Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : NGN GSI : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T NGN GSI  C 

UIT-T NGN GSI

Initiative "Normes mondiales sur les réseaux NGN"

Période d'études 2005

Resultats:172 documents
Résultats :  1 - 2 - 3 - 4  - Suivant Next
Contributions  [ AI/Question: Q4/13 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 1301 ]  
 
Proposed Link between MPM and RACF     ETRI   Q4/13   2008-08-28
[ 1300 ]  
 
Proposed Use case and Comparison of Rc and Mu Requirements     ETRI   Q4/13   2008-08-28
[ 1298 ]  
 
Proposed Amendment to Y.2111 Rev.1 for Policy-based Charging and Control     ETRI   Q4/13, Q2/13   2008-08-27
[ 1289 ]  
 
The Rh reference point     China Telecom, CATR, ZTE Corp.   Q4/13   2008-08-27
[ 1283 ]  
 
Signaling Considerations for Y.2171 CAC Priority Levels     AT&T , Telcordia Technologies   Q4/13, Q5/11   2008-08-27
[ 1264 ]  
 
Example of implementation of RACF for CPN Gateways     China Telecocm, ZTE Corp.   Q4/13   2008-08-27
[ 1261 ]  
 
Proposed to add network security information handling in RACF     ZTE Corp.   Q15/13, Q4/13   2008-08-27
[ 1260 ]  
 
Proposed to add the procedure explanation for Figure 17 and 18 (Pull mode)     ZTE Corp.   Q4/13   2008-08-27
[ 1259 ]  
 
Proposed to add the procedure explanation for Figure 7 (Push mode)     ZTE Corp.   Q4/13   2008-08-27
[ 1252 ]  
 
Proposal for additional text on traffic conditioning     Huawei   Q4/13   2008-08-26
[ 1251 ]  
 
Proposal for additional text in the scope of Y.IPTV-TM     Huawei   Q4/13   2008-08-26
[ 1250 ]  
 
High level requirements of traffic management for the support of IPTV services     Huawei   Q4/13   2008-08-26
[ 1249 ]  
 
Proposal for structural change of Y.IPTV-TM     Huawei   Q4/13   2008-08-26
[ 1248 ]  
 
New sub clause on traffic classification in Y.IPTV-TM     Huawei   Q4/13   2008-08-26
[ 1247 ]  
 
Proposal for new sub clause on management plane mechanisms     Huawei   Q4/13   2008-08-26
[ 1243 ]  
 
Proposed to add the nomadism scenario in Y.RACF (Y.2111)     ZTE Corp.   Q4/13   2008-08-26
[ 1242 ]  
 
Proposed to add the description for resource control scenarios for nomadism     ZTE Corp.   Q4/13   2008-08-26
[ 1226 ]  
 
Proposal for adding functional descriptions of communications between RACF and MPM in RACF document     KDDI Corp. (KDDI R&D Labs)   Q4/13   2008-08-26
[ 1225 ]  
 
Modifications on inter-operator communications (clause 10) in Y.RACF rev. 1     KDDI Corp.   Q4/13   2008-08-26
[ 1153 ]  
 
Proposal for adding new interface (Rh') to Y.2111     Korea (Rep. of)   Q4/13   2008-08-25
[ 1152 ]  
 
Revised draft recommendation Y.enet for consent     Korea (Rep. of)   Q4/13   2008-08-25
[ 1143 ]  
 
Proposed modifications of Y.enet for text enhancements     Korea (Republic of)   Q4/13   2008-08-25
[ 1121 ]  
 
Proposal for initiating the study of Y.RACF Revision 2     Huawei Technologies   Q4/13   2008-08-25
[ 1113 ]  
 
A proposal to modification of Ethernet traffic grooming in Y.enet     ETRI   Q4/13   2008-08-22
[ 1106 ]  
 
Baseline document on Draft Recommendation Y.FAinX ?Requirements for Flow Aggregate Information Exchange in NGN?     ETRI   Q4/13   2008-08-22
[ 1105 ]  
 
Revised version of Y.RACF-CentralMPLS     ETRI   Q4/13   2008-08-22
[ 1104 ]  
 
Comments for Ri reference point and protocol     NTT Corporation   Q4/13, Q5/11   2008-08-22
[ 1070 ]  
 
A proposal to modification of frame encapsulation in the VPN in Y.enet     ETRI   Q4/13   2008-08-20
[ 1038 ]  
 
Proposed Modification of the Functional Architecture in Y.ngn-account-R2     ETRI   Q4/13, Q2/13   2008-05-04
[ 1015 ]  
 
Proposed Changes in Appendices in Y.mpm     ETRI   Q4/13   2008-05-04
[ 1014 ]  
 
Proposed Changes in the Clause 9 & 10 in Y.mpm     ETRI   Q4/13   2008-05-04
[ 1013 ]  
 
Proposed Changes in the Clause 7 and 8 in Y.mpm     ETRI   Q4/13   2008-05-04
[ 1012 ]  
 
Proposed Changes in the Clause 1, 2, 4, and 5 in Y.mpm     ETRI   Q4/13   2008-05-04
[ 991 ]  
 
Proposed modifications to section 7.7 of Y.enet     ETRI   Q4/13   2008-05-04
[ 989 ]  
 
Proposed modifications of Y.enet for text enhancements     ETRI   Q4/13   2008-05-04
[ 983 ]  
 
Updated version of Y.RACF-CentralMPLS     ETRI   Q4/13   2008-05-04
[ 961 ]  
 
Proposed change to the description of reporting mode     Huawei Technologies Co., Ltd.   Q4/13   2008-05-04
[ 957 ]  
 
Proposal for clarification of resource control scenarios for multicast in appendix VI     Huawei Technologies Co., Ltd.   Q4/13   2008-05-04
[ 956 ]  
 
Proposal for additional text on Resource Admission Control with mobility support     Huawei Technologies Co. Ltd   Q4/13   2008-05-04
[ 955 ]  
 
Proposal for additional text on consideration of home gateway static control mode     Huawei Technologies Co. Ltd   Q4/13   2008-05-04
[ 944 ]  
 
Addition of multicast unicast admission control example for reporting mode     Huawei Technologies Co., Ltd.   Q4/13   2008-05-04
[ 943 ]  
 
A resource control scenario for multicast     Huawei Technologies Co., Ltd.   Q4/13   2008-05-04
[ 935 ]  
 
The Rh' reference point     ZTE Corporation   Q4/13   2008-05-04
[ 934 ]  
 
The Procedure of the Distributed PD-FE Architecture     ZTE Corporation   Q4/13   2008-05-04
[ 933 ]  
 
The Functions of the HPE-FE     ZTE Corporation   Q4/13   2008-05-04
[ 930 ]  
 
Proposed network layer handover procedure for Y.RACF     ZTE Corporation   Q4/13   2008-05-04
[ 928 ]  
 
Proposed impact of security on QoS performance in Y.racf R2     ZTE Corporation   Q15/13, Q4/13   2008-05-04
[ 926 ]  
 
Proposal to move the PD-FE selection mechanism to a right section in Y.RACF (Y.2111)     ZTE Corporation   Q4/13   2008-05-04
[ 923 ]  
 
Proposal to add the clarification in Figure 20 in Y.RACF (Y.2111)     ZTE Corporation   Q4/13   2008-05-04
[ 918 ]  
 
Proposal for adding a mobility support scenario in RACF     ZTE Corporation   Q4/13   2008-05-04
Resultats:172 documents
Résultats :  1 - 2 - 3 - 4  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-10-19