Contributions
[ AI/Question: Q210/1 ] |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 368 ]
|
Proposal for an update of working document towards a preliminary draft new Report ITU-R SM.[WPT_EV_IMPACT]
|
Korea (Republic of)
|
Q210/1, AI9.1
|
2019-05-21 |
|
[ 359 ]
|
Working document towards a preliminary draft new Recommendation ITU-R SM.[WPT-EV_FREQUENCIES] - Frequency ranges for operation of non-beam wireless power transmission systems for electric vehicles
|
Germany (Federal Republic of)
|
Q210/1, AI901
|
2019-05-15 |
|
[ 358 ]
|
Elements for a working document towards a preliminary draft new Report ITU-R SM.[WPT-REGULATION] - [Regulatory considerations of wireless power transmission (WPT)]
|
Germany (Federal Republic of)
|
Q210/1
|
2019-05-15 |
|
[ 354 ]
|
Preliminary draft new Recommendation ITU-R SM.[WPT-EV_FREQUENCIES] - Frequency ranges for operation of non-beam wireless power transmission systems for electric vehicles
|
United States of America
|
Q210/1
|
2019-05-09 |
|
[ 353 ]
|
Proposed suppression of elements for a working document towards a preliminary draft new Report ITU-R SM.[WPT-REGULATION]
|
United States of America
|
Q210/1
|
2019-05-09 |
|
[ 339 ]
|
Liaison statement to Working Parties 1A and 1B (copy for information to ICAO) - Aeronautical radionavigation service information for Wireless Power Transmission (WPT)
|
WP 5B
|
Q210/1
|
2018-11-16 |
|
[ 335 ]
|
Proposed modifications to Annex 4 to Document 1B/303 "Working document towards a preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM]"
|
European Broadcasting Union
|
Q210/1, AI9.1
|
2018-11-09 |
|
[ 334 ]
|
Proposed modifications to Section 3 of Annex 4 to Document 1B/303 "Working document towards a preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM]"
|
European Broadcasting Union
|
Q210/1, AI9.1
|
2018-11-09 |
|
[ 333 ]
|
WPT interference to AM broadcast services: Measurement of building entry loss
|
European Broadcasting Union
|
Q210/1, AI9.1
|
2018-11-09 |
|
[ 332 ]
|
Support to the development of a new ITU-R Recommendation on required limits of WPT emissions to protect radiocommunication services - Limits and measures to mitigate disturbances from Wireless Power Transmission systems to radiocommunication systems operating below [30 MHz]
|
European Broadcasting Union
|
Q210/1, AI9.1
|
2018-11-09 |
|
[ 331 ]
|
Analysis of the study in Section 7.1.3.3 of Annex 4 to Document 1B/303 - Working document towards a preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM] - (Question ITU-R 210-3/1)
|
European Broadcasting Union
|
Q210/1, AI9.1
|
2018-11-09 |
|
[ 326 ]
|
Proposed revision of working document towards a preliminary draft new Report ITU-R SM. [WPT-SPEC-MNGM]
|
Japan
|
Q210/1, AI9.1
|
2018-11-08 |
|
[ 325 ]
|
Proposal for an update of working document towards a preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM]
|
Korea (Republic of)
|
Q210/1, AI9.1
|
2018-11-07 |
|
[ 324 ]
|
Proposed modification of working document towards a preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM]
|
Korea (Republic of)
|
Q210/1, AI9.1
|
2018-11-07 |
|
[ 321 ]
|
Liaison statement to Working Parties 1A and 1B on protection of sound broadcasting receivers from WPT systems
|
WP 6A
|
Q210/1, AI9.1
|
2018-10-24 |
|
[ 318 ]
|
