Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : SG04 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-R SG04  C 

UIT-R SG04

Services par Satellite

Resultats:20 documents
Contributions  [ Source: WP 4A ]   Documents / Contributions
 
Numéro 
Titre Source Date
[ 94 ]  
(Rev.1) 
Executive Report of the fifty-third meeting of Working Party 4A (Geneva, 27 June - 6 July 2023)     Chairman, WP 4A   2023-07-06
[ 93 ]  
(Rev.1) 
Draft new Recommendation ITU-R S.[METHOD] - Methodology for examining the compliance of an aeronautical earth station in motion (A-ESIM) communicating with geostationary space stations in the fixed-satellite service in the 27.5-29.5 GHz band with a set of pre-established pfd limits on the Earth's surface     WP 4A   2023-07-06
[ 92 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R S.1503-3 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in Article 22 of the Radio Regulations     WP 4A   2023-07-06
[ 91 ]  
 
Draft new Recommendation ITU-R S.[QV-METH-REF-LINKS] - Procedures for the evaluation of interference from any non-GSO system into a global set of the generic GSO reference links in the frequency bands 37.5-39.5 GHz (space-to-Earth), 39.5-42.5 GHz (space-to-Earth), 47.2-50.2 GHz (Earth-to-space) and 50.4-51.4 GHz (Earth-to-space)     WP 4A   2023-07-06
[ 90 ]  
 
Draft new ITU-R Small Satellite Handbook     WP 4A   2023-07-06
[ 87 ]  
 
Draft revision of Question ITU-R 270-/4 - Fixed-satellite service systems using very wideband spreading signals     WP 4A   2023-07-06
[ 86 ]  
 
Draft revision of Question ITU-R 231/4 - Sharing between networks of the fixed-satellite service using non-geostationary satellites and other networks of the fixed-satellite service     WP 4A   2023-07-06
[ 85 ]  
 
Draft revision of Question ITU-R 203-1/4 - The impact of using small antennas on the efficient use of the geostationary-satellite orbit     WP 4A   2023-07-06
[ 84 ]  
 
Draft revision of Question ITU-R 284/4 - Spectrum management issues related to the introduction of the broadcasting-satellite service (sound) in the frequency range 1-3 GHz     WP 4A   2023-07-06
[ 83 ]  
 
Draft revision of Question ITU-R 278/4 - Use of operational facilities to meet power flux-density limitation under Article 21 of the Radio Regulations     WP 4A   2023-07-06
[ 82 ]  
 
Draft revision of Question ITU-R 274/4 - Technical methods for improving the spectrum/orbit utilization     WP 4A   2023-07-06
[ 81 ]  
 
Draft revision of Question ITU-R 208/4 - Use of statistical and stochastic methods in evaluation of interference between satellite networks in the fixed-satellite service     WP 4A   2023-07-06
[ 62 ]  
 
Executive Report of the fifty-first and fifty-second meetings of Working Party 4A (Geneva, 11-20 May 2022 and 14-22 September 2022)     Chairman, WP 4A   2022-09-22
[ 59 ]  
 
Draft new Report ITU-R S.[BSS_SOUND] - Uplink interference considerations in the band 7 025-7 075 MHz for a broadcasting-satellite service (sound) in Region 2     WP 4A   2022-09-22
[ 42 ]  
 
Executive Report of the forty-ninth and fiftieth meetings of Working Party 4A (virtual meetings, 14-28 July 2021 and 27 October - 4 November 2021)     Chairman, WP 4A   2021-11-05
[ 40 ]  
 
Draft new Report ITU-R BO.[BSS Sharing Criteria] - Characteristics and effectiveness of frequency sharing criteria for the broadcasting-satellite service in Regions 1 and 3 subject to RR Appendix 30     WP 4A   2021-11-05
[ 39 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R S.1714 - Static methodology for calculating epfd(down) to facilitate coordination of very large antennas under Nos. 9.7A and 9.7B of the Radio Regulations     WP 4A   2021-11-05
[ 35 ]  
 
Reply liaison statement to Working Party 5A (copy for information to relevant parties) - Proposed suppression of the Compendium of ITU'S work on Emergency Telecommunications     WP 4A   2021-10-29
[ 19 ]  
 
Executive Report of the third meeting of Working Party 4A in the 2019-2023 Study cycle (virtual meeting, 22 February - 3 March 2021)     Chairman, WP 4A   2021-03-04
[ 11 ]  
 
Executive Report of the first and second meetings of Working Party 4A in the 2019-2023 study cycle (Virtual Meetings, 28-29 May, 28 October - 5 November)     Chairman, WP 4A   2020-11-06
Resultats:20 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2024-11-9