Contributions
Numéro
Titre
Source
AI/Question
Filtre...
136-2/6
229-3/5
233/3
271/4
277/4
46-3/4
73-2/4
75-3/4
Effacer filtre
Date
[ 196 ]
(Rev.1)
Liaison statement to Working Party 4B - Revision of Recommendation ITU-R BO./BT.1774 - Use of satellite and terrestrial broadcast infrastructures for public warning, disaster mitigation and relief
WP 6A
2015-08-03
[ 195 ]
Reply liaison statement to Working Party 4C, Study Group 4 and Study Group 5 (with information to Working Parties 3M, 4A, 4B, 5A, 5B, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.10
WP 5C
2015-07-16
[ 194 ]
Liaison statement to Working Party 4B - Preliminary draft new Recommendation ITU-R S.[SHORT-TERM-PERF] - Allowable short-term error performance for a satellite hypothetical reference digital path
WP 4A
2015-07-14
[ 193 ]
Liaison statement on the latest versions of the Access Network Transport (ANT) standards overview and work plan
ITU-T SG 15
2015-07-14
[ 192 ]
Liaison statement on new versions of the Access Network Transport (ANT) standardization overview and work plan (reply to SG15 LS216)
ITU-T SG9
2015-07-10
[ 191 ]
Liaison statement to Working Party 5B (copy for information to Working Parties 4B and 4C) - Comments on the working document towards a preliminary draft new Report ITU-R M.[UAS-FSS]
WP 4A
2015-07-01
[ 190 ]
Reply liaison statement to Study Group 5 (copy for information to Working Party 4B, 4C and 5D) - Coexistence issues between the satellite and terrestrial components of IMT and the proposed revision of Recommendation ITU-R M.1036-4
SG 4
2015-06-30
[ 189 ]
Liaison statement to Working Parties 3M, 4A, 4B, 5A, 5B, 5C, 7A, 7B, 7C and 7D - WRC-15 agenda item 1.10
WP 4C
2015-06-23
[ 188 ]
Liaison statement to Working Party 4C (copy for information to Study Groups 4 and 5 and Working Party 4B) - Coexistence issues between the satellite and terrestrial components of IMT and the proposed revision of Recommendation ITU-R M.1036-4
WP 5D
2015-06-22
[ 187 ]
Liaison statement to Working Party 4B - Review of ITU-R Resolutions and Opinion on IMT
WP 5D
2015-06-22
[ 186 ]
+Ann.1-11
Report on the thirty-eighth meeting of Working Party 4B (Geneva, 15-19 June 2015)
Chairman, WP 4B
2015-06-19
[ 185 ]
Final list of participants - Working Party 4B (Geneva, 15-19 June 2015)
Director, BR
2015-06-19
[ 184 ]
Draft reply liaison statement to Working Party 5D - Review of ITU-R Resolutions and Opinion on IMT
Chairman, WP 4B
2015-06-15
[ 183 ]
Reply liaison statement to Working Party 5D (copy for information to Study Groups 4 and 5 and Working Party 4B) - Coexistence issues between the satellite and terrestrial components of IMT and the proposed revision of Recommendation ITU-R M.1036-4
WP 4C
2015-06-12
[ 182 ]
List of documents issued (Documents 4B/162 - 4B/182)
BR Study Groups Department
2015-06-12
[ 181 ]
Proposed draft new Recommendation ITU-R S.[SHORT-TERM-PERF] - Allowable short-term error performance for a satellite hypothetical reference digital path
Korea (Republic of)
277/4
2015-06-05
[ 180 ]
Proposed draft revision of Recommendation ITU-R M.2014 - Global circulation of IMT-2000 satellite terminals
Korea (Republic of)
229-3/5
2015-06-05
[ 179 ]
Proposed working document towards a preliminary draft new Report ITU-R BO.[UHDTV-SAT EXP] - Satellite transmission experiments for UHDTV satellite broadcasting
Japan
2015-06-03
[ 178 ]
A preliminary draft new Recommendation ITU-R BO.[UHDTV_TRANSMISSION] - Transmission system for UHDTV satellite broadcasting
Japan
2015-06-03
[ 177 ]
Draft new Question ITU-R BO.[UHDTV_SAT]/4 - Studies on UHDTV satellite broadcasting system
Japan
2015-06-03
[ 176 ]
Compatibility and sharing between terrestrial an satellite components of IMT in frequency bands around 2 GHz
Director, BR
2015-05-07
[ 175 ]
Liaison statement to Working Party 4B - Transmission systems for UHDTV satellite broadcasting
WP 6A
2015-03-16
[ 174 ]
Liaison statement to Working Party 4B - DVB-S2X: the extensions of the 2nd generation standard for satellite broadband services
WP 6B
2015-02-11
[ 173 ]
Liaison statement to Working Party 4B on the review of ITU-R Resolutions and Opinion
WP 5D
2015-02-11
[ 172 ]
Liaison statement to ITU-T Study Group 13 and ITU-R Working Parties 4B and 5C (copy to ITU-D Study Groups 1 and 2) - Handbook on "Global trends in IMT"
