Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : WP1A : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-R WP1A  C 

UIT-R WP1A

Techniques d´Ingénierie du Spectre

Resultats:11 documents
Contributions  [ Source: WP 5D ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 459 ]  
 
Reply liaison statement to Working Party 1A - Characteristics of terrestrial IMT systems for studies on the impact of WPT-Beam on IMT systems     WP 5D     2019-07-22
[ 389 ]  
 
Reply liaison statement to ITU-R Working Parties 1A and 1C (copy to 3GPPRAN4/RAN5 - Test methods for over-the-air TRP measurements of IMT radio equipment utilizing active antennas     WP 5D     2019-03-05
[ 388 ]  
 
Reply liaison statement to Working Party 1A (copy to ITU-T Study Group 15 and ITU-R Working Parties 5A, 5B, 5C, 6A, 7A, 7B, 7C and 7D) - Preliminary draft revision of Report ITU-R SM.2351-2 on smart grid utility management systems     WP 5D     2019-03-05
[ 363 ]  
 
Reply liaison statement to ITU-R Working Pary 1A (copy for information to ITU-T Study Group 15 and ITU-R Working Parties 5A, 5B, 5C, 6A, 7A, 7B, 7C and 7D) - Preliminary draft revision of Report ITU-R SM.2351-2 on Smart grid utility management systems     WP 5D     2018-10-23
[ 348 ]  
 
Liaison statement to Working Parties 1A and 1C - Definition of and test methods for OTA unwanted emission of IMT radio equipment     WP 5D     2018-07-11
[ 265 ]  
 
Response liaison statement to ITU-T Study Group 5 - Copy to ITU-R Study Group 1 - Considerations of EMC/EMI in relation to IMT     WP 5D     2018-02-13
[ 217 ]  
 
Liaison statement to Working Party 1A on unwanted emissions of IMT-2020 systems utilizing active antenna systems (AAS) and total radiated power (copy to Working Party 1C for information)     WP 5D     2017-10-13
[ 151 ]  
 
Reply liaison statement to ITU-R Working Party 1B (copy to Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9) - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means...     WP 5D     2017-02-24
[ 68 ]  
 
Reply liaison statement to ITU-R /ITU-D Joint Group on WTDC Resolution 9 on the progress of ongoing work on WTDC Resolution 9 (Rev. Dubai, 2014) during the ITU-D Study period 2014-2017 (copied to ITU-R Working Parties 1A, 1B, 1C, 5A, 5B, 5C and 6A for information)     WP 5D     2016-06-28
[ 67 ]  
 
Liaison statement to Working Party 7B (copied to Working Parties 1A, 3M, 4A, 4B, 4C, 5B, 5C and 6A for information) - Technical and operational characteristics for the work under WRC-19 agenda item 1.7     WP 5D   AI1.7   2016-06-24
[ 10 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C AND 7D) - Working document towards a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED]     WP 5D     2016-03-09
Resultats:11 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2024-7-31