Contributions
[ AI/Question: Q21/5 ] |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 522 ]
|
Proposal on write into the efficiency and no-load power requirements of China in L.UPA draft on Appendix II
|
China
|
Q21/5
|
2012-09-27 |
|
[ 521 ]
|
Contribution of Basic Configuration, Voltage/Current definition, Ripple and Ripple Noise Voltage measurement to the draft
|
China
|
Q21/5
|
2012-09-27 |
|
[ 517 ]
|
Interworking solutions between EPS and ICT equipment
|
Telecom Italia S.p.A.
|
Q21/5
|
2012-09-26 |
|
[ 516 ]
|
Proposal for a Recommendation on Universal power Adaptor for non-stationary use
|
Telecom Italia S.p.A.
|
Q21/5
|
2012-09-25 |
|
[ 515 ]
|
Press Release from ANEC (consumers' association) on connector for mobile charging
|
Telecom Italia S.p.A.
|
Q21/5
|
2012-09-25 |
|
[ 503 ]
(Rev.1) |
Battery Standardisation (Universal Design) - Study Input & Conclusions
|
United Kingdom
|
Q21/5
|
2012-09-25 |
|
[ 502 ]
|
Proposal to modify for L.CPS_stationary_draft V005
|
Japan
|
Q21/5
|
2012-09-25 |
|
[ 501 ]
|
Proposal to modify for L.CPS_stationary_draft V005 - Proposal to modify of DC output interface characteristics
|
Japan
|
Q21/5
|
2012-09-25 |
|
[ 500 ]
|
Proposal to modify for L.CPS_stationary_draft V005 - Proposal to modify of Scope and basic function
|
Japan
|
Q21/5
|
2012-09-25 |
|
[ 499 ]
|
Proposal on ripple noise voltage and measuring method of CPS in L.CPS_stationary
|
Japan
|
Q21/5
|
2012-09-25 |
|
[ 498 ]
|
Proposal on no-load power consumption of CPS in L.CPS_stationary
|
Japan
|
Q21/5
|
2012-09-25 |
|
[ 497 ]
|
Proposal on average conversion efficiency and 10% partial load conversion efficiency of CPS in L.CPS_stationary
|
Japan
|
Q21/5
|
2012-09-25 |
|
[ 496 ]
|
Joint industry response to contribution C421
|
Motorola Mobility LLC
|
Q21/5
|
2012-09-25 |
|
[ 492 ]
|
Information about an ICT&CC-WG activity of APT Standardization Program Forum
|
Korea (Rep. of)
,
Thailand
|
Q21/5
|
2012-09-25 |
|
[ 486 ]
|
Experimental results for draft Recommendation of L.rareMetals-measurement, "Measurement method to characterize rare metals of ICT goods"
|
Korea (Rep. of)
|
Q21/5
|
2012-09-25 |
|
[ 483 ]
|
Recent development on electronic waste (e-waste) and rare metals in Asia-Pacific Telecommunity
|
Korea (Rep. of)
,
Thailand
|
Q21/5
|
2012-09-25 |
|
[ 478 ]
(Rev.1) |
Proposed Study on environment protection and recycling solution for Li-ion and Li-ion polymer batteries for mobile phones
|
Research in Motion
|
Q21/5
|
2012-09-20 |
|
[ 477 ]
|
Handling of TD 1169 and a proposed way forward
|
Canada
|
Q21/5
|
2012-09-20 |
|
[ 475 ]
|
Proposal for assessment of environmental impact saving and rebound effect discussion
|
France Télécom Orange
|
Q21/5
|
2012-09-17 |
|
[ 472 ]
|
Proposals towards Q21/5 Recommendation on L.adapter phase2
|
A1 Telekom Austria AG
,
Alcatel-Lucent France
,
Belgacom
,
British Telecommunications Public Ltd. Co. (BT Plc)
,
Deutsche Telekom AG
,
France Télécom Orange
,
Freescale Semiconductor
,
Huawei Technologies Co. Ltd.
|
Q21/5
|
2012-03-30 |
|
[ 471 ]
|
L.adapter phase2 - proposals for electrical and mechanical characteristics
|
Telecom Italia S.p.A.
|
Q21/5
|
2012-03-30 |
|
[ 470 ]
|
L.adapter phase2 - why World needs a Common Power Supply standard now
|
Telecom Italia S.p.A.
|
Q21/5
|
2012-03-30 |
|
[ 464 ]
|
Structure of the Study on Due Diligence Guidelines for Metals Supply
|
Dem. Rep. of the Congo
|
Q21/5
|
2012-03-30 |
|
[ 463 ]
|
Contribution on L.adapter Phase2 Draft Recommendation
|
France Télécom Orange
|
Q21/5
|
2012-03-30 |
|
[ 460 ]
|
L.adapter phase2 - energy efficiency and no-load proposals
|
Telecom Italia S.p.A.
