International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : WP-7D : Contributions : 120 Recently posted -  Search Meeting Documents
   
[120]  Report of the meeting of Working Party 7D (16-23 September 2021, e-Meeting)

Format

Size

Posted

English

Word  

39057 bytes 2021-09-28 [120] Annex 14 - List of output (TEMP) documents (Documents 7D/TEMP/34 - 7D/TEMP/52)

Word  

37312 bytes 2021-09-28 [120] Annex 13 - Reply liaison statement to International Mobile Satellite Organization (IMSO) - WRC-23 agenda item 1.11 - Introduction of additional satellite systems into the Global Maritime Distress Safety System (GMDSS)

Word  

3096641 bytes 2021-09-27 [120] Annex 12 - Working document towards a preliminary draft new Report ITU-R RA.[RAS 6-7 GHZ] - RAS in the band 6 - 7 GHz

Word  

592782 bytes 2021-09-27 [120] Annex 11 - Elements for use in studies between the Radio Astronomy Service (RAS) and active services above 71 GHz, and meta-analysis of the studies

Word  

1294115 bytes 2021-09-27 [120] Annex 10 - Working document towards a preliminary draft new Report - Technical and operational characteristics of radio astronomy systems operating below 300 MHz

Word  

245343 bytes 2021-09-27 [120] Annex 9 - Preliminary draft new Report - Technical and operational characteristics of widely distributed-array mm-wave and sub-mm-wave systems above 200 GHz

Word  

44077 bytes 2021-09-27 [120] Annex 8 - Working document toward a preliminary draft new Report - Technical and operational characteristics of bolometers operating in the millimeter-wave regime

Word  

595564 bytes 2021-09-27 [120] Annex 7 - Working document toward a preliminary draft new Report - Unwanted emissions created by harmonics in radio astronomy bands: measurement of impacts of harmonic emission to radio facilities

Word  

32862 bytes 2021-09-27 [120] Annex 6 - Working document toward a preliminary draft new Question ITU-R XXX/7 - Facilitation of radio astronomy service operations in the Shielded Zone of the Moon

Word  

40354 bytes 2021-09-27 [120] Annex 5 - Working document towards a reply liaison statement to Working Parties 3J, 3K and 3M - Request for technical characteristics under Resolution 731 (Rev.WRC-19)

Word  

146626 bytes 2021-09-27 [120] Annex 4 - Working document towards a preliminary draft new ITU-R Report - Sharing above 71 GHz in response to Resolution 731 (Rev.WRC-19)

Word  

2317931 bytes 2021-09-27 [120] Annex 3 - Working document towards a preliminary draft new Report ITU-R RA.[RAS-IMT-COMPAT-43-GHz] - Possible coordination and protection measures for stations of the radio astronomy service from IMT systems operating in and adjacent to the 42.5 to 43.5 GHz band

Word  

43153 bytes 2021-09-24 [120] Annex 2 - Terms of Reference for Working Party 7D Correspondence Group on updates to the working document towards a draft new Report: Geodetic VLBI

Word  

1422974 bytes 2021-09-27 [120] Annex 1 - Working document towards a preliminary draft new Report on Geodetic VLBI

Word  

80996 bytes 2021-10-25 [120]  - Report on the September 2021 meeting of Working Party 7D (e-Meeting, Geneva, 16-23 September 2021)
 

Document :

ITU-R WP-7D  Contribution  120

Title :

Report of the meeting of Working Party 7D (16-23 September 2021, e-Meeting)

Date :

2021-09-23

Source :

Chairman, WP 7D

Access :

Restricted to TIES users [ITU-R]

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2021-10-25