Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 81 ]
|
Report ITU-R BT.2470-0 - Use of Monte Carlo simulation to model interference to DTTB
|
SG 6
|
|
2019-10-10 |
|
[ 80 ]
|
Recommendation ITU-R P.681-11 - Propagation data required for the design systems in the land mobile-satellite service
|
SG 3
|
|
2019-08-29 |
|
[ 79 ]
|
Liaison statement on the definition of broadband access
|
SCV
|
|
2019-08-26 |
|
[ 78 ]
|
Liaison statement on results fo ITU's work on machine learning for 5G networks
|
ITU-T FG ML5G
|
|
2019-08-26 |
|
[ 77 ]
|
Note to Study Group 5 (copy to Study Groups 4, 6 and 7) - Coordination among Study Groups and Working Parties
|
WP 5D
|
|
2019-07-22 |
|
[ 76 ]
|
Summary record of the Study Group 4 meeting on 5 July 2019
|
Chairman, SG 4
|
|
2019-07-08 |
|
[ 75 ]
|
Final list of participants - Study Group 4 (Geneva, 5 July 2019)
|
Director, BR
|
|
2019-07-05 |
|
[ 74 ]
|
List of documents issued (Documents 4/47 - 4/74)
|
BR Study Groups Department
|
|
2019-07-04 |
|
[ 73 ]
|
Executive Report of the fifth, sixth and seventh meetings of Working Party 4A in the 2015-2019 study cycle (Geneva, 20 February - 2 March and 3-14 July 2018, and 26 June - 4 July 2019)
|
Chairman, WP 4A
|
|
2019-07-04 |
|
[ 72 ]
|
Executive Report of the forty-third, forty-fourth and forty-fifth meetings of Working Party 4B (Geneva, 19-23 February and 2-6 July 2018, and 26-30 June 2019)
|
Chairman, WP 4B
|
|
2019-07-04 |
|
[ 71 ]
|
Executive Report of the twentieth, twenty-first and twenty-second meetings of Working Party 4C (Geneva, 13 to 20 February 2018, 25 June to 2 July 2018 and 19 to 25 June 2019)
|
Chairman, WP 4C
|
|
2019-07-04 |
|
[ 70 ]
|
Draft new Report ITU-R BO.[AP30.ANNEX7] - Assessment on limitations mentioned in Annex 7 to RR Appendix 30 (Rev.WRC 15) in the 11.7-12.7 GHz band for the GSO broadcasting-satellite service in all Regions
|
WP 4A
|
|
2019-07-04 |
|
[ 69 ]
(Rev.1) |
Draft new Report ITU-R S.[AGENDA ITEM 1.5] - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz
|
WP 4A
|
AI1.5
|
2019-07-04 |
|
[ 68 ]
(Rev.1) |
Draft revision of Recommendation ITU-R S.1782-0 - Possibilities for global broadband Internet access by fixed-satellite service systems
|
WP 4A
|
|
2019-07-04 |
|
[ 67 ]
|
Draft new Report ITU-R S.[SPECTRUM_SHARING] - Sharing with incumbent services in the 51.4-52.4 GHz band and adjacent and nearby bands
|
WP 4A
|
AI 9.1, AI 9.1.9
|
2019-07-04 |
|
[ 66 ]
(Rev.1) |
Draft new Report ITU-R S.[50/40 GSO-NON-GSO SHARING] - Sharing between 50/40 GHz GSO networks and non-GSO systems
|
WP 4A
|
AI 1.6
|
2019-07-04 |
|
[ 65 ]
|
Draft new Report ITU-R S.[SPECTRUM_NEEDS] - Spectrum needs for the FSS in the 51.4-52.4 GHz band - WRC-19 agenda item 9.1, issue 9.1.9
|
WP 4A
|
AI 9,1, AI 9,1,9
|
2019-07-04 |
|
[ 64 ]
(Rev.1) |
Draft new Report ITU-R M.[NGAT_SAT] - Key elements for integration of satellite systems into Next Generation Access Technologies
|
WP 4B
|
|
2019-07-01 |
|
[ 63 ]
(Rev.1) |
Draft new Recommendation ITU-R S.[ACM-PERF] - A method for the determination of performance objectives for satellite hypothetical reference digital paths using adaptive coding and modulation
