Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 1540 ]
(Rev.1) |
Proposed DRNI work item
|
Ericsson Canada, Inc.
|
Q9/15
|
2011-11-17 |
|
[ 1539 ]
(Rev.1) |
Proposed G.8021.1
|
Ericsson Canada, Inc.
|
Q9/15, Q10/15
|
2011-11-17 |
|
[ 1538 ]
(Rev.1) |
Example of changes to G.8021 to support enhanced holdover
|
Ciena Canada
|
Q13/15
|
2011-11-17 |
|
[ 1537 ]
(Rev.1) |
G.8032 Support of E.LINE, E-TREE, and E-LAN Services
|
Ciena Canada
|
Q9/15
|
2011-11-17 |
|
[ 1536 ]
|
Withdrawn
Withdrawn
|
N/A
|
|
2011-11-18 |
|
[ 1535 ]
(Rev.1) |
Clean-up of G.8260 text
|
Zarlink Semiconductor
|
Q13/15
|
2011-11-17 |
|
[ 1534 ]
(Rev.1) |
Harmonization of cluster & percentile selection for clock emulation metrics
|
Zarlink Semiconductor
|
Q13/15
|
2011-11-17 |
|
[ 1533 ]
(Rev.1) |
Proposal to start a new recommendation G.metro (Ultra-dense WDM applications enabled by coherent detection and tuneable transceiver functionality)
|
China Unicom
,
Nokia Siemens Networks GmbH & Co. KG
|
Q6/15, Q2/15
|
2011-11-17 |
|
[ 1532 ]
|
Cost estimation of type X and proposal of new N:1 PON protection scheme
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q2/15
|
2011-11-17 |
|
[ 1531 ]
(Rev.1) |
Support for the consent and approval of G.hn draft Recommendations
|
Israel
|
Q4/15
|
2011-11-17 |
|
[ 1530 ]
(Rev.1) |
G.vector: Vectoring in the Presence of UPBO
|
Israel
|
Q4/15
|
2011-11-17 |
|
[ 1529 ]
(Rev.1) |
Proposal to study and include load sharing in G.808.1
|
Ericsson UK
|
Q9/15
|
2011-11-17 |
|
[ 1528 ]
|
Further example for the use of flexible grids in Appendix I of Rec. G.694.1
|
Nokia Siemens Networks GmbH & Co. KG
|
Q6/15
|
2011-11-15 |
|
[ 1527 ]
(Rev.1-3) |
Standardization of optical switching (photonic sub-lambda switching)
|
France Télécom Orange
,
Portugal Telecom, SGPS, S.A.
,
Swisscom SA
,
Telecom Italia S.p.A.
,
Telefónica, S.A.
,
Telstra Corporation Ltd.
,
Verizon Communication Corporation
|
Q12/15
|
2011-11-15 |
|
[ 1526 ]
(Rev.1) |
G.798 - default setting for PT=20 (2.5 G Time Slot)
|
Ericsson UK
|
Q9/15
|
2011-11-15 |
|
[ 1525 ]
(Rev.1) |
MPI: Experimental comparison between the ECL and the Fiber-Stretching test methods
|
Prysmian SpA
|
Q5/15
|
2011-11-11 |
|
[ 1524 ]
(Rev.1) |
Future revision of Rec. G.657 (bend-loss insensitive SMF)
|
Prysmian SpA
|
Q5/15
|
2011-10-28 |
|
[ 1523 ]
(Rev.1-3) |
Amendment of G.8113.1 based on results of Beijing expert meeting
|
Huawei Technologies Co. Ltd.