Elements for a working document towards a preliminary draft new Recommendation ITU-R [WPT-UNWANTED] - Limits and measures to mitigate disturbances from Wireless Power Transmission systems to radiocommunication systems operating below [30 MHz]
|
Turkey
|
Q210/1
|
2018-10-14 |
|
[ 307 ]
|
Liaison statement to Working Parties 5A, 5B, 6A and 7A (copy to Working Party 1B for information) on preliminary draft revision of Recommendation ITU-R SM.2110-0 - Frequency ranges for operation of non-beam wireless power transmission systems
|
WP 1A
|
Q210/1
|
2018-07-02 |
|
[ 304 ]
|
Liaison statement to Working Party 1B on elements for a working document towards preliminary draft new Recommendation ITU-R SM.[WPT-UNWANTED]
|
WP 1A
|
Q210/1
|
2018-06-29 |
|
[ 282 ]
|
Proposed revision of preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM]
|
Japan
|
Q210/1, AI9.1
|
2018-05-28 |
|
[ 281 ]
|
Proposal on preliminary draft revision of Recommendation ITU-R SM.2110-0
|
Japan
|
Q210/1, AI9.1
|
2018-05-28 |
|
[ 271 ]
|
Wireless power transfer (WPT) further studies on the performance of MF AM sound broadcasting receivers in the presence of interference from WPT
|
British Broadcasting Corporation (BBC)
|
Q210/1
|
2018-05-25 |
|
[ 263 ]
|
Proposal on draft CPM text on WRC-19 agenda item 9.1, issue 9.1.6 - Resolution 958 (WRC-15) Annex item 1 (WPT4EV)
|
Korea (Republic of)
|
Q210/1, AI9.1
|
2018-05-25 |
|
[ 262 ]
(Rev.1) |
Proposed modification of a preliminary draft revision of Recommendation ITU-R SM.2110-0
|
Korea (Republic of)
|
Q210/1, AI9.1
|
2018-05-25 |
|
[ 261 ]
|
Proposed revision of preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM]
|
Korea (Republic of)
|
Q210/1, AI9.1
|
2018-05-25 |
|
[ 229 ]
|
Reply liaison statements from CISPR to ITU-R Study Group 1 Working Parties 1A and 1B on wireless power transfer
|
SG 1 Rapp. to CISPR on WPT issues
|
Q210/1, AI9.1
|
2017-11-17 |
|
[ 216 ]
|
Proposed revision of preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM]
|
Korea (Republic of)
|
Q210/1, AI9.1
|
2017-11-16 |
|
[ 215 ]
|
Proposal of methodology of studies on the impact to sound broadcasting services in the MF band from wireless power transmission systems for electric vehicles
|
Japan
|
Q210/1, AI9.1
|
2017-11-16 |
|
[ 214 ]
|
Proposal on preliminary draft revision of Recommendation ITU-R SM.2110-0
|
Japan
|
Q210/1, AI9.1
|
2017-11-16 |
|
[ 203 ]
|
Liaison statement to Working Party 1B (copy to Working Parties 1A, 5B, 5C, 6A and 7D for information) - Studies on "Wireless Power Transmission (WPT)"
|
WP 7A
|
Q210/1
|
2017-11-01 |
|
[ 201 ]
|
Liaison statement to ITU-R Study Group 1 and ITU-R Working Parties 1A and 1B - Wireless Power Transmission (WPT)
|
WP 6A
|
Q210/1
|
2017-10-23 |
|
[ 188 ]
|
Report of the work of the Rapporteur Group on Wireless Power Transmission
|
Rapporteur, RG-WPT
|
Q210/1
|
2017-06-13 |
|
[ 176 ]
|
Proposed modification of preliminary draft revision of Report ITU-R SM.2303-1
|
Korea (Republic of)
|
Q210/1
|
2017-06-06 |
|
[ 174 ]
|
Revision proposal of Report ITU-R SM.2303 to update information regarding the studies on the impact of wireless power transmission for electric vehicles
|
Japan
|
Q210/1
|
2017-06-05 |
|
[ 134 ]
|
