Contributions
[ Source: Ciena Corporation ] [ AI/Question: Q9/15 ] |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 2269 ]
|
Considerations re Multipoint Ethernet Connection Protection New Work Item
|
ADVA Optical Networking
,
AimValley BV
,
Alcatel-Lucent USA Inc.
,
Ciena Corporation
,
Cisco Systems, Inc.
,
Ericsson, Inc.
|
Q9/15
|
2012-08-28 |
|
[ 2058 ]
|
Misalignment among G.709, G.798 and G.872
|
Ciena Corporation
|
Q9/15, Q12/15, Q11/15
|
2012-08-24 |
|
[ 2056 ]
|
Generic considerations for protection resource assignments in G.smp
|
Alcatel-Lucent USA Inc.
,
Ciena Corporation
|
Q9/15
|
2012-08-24 |
|
[ 2054 ]
|
Requirements of Control Plane/Management Plane to support SMP
|
Ciena Corporation
|
Q9/15
|
2012-08-24 |
|
[ 2051 ]
|
Bi-directional SMP Operation and Signalling Flow Sequence
|
Ciena Corporation
|
Q9/15
|
2012-08-24 |
|
[ 2049 ]
|
Comments and clarifications on G.smp
|
Ciena Corporation
|
Q9/15
|
2012-08-24 |
|
[ 2047 ]
|
Use of CL-SNCG/S to simplify G.873.2 configurations
|
Ciena Corporation
|
Q9/15
|
2012-08-24 |
|
[ 2045 ]
|
Proposal to start work on OTN Performance Monitoring of Timing Adaptation processes
|
AT&T, Inc.
,
Ciena Corporation
|
Q9/15, Q14/15, Q13/15, Q11/15
|
2012-08-24 |
|
[ 1615 ]
(Rev.1) |
MSI Mismatch alarm issues connected with Auto PT enabled systems interconnecting new OTN equipment (PT=21) with old equipment (PT=20)
|
Ciena Corporation
|
Q9/15, Q11/15
|
2011-11-19 |
|
[ 1614 ]
(Rev.1) |
Protection switching at the E-NNI for multi-stage multiplexed OTN
|
Ciena Corporation
|
Q9/15
|
2011-11-19 |
|
[ 1613 ]
(Rev.1) |
Proposal to include 1+1 and 1:n bidirectional cases for the SNC/N protection subclass in Rec. G.873.1
|
Ciena Corporation
|
Q9/15
|
2011-11-19 |
|
[ 1612 ]
(Rev.1) |
G.873.1 Addition of CL-SNCG/S Protection
|
Ciena Corporation
|
Q9/15
|
2011-11-19 |
|
[ 1611 ]
(Rev.1) |
Proposed Corrections to Table 7-1 of G.873.1
|
Ciena Corporation
|
Q9/15
|
2011-11-19 |
|
[ 1609 ]
(Rev.1) |
Clarification of OTN Maintenance Signalling in G.798.1
|
Ciena Corporation
|
Q9/15
|
2011-11-19 |
|
[ 1594 ]
(Rev.1) |
Progress on G.8021.1
|
Ciena Corporation
|
Q9/15, Q12/15
|
2011-11-18 |
|
[ 1592 ]
(Rev.1) |
E-OTN work overlap among Questions
|
Ciena Corporation
|
Q9/15, Q12/15, Q10/15
|
2011-11-18 |
|
[ 1590 ]
(Rev.1) |
New Appendix B for G.8021.1
|
Ciena Corporation
|
Q9/15
|
2011-11-18 |
|
[ 1588 ]
(Rev.1) |
Input for G.8021.1 Clauses 8.1 and 8.2
|
Ciena Corporation
|
Q9/15
|
2011-11-18 |
|
[ 1585 ]
(Rev.1) |
Input for G.8021.1 Clause 8
|
Ciena Corporation
|
Q9/15
|
2011-11-18 |
|
[ 1582 ]
(Rev.1) |
Input for G.8021.1 Appendix A
|
Ciena Corporation
|
Q9/15
|
2011-11-18 |
|
[ 1492 ]
|
G.8032 ( Encoding Ring Identifier in R-APS Message DA to Improve Network Scaling
|
Ciena Corporation
|
Q9/15
|
2011-02-02 |
|
[ 757 ]
|
Hierarchal PBB / PBB-TE for E-OTN
|
Ciena Corporation
|
Q9/15
|
2010-04-28 |
|
[ 756 ]
|
E-OTN T-Tag Concerns
|
Ciena Corporation
|
Q9/15
|
2010-04-28 |
|
[ 755 ]
|
E-OTN Requirements Outline
|
Ciena Corporation
|
Q9/15
|
2010-04-28 |
|
[ 753 ]
|
Need For An E-OTN Requirements Document
|
Ciena Corporation
|
Q9/15
|
2010-04-28 |
|
[ 379 ]
|
Methods for Measuring Multipoint Services Availability
|
Cisco Ciena; China Telecom
,
AT&T
,
Broadcom Corporation
,
Ciena Corporation
,
Verizon
|
Q9/15, Q10/15
|
2009-09-10 |
|
[ 37 ]
|
Summary of WSON work
|
Ciena Corporation
|
Q9/15, Q14/15, Q12/15
|
2008-11-18 |
Resultats:27 documents
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):