|
Q10/15
|
2011-10-14 |
|
[ 1522 ]
|
Template to describe a proposed new ITU-T Recommendation
|
France
|
QALL/15
|
2011-09-05 |
|
[ 1521 ]
(Rev.1) |
Submission to update the G3 DLL specs in Recommendation ITU-T G.9956
|
ERDF
|
Q4/15
|
2011-08-23 |
|
[ 1520 ]
|
DOCUMENT WITHDRAWN
|
Deutsche Telekom
|
Q6/15, Q11/15
|
2011-08-23 |
|
[ 1519 ]
|
New OTN interfaces in ITU-T G.709
|
Deutsche Telekom
|
Q6/15, Q11/15
|
2011-07-11 |
|
[ 1518 ]
|
Structuring of MPLS-TP Recommendations
|
Telefónica Investigación y Desarrollo
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-02-11 |
|
[ 1517 ]
|
Specification of a Pulse per Second (1PPS) interface for Telecom
|
Huawei
|
Q13/15
|
2011-02-02 |
|
[ 1516 ]
|
Translation of an IP Multicast address to an Ethernet MAC Multicast address
|
Huawei
|
Q13/15
|
2011-02-02 |
|
[ 1515 ]
|
PTP link-local and internetwork IPv4 Multicast addresses for hop-by-hop time transfer
|
Huawei
|
Q13/15
|
2011-02-02 |
|
[ 1514 ]
|
Effect of Pdelay or Delay Request/Response Turnaround Time, and Sojourn Time, on Boundary Clock Performance
|
Huawei
|
Q13/15
|
2011-02-02 |
|
[ 1513 ]
|
G.8275.1 time-profile: ClockClass attribute discussion
|
Huawei
|
Q13/15
|
2011-02-02 |
|
[ 1512 ]
|
Minimum 1PPS requirements and additional requirements
|
Huawei
|
Q13/15
|
2011-02-02 |
|
[ 1511 ]
|
Mathematical Description of Boundary Clock Simulation Models for the Case of Frequency Distribution via syncE
|
Huawei
|
Q13/15
|
2011-02-02 |
|
[ 1510 ]
|
Comparison of Boundary Clock Simulation Models
|
Huawei
|
Q13/15
|
2011-02-02 |
|
[ 1509 ]
|
Additional external 1PPS interface point, and PTP / non-PTP interworking for GPON/DSL
|
Huawei
|
Q13/15
|
2011-02-02 |
|
[ 1508 ]
|
Proposal on adding bandwidth degradation message in Y.1731
|
Huawei
|
Q10/15
|
2011-02-02 |
|
[ 1507 ]
|
Proposed text for protection path status update in G.smp
|
Huawei
,
Telefonica Investigacion y Desarrollo
|
Q9/15
|
2011-02-02 |
|
[ 1506 ]
|
Proposed text for gsmp
|
Huawei
,
Telefonica Investigacion y Desarrollo
|
Q9/15
|
2011-02-02 |
|
[ 1505 ]
(Rev.1) |
Proposed functional model for g.smp
|
Huawei
,
Telefonica Investigacion y Desarrollo
|
Q9/15
|
2011-02-02 |
|
[ 1504 ]
|
Proposal of ODU Shared Mesh Protection
|
Huawei
,
Telefonica Investigacion y Desarrollo
|
Q9/15
|
2011-02-02 |
|
[ 1503 ]
|
Proposal to include additional classification criteria and transfer parameters for G.rmon
|
Huawei
|
Q7/15
|
2011-02-02 |
|
[ 1502 ]
|
Functional description and transfer parameters of multi-degree reconfigurable OADM in G.680
|
Huawei
|
Q6/15
|
2011-02-02 |
|
[ 1501 ]
|
Consideration of optical non-linear limitations in G.696.1
|
Huawei
|
Q6/15
|
2011-02-02 |
|
[ 1500 ]
|
Proposal on ACL-SNCG/I for adaptive bandwidth in G.808.1
|
Huawei
|
Q9/15
|
2011-02-02 |
|
[ 1499 ]
|
Requirement summary for adaptive bandwidth in packet network
|
Huawei
|
Q9/15, Q10/15
|
2011-02-02 |
|
[ 1498 ]
|
Equipment models to support IEEE 1588
|
Huawei
|
Q9/15
|
2011-02-02 |
|
[ 1497 ]
|
Architectural constructs to describe phase/time distribution
|
Ciena Corporation
|
Q13/15
|
2011-02-02 |
|
[ 1496 ]
|
Multilayer SCN Issues
|
Ciena Corporation
|
Q14/15, Q12/15
|
2011-02-02 |
|
[ 1495 ]
|
G.8080 - SP10 - call routing
|
Ciena Corporation
|
Q14/15, Q12/15
|
2011-02-02 |
|
[ 1494 ]
|
G.8080 and multi-layer topology
|
Ciena Corporation
|
Q12/15
|
2011-02-02 |
|
[ 1493 ]
|
G.hao impact on G.7713
|
Ciena Corporation
|
Q14/15, Q11/15
|
2011-02-02 |
|
[ 1492 ]
|
G.8032 ( Encoding Ring Identifier in R-APS Message DA to Improve Network Scaling
|
Ciena Corporation
|
Q9/15
|
2011-02-02 |
|
[ 1491 ]
|
Editing of G.8010 V2
|
Ciena Corporation
|
Q12/15
|
2011-02-02 |
Resultats:2390 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):