Liaison statement to Working Parties 1A, 1B and their Rapporteur Group on WPT issues (copy for information to Working Parties 5A, 5B, 5C, 7A & 7D) - Developments on Wireless Power Transfer under Question ITU-R 210-3/1 and issue 9.1.6 of WRC-19
|
WP 6A
|
Q210/1
|
2017-04-03 |
|
[ 128 ]
|
Reply liaison statement to Working Party 7D (copy to Working Parties 1B, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transfer (WPT)
|
WP 1A
|
Q210/1
|
2016-12-13 |
|
[ 127 ]
|
Reply liaison statement to Working Party 6A (copy to Working Parties 1B, 1C, 5A, 5B, 5C, 7A and 7D) - Radio frequency ranges for wireless power transmission (WPT)
|
WP 1A
|
Q210/1
|
2016-12-13 |
|
[ 126 ]
|
Reply liaison statement to Working Party 5B (copied for information to Working Parties 1B, 5A, 5C, 6A, 7A and 7D) - Radio frequency ranges or wireless power transmission using technologies other than Radio Frequency Beam
|
WP 1A
|
Q210/1
|
2016-12-13 |
|
[ 121 ]
|
Reply liaison statement to Working Party 1A (copied for information to Working Parties 1B, 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam
|
WP 5B
|
Q210/1
|
2016-11-28 |
|
[ 94 ]
|
Proposal of a new Report ITU-R SM.[WPT.SPEC.MNGM] "Methodology for spectrum management of wireless power transmission"
|
Japan
|
Q210/1
|
2016-11-15 |
|
[ 93 ]
|
Studies on the impact of wireless power transmission for electric vehicles on broadcasting service
|
Japan
|
Q210/1, AI9.1
|
2016-11-15 |
|
[ 92 ]
|
Summary of studies on the impact of WPT for electric vehicle applications to radio communication services in Japan
|
Japan
|
Q210/1
|
2016-11-15 |
|
[ 85 ]
|
Some comments on the limits for WPT
|
Germany (Federal Republic of)
|
Q210/1, AI9.1
|
2016-11-09 |
|
[ 82 ]
|
Proposed frequency bands for wireless power transmission systems
|
Robert Bosch GmbH
|
Q210/1
|
2016-11-07 |
|
[ 70 ]
|
Liaison statement to Working Parties 1A, 1B, 1C, 5A, 5B, 5C, 7A and 7D - Radio frequency ranges for wireless power transfer (WPT)
|
WP 6A
|
Q210/1
|
2016-10-21 |
|
[ 63 ]
|
Liaison statement to ITU-R Working Party 1A (copy to Working Party 1B and RG-WPT) - Information on current status of study on Question ITU-R 210-3/1 "Wireless power transmission" in APT Wireless Group
|
Asia-Pacific Telecommunity
|
Q210/1
|
2016-09-16 |
|
[ 55 ]
|
Reply liaison statement to Working Party 5B (copied for information to Working Parties 1B, 5A, 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam relative to the services under the purview of WP 5B
|
WP 1A
|
Q210/1
|
2016-11-16 |
|
[ 54 ]
|
Reply liaison statement to Working Party 5A (copied for information to Working Parties 1B, 5B, 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam
|
WP 1A
|
Q210/1
|
2016-11-16 |
|
[ 53 ]
|
Liaison statement to Working Party 1B - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam
|
WP 1A
|
Q210/1
|
2016-11-16 |
|
[ 52 ]
|
Liaison statement to Working Parties 1B, 5A, 5B, 5C, 6A, 7A and 7D - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam
|
WP 1A
|
Q210/1
|
2016-06-16 |
|
[ 40 ]
|
Revision proposal of Report ITU-R SM.2303 to update information and to incorporate assessment process and methodology in studies on the impact of wireless power transmission systems applied to electric vehicles
|
Japan
|
Q210/1
|
2016-05-26 |
Resultats:51 documents Résultats :
1 -
2
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):