Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 26 ]
|
Information on the preparation of texts for the draft CPM Report to WRC-27
|
Chair, CPM-27
|
|
2024-07-09 |
|
[ 25 ]
|
Reply liaison statement to Working Parties 5A, 5B, 5C, 6A and 7A - Revision of Report ITU-R SM.2449-0 and Recommendation ITU-R SM.2129-0 regarding wireless power transmission for mobile and portable devices
|
WP 1A
|
|
2024-07-03 |
|
[ 24 ]
|
Reply liaison statement to Working Party 7A - Wireless Power Transmission (WPT) for Electric Vehicles
|
WP 1A
|
|
2024-07-03 |
|
[ 23 ]
|
Reply to liaison statement to Working Party 5B (copied for information to Working Parties 5C, 6A and 7A) - WRC-27 agenda items 1.9
|
WP 3L
|
AI1.9
|
2024-06-13 |
|
[ 22 ]
|
Reply liaison statement to Working Party 4A (copy to Working Parties 5A, 5B, 5C, 7A, 7B AND 7C for information) - Relevant technical information to support studies under WRC-27 agenda item 1.2
|
WP 3M
|
AI1.2
|
2024-06-12 |
|
[ 21 ]
|
Reply liaison statement to Working Party 7B (copied to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Relevant technical information to support studies under WRC-27 agenda item 1.15
|
WP 3J
|
AI1.15
|
2024-06-12 |
|
[ 20 ]
|
Reply liaison statement to Working Party 7B (copy to Working Parties 1B, 3J, 4A, 4C, 5A, 5B, 5D, 7A, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.15
|
WP 5C
|
AI1.15
|
2024-05-29 |
|
[ 19 ]
|
Liaison statement to ITU-R Working Parties 3L, 5C, 6A and 7A (copy to ICAO for information) - Request for relevant technical information to support studies under WRC-27 agenda item 1.9 in order to review Appendix 26 of the Radio Regulations to support modernization of high-frequency spectrum use in the aeronautical mobile (OR) service
|
WP 5B
|
AI1.9
|
2024-05-28 |
|
[ 18 ]
|
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 5C, 7A, 7B and 7C) - Relevant technical information to support studies under WRC-27 agenda item 1.2
|
WP 5B
|
AI1.2
|
2024-05-21 |
|
[ 17 ]
|
Liaison statement to Working Parties 3M, 5B, and 7B (copy to Working Parties 5A, 5C, 7A and 7C for information) - Relevant technical information to support studies under WRC-27 agenda item 1.2
|
WP 4A
|
AI1.2
|
2024-05-13 |
|
[ 16 ]
|
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)
|
Chair, CCV
|
|
2024-04-22 |
|
[ 15 ]
|
Liaison statement for action to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D, and for information to Working Party 1B - Relevant technical information to support studies under WRC-27 agenda item 1.15
|
WP 7B
|
AI1.15
|
2024-03-27 |
|
[ 14 ]
|
Liaison statement to Working Parties 3M, 4A, 5A, 5B, 5C, 5D, 7A and 7B (copy to ICAO for information) - WRC-27 agenda item 1.19
|
WP 7C
|
AI1.19
|
2024-03-25 |
|
[ 13 ]
+Ann.1-3 |
Report of the meeting of Working Party 7A (Geneva, 19-22 March 2024)
|
Acting Chair, WP 7A
|
|
2024-03-22 |
|
[ 12 ]
|
Final list of participants - Working Party 7A (Geneva, 19-22 March 2024)
|
Director, BR
|
|
2024-03-22 |
|
[ 11 ]
|
List of documents issued (Documents 7A/1 - 7A/11)
|
BR, Study Groups Department
|
|
2024-03-19 |
|
[ 10 ]
|
Liaison statement to Working Party 5B (copy to Working Parties 3L, 5C and 7A) - Protection requirements for the HF broadcasting service relative to WRC-27 agenda item 1.9
|
WP 6A
|
AI1.9
|
2024-03-18 |
|
[ 9 ]
|
Liaison statement to ITU-T Study Group 15 (copy to ITU-T Study Group 5 and ITU-R Working Parties 1A, 5A, 5C, 6B, 7A, 7C and 7D for information) - Role of powerline telecommunications in home-networking
|
WP 6A
|
|
2024-03-18 |
|
[ 8 ]
|
Revision of the Chapter 3 of the ITU-R Handbook - Selection and use of precise frequency and time systems
|
Bureau International des Poids et Mesures (BIPM)
|
|
2024-03-06 |
|
[ 7 ]
|
Proposed preliminary draft revised Recommendation ITU-R TF.460-6 - Standard-frequency and time-signal emissions
|
France
|
Q236/7
|
2024-03-07 |
|
[ 6 ]
|
Proposed draft revision of the Handbook - Selection and use of precise frequency and time systems - Chapter 4 - Measurement techniques (Metrology)
|
France
|
|
2024-03-07 |
|
[ 5 ]
|
Proposed template for the working document towards a preliminary draft new Report ITU-R TF.[UTC_DISSEMINATION] - Content and structure of time signals to be disseminated by radiocommunication systems, including wired technologies
|
France
|
Q236/7
|
2024-03-07 |
|
[ 4 ]
|
Proposed draft revision of the Handbook - Selection and use of precise frequency and time systems
|
Germany
|
|
2024-03-06 |
|
[ 3 ]
|
Relevant information from CPM27-1 in preparation for WRC-27
|
Chair, SG 7
|
|
2024-02-23 |
|
[ 2 ]
|
Text from WRC-23 Plenary for the attention of the ITU-R Working Parties that are either responsible for or contributing to studies relevant to items of the WRC-27 agenda or the WRC-31 preliminary agenda
|
Director, BR
|
|
2024-01-30 |
|
[ 1 ]
|
Documents to be carried over from the 2019-2023 Study Period
|
WP 7A
|
|
2023-12-06 |
Resultats:26 documents
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):