Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : WP1B : Contributions : 50 Ajoutés récemment -  Recherche de documents de réunion
   
[50]  Report on the second 2019-2023 meeting of Working Party 1B (e-meeting, 25-28 May 2021)

Format

Taille

Mise à disposition

English

Word  

32545 octets 2021-06-01 [50] Annex 5- Reply liaison statement to ITU-D Study Group 1 Question 4/1 on Economic aspects of spectrum

Word  

1476078 octets 2021-06-01 [50] Annex 4- Working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability

Word  

925214 octets 2021-06-01 [50] Annex 3- Working document towards a preliminary draft new Report ITU-R SM.[ASSESS-SPEC-EFFI-AND-ECON-VAL] - Assessment of Spectrum efficiency and economic value

Word  

32689 octets 2021-06-01 [50] Annex 2- Reply liaison statement to Asia-Pacific Telecommunity (APT) - APT Report on low power wide area network system for the Internet of Things based on non-cellular technologies

Word  

38644 octets 2021-06-02 [50] Annex 1- Working document towards a preliminary draft revision of Recommendation ITU-R SM.1896-1 - Frequency ranges for global or regional harmonization of short-range devices

Word  

48281 octets 2021-06-08 [50] - Report on the second 2020-2023 meeting of Working Party 1B (e-meeting, 25 May - 2 June 2021)
 

Document :

UIT-R WP1B  Contribution  50

Titre :

Report on the second 2019-2023 meeting of Working Party 1B (e-meeting, 25-28 May 2021)

Reçu le :

2021-05-31

Source :

Chairman, WP 1B

Disponibilité :

Réservé aux utilisateurs TIES [UIT-R]

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2021-09-20