on the Combination of High Precision Filters
|
Qualcomm Inc.
,
Nokia
,
Tandberg
|
Q6/16
|
2009-01-19 |
|
[ 125 ]
+Add.1 |
Improvements on Enhanced Directional Adaptive Filtering (EDAIF-2)
|
Nokia
,
Qualcomm Inc.
|
Q6/16
|
2009-01-19 |
|
[ 124 ]
+Add.1 |
Software platform for next generation video codec
|
Qualcomm Inc.
|
Q6/16
|
2009-01-19 |
|
[ 123 ]
+Add.1 |
Video Coding Using Extended Block Sizes
|
Qualcomm Inc.
|
Q6/16
|
2009-01-19 |
|
[ 122 ]
|
Improved Motion Vector Coding with Optimal PMV Selection
|
SK Telecom
|
Q6/16
|
2009-01-19 |
|
[ 121 ]
|
Comments on draft new H.IDscheme "ID schemes for multimedia access triggered by tag-based identification"
|
France Telecom
|
Q22/16, Q21/16
|
2009-01-19 |
|
[ 120 ]
|
Service discovery supporting universal multimedia access
|
ETRI
|
Q13/16
|
2009-01-19 |
|
[ 119 ]
|
Proposed Modifications to Draft Recommendation H.codec.qoe
|
ETRI
|
Q4/16
|
2009-01-19 |
|
[ 118 ]
|
Proposed Modifications to TP.IPTV-CMA
|
ETRI
|
Q13/16
|
2009-01-19 |
|
[ 117 ]
(Rev.1) |
Proposal for USN standardization roadmap of Q25/16
|
ETRI
|
Q25/16
|
2009-01-19 |
|
[ 116 ]
|
Proposed modification of H.IDscheme
|
ETRI
|
Q22/16, Q21/16
|
2009-01-19 |
|
[ 115 ]
|
Issues list and proposed modification of H.IRP
|
ETRI
|
Q22/16, Q21/16
|
2009-01-19 |
|
[ 114 ]
|
The destination Info field in Q.931 messages
|
Israel
|
Q2/16
|
2009-01-19 |
|
[ 113 ]
|
The conference list feature in H.323
|
Israel
|
Q2/16
|
2009-01-19 |
|
[ 112 ]
|
Comments on the ToR for the SWB and stereo extension to G.711.1 and G.722
|
Fraunhofer GFF
,
Dolby Sweden
|
Q10/16
|
2009-01-19 |
|
[ 111 ]
|
Maintenance of G.718 - decoder verification of the default value of reserved bits
|
LM Ericsson
|
Q9/16
|
2009-01-19 |
|
[ 110 ]
|
On requirements for next generation video coding standard
|
Nokia
|
Q6/16
|
2009-01-19 |
|
[ 109 ]
|
Testing of G.718 & G.729.1 stereo annexes (WB & SWB)
|
Nokia
|
Q10/16
|
2009-01-19 |
|
[ 108 ]
|
Corrections to the bitrate switching algorithm in G.729.1 DTX/CNG Annex C and D
|
Siemens Enterprise Communications
|
Q10/16
|
2009-01-19 |
|
[ 107 ]
+Add.1 |
Draft technical papers collecting ITU-T G.71x and G.72x performance
|
France Telecom
|
Q10/16
|
2009-01-19 |
|
[ 106 ]
|
Proposed stereo Terms of References for the superwideband/stereo extension to G.722 and G.711.1
|
France Telecom
|
Q10/16
|
2009-01-19 |
|
[ 105 ]
+Add.1-2 |
Pre- and post processing for G.711: test results with G.711.1 noise shaper and postfilter in French language
|
France Telecom
|
Q10/16
|
2009-01-19 |
Resultats:954 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):