Contributions
[ Source: WP 6S ] |
|
Numéro
|
Titre
|
Source
|
Date
|
|
[ 492 ]
(Rev.1) |
Reply to liaison statement from WP 4A - Power flux-density values and associated calculation methodology for interregional protection of the BSS from the GSO FSS in the band 11.7-12.7 GHz or the BSS where this service is not subject to a plan in the band 12.5-12.7 GHz
|
WP 6S
|
2002-10-08 |
|
[ 491 ]
|
Liaison statement to Task Group 1/7 and Working Parties 4A, 4-9S, 7C, 7D, 8B and 8D - Further comments on CPM text for Agenda items 1.82 and 1.32 (WRC-03) and on preliminary draft Recommendation ITU-R SM.[BbB]
|
WP 6S
|
2002-09-19 |
|
[ 490 ]
|
Liaison statement to Working Party 4A on 12 GHz band duplex feed antenna measurements
|
WP 6S
|
2002-09-16 |
|
[ 489 ]
|
Reply to liaison statements from Working Parties 4A and 8B - Sharing and compatibility between the fixed-satellite service (space-to-earth) in the band 17.3-17.7 GHz and the radiolocation service in the band 15.7-17.7 GHz
|
WP 6S
|
2002-09-16 |
|
[ 471 ]
|
Proposed draft CPM text on sharing between GSO BSS (Sound) and terrestrial mobile services at 2.6 GHz
|
WP 6S
|
2001-10-03 |
|
[ 470 ]
|
Note to the Chairmen, WP 4A and 9D - Text for the CPM on Agenda item 1.27 (WRC-03)
|
Chairman, WP 6S
|
2001-10-03 |
|
[ 462 ]
|
Reply to liaison statements from WPs 7D, 8D, 4A and TG 1/7 - Band-by-band studies and calculation/measurement of unwanted emission levels
|
WP 6S
|
2001-10-03 |
|
[ 458 ]
|
Liaison statement to WP 4A - Elements for the CPM text under Agenda item 1.30 in response to Resolution 735 (WRC-03) on BSS frequency bands not subject to Appendix 30
|
WP 6S
|
2001-10-03 |
|
[ 457 ]
|
Reply to liaison statement from Working Party 4A and liaison statement to Working Party 8D - Proposed CPM text for WRC-03 Agenda item 1.37
|
WP 6S
|
2001-10-03 |
|
[ 456 ]
|
Reply to liaison statement from WP 4A - Simplification of Appendix 2
|
WP 6S
|
2001-10-03 |
|
[ 447 ]
|
Liaison statement to WP 4A - PDNR - Equivalent pfd values and associated calculation methodology for inter-Regional protection of the BSS from the GSO FSS int eh band 11.7-12.7 GHz or non-planned BSS in the band 12.5-12.7 GHz
|
WP 6S
|
2001-10-03 |
|
[ 439 ]
|
Liaison statement to WP 6E and TG 6/8 and reply to Liaison statement from WP 4A - WRC-03 Agenda item 1.37
|
WP 6S
|
2001-10-03 |
|
[ 437 ]
|
Reply to liaison statement from WP 4A on continuous curves epfd down
|
WP 6S
|
2001-10-03 |
|
[ 436 ]
|
Liaison statement to Working Party 4A - Comment on CPM text for WRC-03, Agenda item 1.19
|
WP 6S
|
2001-10-03 |
|
[ 435 ]
|
Reply to liaison statement from Working Party 4A - Methodologies for calculating aggregate epfd down produced by multiple non-GSO FSS systems
|
WP 6S
|
2001-10-03 |
|
[ 434 ]
|
Reply to Liaison statement from WP 4A - Comments on CPM text for Agenda item 1.32 on protection of the radio astronomy service
|
WP 6S
|
2001-10-03 |
|
[ 430 ]
|
Reply to liaison statement from WPs 8D and 4A - Interference by non-gso satellites into radio astronomy
|
WP 6S
|
2001-10-03 |
|
[ 404 ]
|
Reply to liaison statements from WP 4A and liaison statement to JWP 4-9S - WRC-03 Agenda Item 1.25 concerning HDFSS at 17-22 GHz
|
WP 6S
|
2001-10-03 |
|
[ 341 ]
|
Liaison statement to Working Parties 4A, 9D and Study Group 1 on proposed outline for section 3.2 of the CPM Report - Sharing criteria and associated regulatory procedures in Appendices S30 and S30A (Agenda item 1.27)
|
WP 6S
|
2001-10-03 |
|
[ 339 ]
|
Reply to Liaison statements from WP 4A and WP 4-9S - Consideration on allocation to the FSS in the space-to-earth direction in the bands 17.3-17.7 GHz and 21.4-22.0 GHz
|
WP 6S
|
2001-10-03 |
|
[ 338 ]
|
Liaison statement to WPs 4A and 9D on The coordination of transmitting terrestrial stations or transmitting FSS earth stations with BSS earth stations
|
WP 6S
|
2001-10-03 |
|
[ 337 ]
|
Liaison statement to WP 4A and Special Rapporteur Group 6S/SRG-12 on the preliminary results from the downlink sharing studies requested in Res. 540 (WRC-2000)
|
WP 6S
|
2001-10-03 |
|
[ 336 ]
|
Reply to Liaison statement from Task Group 1-7 - Levels of unwanted emissions
|
WP 6S
|
2001-10-03 |
|
[ 335 ]
|
Liaison statement to Working Party 4A - Methodologies for calculating aggregate EPFDdown produced by multiple non-GSO FSS systems
|
WP 6S
|
2001-10-03 |
|
[ 334 ]
|
Reply to Liaison statement from SG 1, WP's 4A, 7C, 7D, 8D, TG 1/7
|
WP 6S
|
2001-10-03 |
|
[ 333 ]
|
Reply to Liaison statement to TG 1/7, WP's 4A, 7D, 7E and 8D
|
WP 6S
|
2001-10-03 |
|
[ 332 ]
|
Reply to liaison statement to Working Party 4A - Practical levels of unwanted emissions
|
WP 6S
|
2001-10-03 |
|
[ 331 ]
|
Reply to Liaison statement from WP 4A - Comments on DNR "Impact of sun interference into a GSO FSS link"
|
WP 6S
|
2001-10-03 |
|
[ 325 ]
|
Liaison statement to WP 4A, JWP 4-9s and the Special Committee on the Current Regulatory Situation of Typical FSS/BSS Earth Stations
|
WP 6S
|
2001-10-03 |
|
[ 323 ]
|
Liaison statement to SCRPM, WP 4A and note to the Director of the Radiocommunication Bureau - Simplification of the information and format used for coordination requests (Appendix S4)
|
WP 6S
|
2001-10-03 |
|
[ 314 ]
|
Liaison statement to WP 4A and Note to the Director of the Radiocommunication Bureau
|
WP 6S
|
2001-10-03 |
|
[ 74 ]
(Rev.1) |
Liaison statement from Working Party 6S to Working Party 4A - Proposed draft agenda for joint 4A/6S meeting on 26 September 2000
|
WP 6S
|
2001-10-03 |
|
[ 73 ]
|
Reply to liaison statement from Working Party 4A - Study of characteristics of radars and mitigation techniques for the protection of FSS systems in the 17.3-17.7 GHz band
|
WP 6S
|
2001-10-03 |
Resultats:33 documents
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):