|
WP 4B
|
|
2019-06-28 |
|
[ 62 ]
(Rev.1) |
Draft new Report ITU-R M.[GMDSS-SATREG] - Introduction of additional mobile-satellite service systems into the GMDSS
|
WP 4C
|
AI1.8
|
2019-06-27 |
|
[ 61 ]
|
Liaison statement on ITU inter-Sector coordination
|
ITU-T SG 11
|
|
2019-03-21 |
|
[ 60 ]
|
Reply liaison statement to Working Party 4A (copy for information to Working Party 6A and Study Groups 4 and 5) - Preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY]
|
WP 5D
|
|
2019-03-05 |
|
[ 59 ]
|
Liaison statement on ITU inter-Sector coordination
|
ITU-T TSAG
|
|
2018-12-17 |
|
[ 58 ]
|
Liaison statement on ITU Inter-Sector Coordination (reply to TSAG-LS11)
|
ITU-T SG 9
|
|
2018-12-12 |
|
[ 57 ]
|
Draft new Report ITU-R M.[RNSS_Apps] - RNSS applications in the 1 164-1 215 MHz, 1 215-1 300 MHz, and 1 559-1 610 MHz frequency bands
|
WP 4C
|
Q288/4, Q217/4
|
2018-07-23 |
|
[ 56 ]
(Rev.1) |
Draft revision of Recommendation ITU-R M.1905 - Characteristics and protection criteria for receiving earth stations in the radionavigation-satellite service (space-to-Earth) operating in the band 1 164-1 215 MHz
|
WP 4C
|
|
2018-07-23 |
|
[ 55 ]
(Rev.1) |
Draft revision of Recommendation ITU-R M.1904 - Characteristics, performance requirements and protection criteria for receiving stations of the radionavigation-satellite service (space-to-space) operating in the frequency bands 1 164-1 215 MHz, 1 215-1 300 MHz and 1 559-1 610 MHz
|
WP 4C
|
Q288/4, Q217/4
|
2018-07-23 |
|
[ 54 ]
(Rev.1) |
Draft revision of Recommendation ITU-R M.1903 - Characteristics and protection criteria for receiving earth stations in the radionavigation-satellite service (space-to-Earth) and receivers in the aeronautical radionavigation service operating in the band 1 559-1 610 MHz
|
WP 4C
|
|
2018-07-23 |
|
[ 53 ]
(Rev.1) |
Draft revision of Recommendation ITU-R M.1902 - Characteristics and protection criteria for receiving earth stations in the radionavigation-satellite service (space-to-Earth) operating in the band 1 215-1 300 MHz
|
WP 4C
|
|
2018-07-23 |
|
[ 52 ]
(Rev.1) |
Draft revision of Recommendation ITU-R M.1901-1 - Guidance on ITU-R Recommendations related to systems and networks in the radionavigation-satellite service operating in the frequency bands 1 164-1 215 MHz, 1 215-1 300 MHz, 1 559-1 610 MHz, 5 000-5 010 MHz and 5 010-5 030 MHz
|
WP 4C
|
|
2018-07-23 |
|
[ 51 ]
|
Draft revision of Report ITU-R BO.2071-1 - BSS system parameters between 17.3 GHz and 42.5 GHz and associated feeder links
|
WP 4B
|
|
2018-07-17 |
|
[ 50 ]
|
Liaison statement on ITU inter-Sector coordination
|
ITU-T (TSAG)
|
|
2018-03-05 |
|
[ 49 ]
|
Liaison statement on the results of the 1st meeting of the ITU-T Focus Group on machine learning for future networks including 5G (FG ML5G)
|
ITU-T FG ML5G
|
|
2018-02-08 |
|
[ 48 ]
|
Liaison statement - New ITU-T Study Group 13 terms and definitions
|
ITU-R CCV, ITU-T SCV
|
|
2018-02-09 |
|
[ 47 ]
+Add.1 |
Summary record of the Study Group 4 meeting on 27 October 2017
|
Chairman, SG 4
|
|
2017-11-16 |
|
[ 46 ]
|
Final list of participants - Study Group 4 (Geneva, 27 October 2017)
