Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG15 : Réunion 2010-05-31 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG15  C (2010-05-31) 

UIT-T SG15

Transport network structures

Période d'études 2009

Réunion  du 2010-05-31 au 2010-06-11

Lieu : Suisse [Genève]

Autres réunions : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Resultats:25 documents
Contributions  [ Source: ZTE ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 1070 ]  
 
1588v2 transmission by OSC over OTN     FiberHome , CATR , ZTE   Q13/15, Q11/15   2010-05-21
[ 1066 ]  
 
Analysis of time synchronization performance using PTP in hybrid transport network     CMCC , CATR , ZTE   Q13/15, Q11/15   2010-05-21
[ 1065 ]  
 
Proposal of accelerating MTIE and TDEV mask study for time synchronization     CMCC , CATR , Huawei , ZTE   Q13/15   2010-05-21
[ 1064 ]  
 
Proposal of research on link asymmetry compensation for PTP     CMCC, ZTE, CATR   Q13/15   2010-05-21
[ 1063 ]  
 
Network limits reference model for time sync accuracy     CMCC , ZTE   Q13/15   2010-05-21
[ 1044 ]  
 
Proposal for ring topology discovery     ZTE   Q14/15   2010-05-20
[ 1043 ]  
 
Scenarios of mpls-tp discovery     ZTE   Q14/15   2010-05-20
[ 1042 ]  
 
Architecture of time synchronization using packet based method in G.8275     ZTE , CMCC   Q13/15   2010-05-20
[ 1041 ]  
 
Issues about metrics of network limits for time synchronization     ZTE , CATR , CMCC   Q13/15   2010-05-20
[ 1040 ]  
 
Field test of 1588v2 time sync based on physical layer frequency sync support     ZTE , CATR , CMCC   Q13/15   2010-05-20
[ 1039 ]  
 
Definition related to time/phase sync in G.8260     ZTE , CMCC   Q13/15   2010-05-20
[ 1038 ]  
 
Performance analysis of 1588v2 time/sync in field test     ZTE , CMCC   Q13/15   2010-05-20
[ 1037 ]  
 
1588v2 test results with different clock mode and field network     ZTE , CATR , CMCC   Q13/15   2010-05-20
[ 1036 ]  
(Rev.1) 
Consideration on Phase/Time synchronization over OTN     ZTE   Q13/15, Q11/15   2010-05-20
[ 1035 ]  
 
Proposal of Misconnection in Ring Protection     ZTE   Q9/15   2010-05-20
[ 1034 ]  
 
Consideration on LO ODUk Ring Protection     ZTE   Q9/15   2010-05-20
[ 1033 ]  
 
Comments on draft of G.ptneq generics     ZTE   Q9/15   2010-05-20
[ 1032 ]  
 
DNF at NR messages (G.8032)     ZTE   Q9/15   2010-05-20
[ 1031 ]  
 
SD scenarios (G.8031)     ZTE   Q9/15   2010-05-20
[ 1030 ]  
 
SD detection in G.8031     ZTE   Q9/15   2010-05-20
[ 1029 ]  
 
Rough estimation of system non-linear effects using non-linear phase in G.SUP 39     ZTE   Q6/15   2010-05-20
[ 1028 ]  
 
Filter phase ripple discussion for G.680     ZTE   Q6/15   2010-05-20
[ 1027 ]  
 
IPv6 Multicast filter     ZTE   Q2/15   2010-05-20
[ 1026 ]  
 
Proposal for Combo Reach Extender (CRE) device for G.987.re     ZTE   Q2/15   2010-05-20
[ 825 ]  
 
Requirement for multi stages multiplex/demultiplex configuration     China Telecom , China Mobile , China Unicom , ZTE   Q9/15, Q14/15, Q12/15   2010-05-17
Resultats:25 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-7-16