|
Q21/5
|
2012-03-30 |
|
[ 459 ]
|
L.adapter phase2 - efficiency versus load and equipment behaviour
|
Telecom Italia S.p.A.
|
Q21/5
|
2012-03-30 |
|
[ 458 ]
|
L.adapter phase2 - considerations on failures on present power supplies
|
Telecom Italia S.p.A.
|
Q21/5
|
2012-03-30 |
|
[ 446 ]
|
Prospective work items for recycling management of rare metals of ICT goods
|
Korea (Rep. of)
|
Q21/5
|
2012-03-30 |
|
[ 445 ]
|
Proposal for the initial draft Recommendation of L.rareMetals-measurement, "Measurement method to characterize rare metals of ICT goods"
|
Korea (Rep. of)
|
Q21/5
|
2012-03-30 |
|
[ 444 ]
|
Proposed requirements in L.adapter phase 2
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q21/5
|
2012-03-30 |
|
[ 443 ]
|
Proposed arrangement of scope and classifications for L.adapter Phase 2
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q21/5
|
2012-03-30 |
|
[ 442 ]
|
Proposed metrics for Power supply unit in L.M&M
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q21/5, Q17/5
|
2012-03-30 |
|
[ 433 ]
|
Contribution to L.adapter phase 2 - Power supply interface standardisation for portable devices
|
Nokia Siemens Networks GmbH & Co. KG
|
Q21/5
|
2012-03-29 |
|
[ 421 ]
|
Proposed structure of study report of lithium battery and proposal for a new work recommendation
|
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q21/5
|
2012-03-29 |
|
[ 415 ]
|
No Load Power and Ripple Voltage Test and Analysis for L.adapterPhase2
|
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q21/5
|
2012-03-29 |
|
[ 412 ]
(Rev.1) |
JOINT INDUSTRY INPUT TO ITU-T SG5 Q21/5 BATTERY SIZE STANDARDISATION STUDY
|
Intel Corporation
|
Q21/5
|
2012-03-28 |
|
[ 410 ]
(Rev.1) |
Scope of L.adapter Phase 2
|
United States
|
Q21/5
|
2012-03-28 |
|
[ 409 ]
|
Scope of L.1000 phase 2
|
Canada
|
Q21/5
|
2012-03-28 |
|
[ 405 ]
|
Leveraging and enhancing the ICT Environmental sustainability
|
Alcatel-Lucent France
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
,
Nokia Siemens Networks GmbH & Co. KG
,
Telecom Italia S.p.A.
|
Q23/5, Q22/5, Q21/5, Q19/5, Q18/5, Q17/5
|
2012-03-28 |
|
[ 402 ]
|
Proposed new work item on life-cycle approach for ICT equipment
|
United Nations Environment Programme
|
Q21/5
|
2012-03-28 |
|
[ 385 ]
|
Comments on CATR ID05 Ripple Voltage and No Load Power Test and Investigation for Adapters of ICT Devices
|
Research in Motion
|
Q21/5
|
2012-03-23 |
|
[ 384 ]
|
Comments on CATR Contribution ID02 Study on common mode noise immunity test for touch screen ICT devices
|
Research in Motion
|
Q21/5
|
2012-03-23 |
|
[ 377 ]
|
Proposals towards Q21/5 Recommendation on L.adapter phase2
|
Telecom Italia
,
Belgacom
,
Deutsche Telekom AG
,
France Telecom Orange
,
Swisscom
,
TDC
,
Telefónica SA
,
Telekom Austria Group
|
Q21/5
|
2011-09-09 |
|
[ 342 ]
|
A Method to provide recycling information of rare metals in ICT products
|
Korea (Rep. of)
|
Q21/5
|
2011-09-09 |
|
[ 337 ]
|
Requirement of EMC and Safety study for L.adapterPhase2 draft
|
Korea (Rep. of)
|
Q21/5
|
2011-09-09 |
|
[ 334 ]
|
Considerations of universal battery solution
|
China
|
Q21/5
|
2011-09-09 |
|
[ 333 ]
|
Survey and Proposal on L.adapter Phase2 draft
|
China
|
Q21/5
|
2011-09-09 |
|
[ 318 ]
|
Lignes directrices sur le devoir de diligence pour des chaines d'approvisionnement responsable en minerais provenant des zones de conflit ou zones à haut risque
|
Rép Dém Congo
|
Q21/5
|
2011-09-06 |
|
[ 316 ]
|
Proposal for additional text to be included in draft recommendation L.rareMetals, "A Method to provide recycling information of rare metals in ICT goods"
|
UNEP
|
Q21/5
|
2011-09-06 |
|
[ 299 ]
|
Living list item on Universal Li-ion battery solution for mobile phone and other ICT devices
|
Industry Canada
|
Q21/5
|
2011-09-06 |
Resultats:94 documents Résultats :
1 -
2
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):