|
Director, BR
|
|
2017-10-27 |
|
[ 45 ]
|
List of documents issued (Documents 4/24 - 4/45)
|
BR Study Groups Department
|
|
2017-10-27 |
|
[ 44 ]
|
Executive Report of the third and fourth meetings of Working Party 4A in the 2015-2019 study cycle (Geneva, 3-12 May and 17-27 October 2017)
|
Chairman, WP 4A
|
|
2017-10-27 |
|
[ 43 ]
|
Executive Report of the forty first and forty second meeting of Working Party 4B (Geneva, 1-5 May & 26-30 September 2017)
|
Chairman, WP 4B
|
|
2017-10-27 |
|
[ 42 ]
|
Draft new Report ITU-R S.[INTRF MGMT VSAT IN 27.5-30 GHz] - Uplink interference issues associated with closely separated GSO FSS VSAT networks in the 27.5-30 GHz frequency band
|
WP 4A
|
|
2017-10-27 |
|
[ 41 ]
|
Draft revision of Recommendation ITU-R S.1503-2 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed satellite system networks with limits contained in Article 22 of the Radio Regulations
|
WP 4A
|
|
2017-10-27 |
|
[ 40 ]
(Rev.1) |
Draft new Recommendation ITU-R S.[GUIDELINES_14.5-14.8 GHz] - Guidelines to conduct bilateral coordination for explicit agreements, in the frequency band 14.5-14.75 GHz, for Regions 1 and 2 countries, or in the frequency band 14.5-14.8 GHz, for Region 3 countries, in the fixed-satellite service (Earth-to-space) not for feeder links for the broadcasting-satellite service, in order
|
WP 4A
|
|
2017-10-27 |
|
[ 39 ]
|
Note to the Chairman of Study Group 4 (copy for information to Working Parties 4B and 4C) - Cost Recovery for non-GSO satellite networks
|
WP 4A
|
|
2017-10-27 |
|
[ 38 ]
|
Executive Report of the eighteenth and nineteenth meetings of Working Party 4C (Geneva, 26 April - 2 May 2017 and 10-17 October 2017)
|
Chairman, WP 4C
|
|
2017-10-25 |
|
[ 37 ]
|
Draft revision of Recommendation ITU-R M.1184-2 - Technical characteristics of mobile satellite systems in the frequency bands below 3 GHz for use in developing criteria for sharing between the mobile-satellite service (MSS) and other services
|
WP 4C
|
|
2017-10-23 |
|
[ 36 ]
(Rev.1) |
Draft revision of Recommendation ITU-R M.1787-2 - Description of systems and networks in the radionavigation-satellite service (space-to-Earth and space-to-space) and technical characteristics of transmitting space stations operating in the bands 1 164-1 215 MHz, 1 215-1 300 MHz and 1 559-1 610 MHz
|
WP 4C
|
Q217/4
|
2017-10-23 |
|
[ 35 ]
(Rev.1) |
Note to the Chairman of Study Group 4 (copy for information to Working Parties 4A and 4B) - Cost Recovery for non-GSO satellite networks
|
WP 4C
|
|
2017-10-17 |
|
[ 34 ]
|
Liaison statement on the first meeting of ITU-T Focus Group on data processing and management to support IoT and Smart Cities & Communities (FG-DPM)
|
ITU-T FG-DPM
|
|
2017-07-21 |
|
[ 33 ]
|
Liaison statement on Operational Plan for Implementation of WTSA-16 Resolutions 72 and 73 (Hammamet, 2016), and Resolution 79 (Dubai, 2012)
|
ITU-T SG 5
|
|
2017-06-19 |
|
[ 32 ]
|
Liaison statement on ITU-T Study Group 5 lead Study Group activities
|
ITU-T SG 5
|
|
2017-06-19 |
Resultats:81 documents Résultats :
1 -
2
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):