Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG 11 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG 11  C 

UIT-T SG 11

Spécifications, protocoles et spécifications de test de signalisation

Période d'études 2009

Resultats:35 documents
Contributions  [ AI/Question: Q2/11 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 295 ]  
 
Proposal for updated description to clause 5 and editorial changes for Q.WebMidCall     Korea (Rep. of)   Q2/11   2012-05-29
[ 284 ]  
(Rev.1) 
Proposed detailed description to Clause 6 Signalling requirements for Q.WebMidCall     KT   Q2/11   2012-05-28
[ 265 ]  
 
Q.TS-IVR: proposed modification to the text     KT Corporation   Q3/11, Q2/11   2011-10-05
[ 264 ]  
 
Proposed new draft recommendation on "Signalling requirements for web based mid-call services in NGN"     KT Corporation   Q3/11, Q2/11   2011-10-05
[ 256 ]  
 
Proposed new draft Q.OIP/OIR and Q.CDIV     NEC Corporation , Nippon Telegraph and Telephone Corporation (NTT)   Q3/11, Q2/11   2011-10-03
[ 238 ]  
(Rev.1) 
Proposed modifications of Appendix II of Q Series Supplement 49 TRQ 2480     Canada   Q3/11, Q2/11, Q13/11   2011-09-21
[ 219 ]  
 
Proposed signalling flow for Communication Hold service feature in Q.centrexSig     China   Q3/11, Q2/11   2011-01-13
[ 218 ]  
 
Proposed signalling flow for Communication Forwarding service feature in Q.centrexSig     China   Q3/11, Q2/11   2011-01-13
[ 217 ]  
 
Proposed signalling flow for Communication Transfer service feature in Q.centrexSig     China   Q3/11, Q2/11   2011-01-13
[ 212 ]  
 
Proposed modifications on Signalling Requirements and Signalling Flows of TS-IVR     KT   Q3/11, Q2/11   2011-01-10
[ 199 ]  
 
Proposed modification of the scope of draft Recommendation Q.TS-IVR     KT   Q3/11, Q2/11   2011-01-06
[ 187 ]  
 
Proposed Call Server based signalling flow for IP Centrex service     CATR MIIT, China   Q3/11, Q2/11   2011-01-06
[ 186 ]  
 
Proposed protocol profile requirements for Q.IPCentrex     CATR MIIT, China   Q3/11, Q2/11   2011-01-06
[ 181 ]  
 
Proposed new draft recommendation on Signalling requirements and protocol profiles of touch-screen phone based IVVR services in NGN     KT   Q3/11, Q2/11   2010-04-16
[ 180 ]  
 
Introduction to touch-screen phone based IVVR communication services     KT   Q3/11, Q2/11   2010-04-16
[ 174 ]  
 
Proposal on protocol profiles for Q.centrexSig     China Telecom   Q3/11, Q2/11   2010-04-15
[ 173 ]  
 
Proposed signalling flow for Outgoing Communication service feature in Q.centrexSig     China Telecom   Q3/11, Q2/11   2010-04-15
[ 172 ]  
 
Proposed signalling flow for Incoming Communication service feature in Q.centrexSig     China Telecom   Q3/11, Q2/11   2010-04-15
[ 125 ]  
 
Rich Media Clarification (clause 5.1.4)     ZTE Corp.   Q3/11, Q2/11   2009-08-25
[ 115 ]  
 
Proposed signalling requirements for supporting the Communication Hold service feature in Q.centrexSig     China Telecom   Q3/11, Q2/11   2009-08-24
[ 114 ]  
 
Proposed signalling requirements for supporting the Communication Forwarding service feature in Q.centrexSig     China Telecom   Q3/11, Q2/11   2009-08-24
[ 113 ]  
 
Proposed signalling requirements for supporting the Communication Transfer service feature in Q.centrexSig     China Telecom   Q3/11, Q2/11   2009-08-24
[ 112 ]  
 
Proposed signalling requirements for supporting the Originating identification presentation service feature in Q.centrexSig     China Telecom   Q3/11, Q2/11   2009-08-24
[ 97 ]  
 
Proposed revision on Q.SupCRBT_CRT for alignment with Q.3610 and Q.3611     KT   Q3/11, Q2/11   2009-08-21
[ 52 ]  
 
Editorial changes on Q.CRBT     KT, ETRI   Q3/11, Q2/11   2009-01-09
[ 47 ]  
 
Proposed modifications to draft Q.CRT     Huawei Technologies Co., Ltd.   Q3/11, Q2/11   2009-01-09
[ 46 ]  
 
Proposed modifications to draft Q.CRBT     Huawei Technologies Co., Ltd.   Q3/11, Q2/11   2009-01-09
[ 45 ]  
 
Proposed modification to Interaction between networks of draft Q.CRBT     Huawei Technologies Co., Ltd.   Q3/11, Q2/11   2009-01-09
[ 44 ]  
 
Proposed additions to draft Recommendation Q.CRT     Huawei Technologies Co.,Ltd.   Q3/11, Q2/11   2009-01-09
[ 43 ]  
 
Proposed additions to draft Recommendation Q.CRBT     Huawei Technologies Co.,Ltd.   Q3/11, Q2/11   2009-01-09
[ 40 ]  
 
Revised draft of Supp.CRBT-CRT     ETRI, KT   Q3/11, Q2/11   2009-01-09
[ 31 ]  
 
Comparisons of ITU-T CRBT and 3GPP CAT     Korea (Republic of)   Q3/11, Q2/11   2009-01-09
[ 17 ]  
 
Revised draft recommendation of Q.CRT     ETRI   Q3/11, Q2/11   2009-01-09
[ 6 ]  
 
Proposed amendments for Q.CRBT     NTT Corporation   Q3/11, Q2/11   2009-01-06
[ 5 ]  
 
Proposals for CRBT Gateway model signalling flow     NTT Corporation   Q3/11, Q2/11   2009-01-06
Resultats:35 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-10-15