WP 5D
2015-02-10
[ 171 ]
Reply liaison statement on hybrid satellite systems
ITU-T SG 5
2015-02-10
[ 170 ]
Liaison statement on scope of work of ITU-D Question 2/1 - Broadband access technologies, including IMT, for developing countries
ITU-D SG 1
2015-02-10
[ 169 ]
Liaison statement on new version of the Home Network Transport (HNT) standardization overview and work plan
ITU-T SG 15
2015-01-07
[ 168 ]
Liaison statement on new versions of the Access Network Transport (ANT) standardization overview and work plan
ITU-T SG 15
2015-01-07
[ 167 ]
Liaison statement to ITU-R Working Parties 4A and 4B (copy for information to Working Party 4C) - WRC-15 agenda item 1.5
WP 5B
2014-12-10
[ 166 ]
Liaison statement to Working Party 4B - Transmission systems for UHDTV satellite broadcasting
WP 6B
2014-12-02
[ 165 ]
Reply liaison statement to Working Party 4C (copy for information to Working Party 4B and Study Groups 4 and 5) - Revision of Recommendation ITU-R M.1036-4 and coexistence issues between the satellite and terrestrial components of IMT
WP 5D
2014-10-30
[ 164 ]
Liaison statement on a new study for high speed transmission scheme by channel bonding technology for UHDTV distribution on cable TV networks
ITU-T SG 9
2014-10-03
[ 163 ]
Liaison statement to Working Party 4B - Guidance on the application of propagation Recommendations to unmanned aircraft systems (WRC-15 agenda item 1.5)
WP 3K
2014-09-12
[ 162 ]
+Ann.1-12
Report on the thirty-seventh meeting of Working Party 4B (Geneva, 30 June - 4 July 2014)
Chairman, WP 4B
2014-07-04
[ 161 ]
Final list of participants - Working Party 4B (Geneva, 30 June - 4 July 2014)
Director, BR
2014-07-04
[ 160 ]
List of documents issued (Documents 4B/139 - 4B/160)
BR Study Groups Department
2014-06-27
[ 159 ]
Liaison statement to Working Party 5D (copy for information to Working Party 4B and Study Group 4) - Proposal on the revision of Recommendation ITU-R M.1036-4
WP 4C
2014-06-27
[ 158 ]
Proposal for reply liaison statement to Working Party 5B - WRC-15 agenda item 1.5
Germany (Federal Republic of)
2014-06-23
[ 157 ]
Liaison statement to ITU-R Working Party 4B - Information on some ongoing work within the Satellite Emergency Communication work group of ETSI TC SES
European Telecommunications Standards Institute
2014-06-19
[ 156 ]
Working document towards preliminary draft new Recommendation/Report ITU-R M.[PERF-INTEG-MSS] - Scenarios and performance of an integrated MSS system operating in frequency bands below 3 GHz
Korea (Republic of)
2014-06-18
[ 155 ]
Proposed preliminary draft new Recommendation ITU-R S.[SHORT-TERM-PERF] - Allowable short-term error performance for a satellite hypothetical reference digital path
Korea (Republic of)
277/4
2014-06-18
[ 154 ]
Proposed modifications to a preliminary draft new Report ITU-R S.[MULTI_POL] - Multi-dimensional signal mapping technique for satellite communications contained in Annex 4 to Working Party 4B Chairman's Report
Japan
46-3/4
2014-06-17
[ 153 ]
Proposed working document towards a preliminary draft new Recommendation ITU-R BO.[UHDTV_TRANSMISSION] - Transmission system for UHDTV satellite broadcasting
Japan
2014-06-17
[ 152 ]
Proposed modifications to a preliminary draft revision of Report ITU-R S.2173 contained in Annex 3 to Working Party 4B Chairman's Report
Japan
46-3/4
2014-06-17
[ 151 ]
Draft new Recommendation ITU-R S.[DIGCID]- Carrier identification system for digital-modulation transmissions for fixed-satellite service (FSS) occasional use (OU) carrier earth station transmissions
Japan
271/4
2014-06-17
[ 150 ]
Liaison statement to Working Party 4B - Hybrid satellite systems
ITU-T SG 5
2014-06-06
[ 149 ]
Liaison statement to Working Party 4C (copied for information to Working Parties 3M, 4A, 4B, 5C, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.10
WP 5A
2014-06-03
[ 148 ]
Liaison statement to Working Parties 4C and 5B (copy for information to Working Parties 3M, 4A, 4B, 5A, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.10
WP 5C
2014-05-28
[ 147 ]
Liaison statement to Working Party 4C (copy to Working Parties 3M, 4A, 4B, 5A, 5B and 7B for information) - WRC-15 agenda item 1.9.2
WP 5C
2014-05-28
Resultats:196 documents Résultats :
1 -
2 -
3 -
4
- Suivant
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):