Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG12 : Réunion 2002-05-27 : Documents Temporaires  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG12  TD-PLEN (2002-05-27) 

UIT-T SG12

Qualité de transmission de bout en bout des réseaux et terminaux

Période d'études 2001

Réunion  du 2002-05-27 au 2002-05-31

Lieu : Suisse [Genève]

Autres réunions : 2004-03-24  2003-09-22  2003-01-27  [ 2002-05-27 ]  2001-10-22  2001-02-19 

Resultats:37 documents
Documents Temporaires  (PLEN)  [ AI/Question: 12 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 37-PLEN ]  
 
Report of the Global Analysis Laboratory for the ITU-T Q.7/16 Wideband Characterization Test     Co-Rapporteurs for Q7/12   Q7/12   2002-05-31
[ 36-PLEN ]  
 
Impaired double talk performance due to the tandeming of signal processing functionalities     ITU-T SG 12   Q4/12   2002-05-31
[ 35-PLEN ]  
 
Final List of Participants     TSB   QALL/12   2002-05-31
[ 34-PLEN ]  
 
Comments on the presentation given on the new DMS from an active Delegate's point of view     EDH Co-ordinator   QALL/12   2002-05-31
[ 33-PLEN ]  
 
Revisions to TD 20 GEN     Chairman of WP2/12   Q8/12   2002-05-30
[ 32-PLEN ]  
 
Cooperation on measurement/monitoring of end-to-end Quality     ITU-T SG 12   Q1/12, Q16/12, Q9/12   2002-05-30
[ 31-PLEN ]  
 
Reply to the Liaison statement on Draft new Question Q.ETS/16 on Emergency Telecommunications Service     ITU-T SG 12   Q1/12   2002-05-30
[ 30-PLEN ]  
 
Liaison reply to SG 13 Chairman and TSAG on Cooperation with the IETF     ITU-T SG 12   Q1/12   2002-05-30
[ 29-PLEN ]  
 
Appointment of a Security Issues coordinator for SG 12     Chairman, SG 12   Q1/12   2002-05-30
[ 28-PLEN ]  
 
Progress report of Q1/12     Rapporteur for Q1/12   Q1/12   2002-05-30
[ 27-PLEN ]  
 
Draft Liaison reply to SG 11     Rapporteur for Q13/12   Q13/12   2002-05-30
[ 26-PLEN ]  
 
Draft Liaison reply to SG 16     Rapporteur for Q13/12   Q13/12   2002-05-30
[ 25-PLEN ]  
 
Draft Liaison reply to SG 13     Rapporteur for Q13/12   Q13/12   2002-05-30
[ 24-PLEN ]  
 
Draft Liaison reply to ITU-R WP8F     Rapporteur for Q13/12   Q13/12   2002-05-30
[ 23-PLEN ]  
 
Amendments to draft revised Recommendation P.561 published in D.58     Acting Rapporteur for Q16/12   Q16/12   2002-05-30
[ 22-PLEN ]  
 
Working Party 3/12 Summary meeting report     Chairman of WP3/12   Q12/12, Q13/12, Q14/12, Q16/12, Q2/12   2002-05-30
[ 21-PLEN ]  
 
Liaison statement on Call for model submission for the assessment of voice transmission quality from protocol analysis information in IP networks     ITU-T SG 12   Q16/12   2002-05-30
[ 20-PLEN ]  
 
Call for model submission for the assessment of voice transmission quality from protocol analysis information in IP networks     Acting Rapporteur for Q16/12   Q16/12   2002-05-30
[ 19-PLEN ]  
 
Executive summary of the Working Party 2/12 meeting     Chairman of WP2/12   Q10/12, Q11/12, Q7/12, Q8/12, Q9/12   2002-05-30
[ 18-PLEN ]  
 
Reply to LS on Preliminary ToR for MSC-VBR codec     ITU-T SG 12   Q7/12, Q9/16   2002-05-30
[ 17-PLEN ]  
 
Reply to LS on Wideband (7 kHz) speech coding chatacterisation phase of testing     ITU-T SG 12   Q7/12, Q7/16   2002-05-31
[ 16-PLEN ]  
 
Executive summary of WP1/12 meeting     Chairman of WP1/12   Q3/12, Q4/12, Q5/12, Q6/12   2002-05-30
[ 15-PLEN ]  
 
Proposal for revising ITU-T Recommendation P.57     Rapporteur for Q5/12   Q5/12   2002-05-29
[ 14-PLEN ]  
 
Status report on QoS Coordination     Rapporteur for Q15/12   Q15/12   2002-05-29
[ 13-PLEN ]  
 
Results of the Workshop on Multimedia Convergence held in Geneva, 12-15 March 2002     SG 12 Chairman   QALL/12   2002-05-24
[ 12-PLEN ]  
 
Response to Study Group 16 Liaison on Draft New Question Qets/16 for Emergency Telecommunication Services (ETS)     Study Group 4   Q1/12   2002-05-23
[ 11-PLEN ]  
 
Liaison to ITU-T Study Group 12 regarding ITU-T Recommendation G.1000     Study Group 17   Q15/12   2002-05-23
[ 10-PLEN ]  
 
Draft new Question Q.ets/16 on Emergency Telecommunications Services (ETS)     Study Group 16   Q1/12   2002-05-23
[ 9-PLEN ]  
 
Preparation of a new ITU Project on Next Generation Network by SG 13     Study Group 13   Q1/12   2002-05-23
[ 8-PLEN ]  
 
Liaison statement to ITU-T Study Group 12 regarding new Recommendation G.1000 "Communications Quality of Service: A Framework and Definitions"     Study Group 9   Q15/12   2002-05-23
[ 7-PLEN ]  
 
QoS issues in network harmonization of evolving IMT-2000 systems     Q6/SSG CYBER MEETING   Q15/12   2002-05-23
[ 6-PLEN ]  
 
Liaison to ITU-T Study Groups on cooperation with the IETF     TSAG   Q1/12   2002-05-23
[ 5-PLEN ]  
 
Liaison statement to ITU-T Study Groups on telecommunication reliability and security     TSAG   Q1/12   2002-05-23
[ 4-PLEN ]  
 
Liaison to ITU-T Study Groups on Electronic meetings     TSAG   Q1/12   2002-05-23
[ 3-PLEN ]  
 
Update on Electronic Document Handling     TSAG   Q1/12   2002-05-23
[ 2-PLEN ]  
 
Report of the meeting of the Informal Forum Summit     Director, TSB   Q1/12   2002-05-23
[ 1-PLEN ]  
 
Draft agenda and draft timetable of the meeting     Chairman SG 12   QALL/12   2002-05-23
Resultats:37 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-9-12