International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP1B : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R R23-WP1B  C 

ITU-R R23-WP1B

Spectrum Management Methodologies and Economic Strategies

Results:35 total items.
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 35 ]  
 
Liaison statement on creation of new work item on economic and policy aspects of the provision of high-speed Internet connectivity by retail satellite operators     ITU-T SG3     2024-07-19
[ 34 ]  
 
Information on the preparation of texts for the draft CPM Report to WRC-27     Chair, CPM-27     2024-07-09
[ 33 ]  
+Ann.1-10 
Report on the first 2023-2027 meeting of Working Party 1B (Geneva, 12-19 June 2024)     Chair, WP 1B     2024-06-18
[ 32 ]  
 
Final list of participants - Working Party 1B (Geneva, 12-19 June 2024)     Director, BR     2024-06-18
[ 31 ]  
 
List of documents issued (Documents 1B/1 - 1B/31)     BR, Study Groups Department     2024-06-12
[ 30 ]  
 
Consideration of Document 1B/22 by Working Party 1A - Preliminary draft new Question ITU-R [UWB]/1     Acting Chairs, WPs 1A and 1B     2024-06-12
[ 29 ]  
 
Reply liaison statement to Working Party 7B (copy to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Relevant technical information to support studies under WRC-27 agenda item 1.15     WP 3J   AI1.15   2024-06-12
[ 28 ]  
 
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 7B, 7C AND 7D for information) - Relevant technical information to support studies under WRC-27 agenda item 1.7     WPs 3K & 3M   AI1.7   2024-06-10
[ 27 ]  
 
Reply liaison statement to Working Party 7D (copy to Working Parties 1B, 4A, 4C, 5A, 5B and 5D for information) - WRC-27 agenda items 1.16     WPs 3J & 3M   AI1.16   2024-06-10
[ 26 ]  
 
Report of the Correspondence Group to further work on the working document towards a preliminary draft new Report ITU-R SM.[GPR/WPR FREQ]     Co-Chairs, CG GPR/WPR     2024-06-05
[ 25 ]  
 
Proposed modification to the working document towards a preliminary draft revision of Report ITU-R SM.2012-6 - Economic aspects of spectrum management     India     2024-05-31
[ 24 ]  
 
Working document towards a preliminary draft revision of Report ITU-R SM.2153-9 - Technical and operating parameters and spectrum use for short range radiocommunication devices     Netherlands (Kingdom of the)     2024-05-29
[ 23 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R SM.1896-1 - Frequency ranges for global or regional harmonization of short-range devices     Netherlands (Kingdom of the)     2024-05-29
[ 22 ]  
 
Preliminary draft new Question ITU-R [UWB]/1     Germany , Austria , Finland , Hungary , Latvia , Netherlands (Kingdom of the) , Romania , Switzerland     2024-05-29
[ 21 ]  
 
Reply liaison statement to Working Party 7B (copy to Working Parties 1B, 3J, 4A, 4C, 5A, 5B, 5D, 7A, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.15     WP 5C   AI1.15   2024-05-29
[ 20 ]  
 
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 7B, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.7     WP 5C   AI1.7   2024-05-29
[ 19 ]  
 
Proposed modification to preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     Korea (Rep. of)   Q241/1   2024-05-29
[ 18 ]  
 
Reply liaison statement to Working Party 5D (copy for information to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5C, 7B, 7C, 7D and ICAO) - Relevant technical information for sharing studies under WRC-27 agenda item 1.7     WP 5B   AI1.7   2024-05-28
[ 17 ]  
 
Editorial revision and update of Report ITU-R SM.2353 - The challenges and opportunities for spectrum management resulting from the transition to digital terrestrial television in the UHF bands     United States     2024-05-24
[ 16 ]  
 
Liaison statement on implementation of WTDC Resolution 9 (Rev. Kigali, 2022) for digital skills and human hazards - ITU-D Study Group 2 Question 5/2: Adoption of telecommunications/ICTs and improving digital skills - ITU-D Study Group 2 Question 7/2: Strategies and policies concerning human exposure to electromagnetic fields     ITU-D SG2     2024-05-24
[ 15 ]  
 
Proposal for working document towards a preliminary draft revision of Report ITU-R SM.2012-6 - Economic aspects of spectrum management     China     2024-05-23
[ 14 ]  
 
Liaison statement to Working Party 4C (copy to Working Party 1B for information) - Relevant technical and operational information to support studies under WRC-27 agenda item 1.5     WP 4A   AI1.5   2024-05-14
[ 13 ]  
 
Liaison statement to ITU-R Working Party 1B on mutual activities - Economic aspects of telecommunication/ICTs     ITU-D SG1 Q4/1     2024-05-07
[ 12 ]  
 
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)     Chair, CCV     2024-04-22
[ 11 ]  
 
Liaison statement to Working Parties 4A, 4C and 5A (copy to Working Parties 1B, 3J, 3M, 5B and 5D for information) - WRC-27 agenda item 1.16     WP 7D   AI1.16   2024-03-28
[ 10 ]  
 
Liaison statement to Working Parties 3J and 3M (copy to Working Parties 1B, 4A, 4C, 5A, 5B, and 5D for information) on WRC-27 agenda items 1.16 and 1.18     WP 7D   AI1.18, AI1.16   2024-03-28
[ 9 ]  
 
Liaison statement for action to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D, and for information to Working Party 1B - Relevant technical information to support studies under WRC-27 agenda item 1.15     WP 7B   AI1.15   2024-03-27
[ 8 ]  
 
Liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7C and 7D) - WRC-27 agenda item 1.7     WP 7B   AI1.7   2024-03-27
[ 7 ]  
 
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B and 7D for information) - WRC-27 agenda item 1.7     WP 7C   AI1.7   2024-03-25
[ 6 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 1B, 3M, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D for information) - WRC-27 agenda item 1.6     WP 6A   AI1.6   2024-03-18
[ 5 ]  
 
Preliminary position on WRC-27 agenda     WMO     2024-03-06
[ 4 ]  
 
Liaison statement to Working Parties 1B, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D - Relevant technical information to support studies under WRC-27 agenda item 1.7     WP 5D   AI1.7   2024-02-13
[ 3 ]  
(Rev.1) 
Summary of the main results of RA-23 and CPM27-1 related to Study Group 1     Chair, SG 1     2024-02-05
[ 2 ]  
 
Text from WRC-23 Plenary for the attention of the ITU-R Working Parties that are either responsible for or contributing to studies relevant to items of the WRC-27 agenda or the WRC-31 preliminary agenda     Director, BR     2024-01-30
[ 1 ]  
 
Documents to be carried over from the 2019-2023 Study Period     WP 1B     2023-11-29
Results:35 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-08-16