Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG 16 : Réunion 2009-07-10 : Documents Temporaires  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG 16  TD-WP3 (2009-07-10) 

UIT-T SG 16

Terminaux, systèmes et applications multimédias

Période d'études 2009

Réunion  du 2009-07-10 au 2009-07-10

Lieu : Suisse [Genève]

Autres réunions : 2012-04-30  2011-11-21  2011-03-14  2010-07-19  2009-10-26  [ 2009-07-10 ]  2009-06-26  2009-01-27 

Resultats:25 documents
Documents Temporaires  (WP3)   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 67-WP3 ]  
(Rev.1) 
Draft new G.711 Amendment 1 "Pulse code modulation (PCM) of voice frequencies: new Annex A 'Lossless encoding of PCM frames" (for Consent)     Editor G.711 Amd.1   Q10/16   2009-07-10
[ 66-WP3 ]  
(Rev.1) 
Liaison statements produced by Q6/16     Rapporteur Q6/16   Q6/16   2009-07-10
[ 65-WP3 ]  
 
Draft "Request for Video Test Sequences for Enhanced Performance Video Coding" Work (for approval)     Rapporteur Q6/16   Q6/16   2009-07-10
[ 64-WP3 ]  
(Rev.1) +Add.1-2 
Draft new ITU-T G.711.0 (ex G.711-LLC) "Lossless compression of G.711 pulse code modulation" (for Consent)     Editor G.711-LLC   Q10/16   2009-07-10
[ 63-WP3 ]  
 
Draft LSs from WP3/16 to IETF and to ETSI DECT, HGI     Chairman WP3/16   Q10/16, Q9/16, Q8/16, Q7/16, Q6/16   2009-07-09
[ 62-WP3 ]  
(Rev.1) 
LSs from Q10/16     Rapporteurs Q10/16   Q10/16   2009-07-09
[ 61-WP3 ]  
 
Draft Processing Test Plan for ITU-T G.711 post-processing module     Rapporteurs Q10/16   Q10/16   2009-07-09
[ 60-WP3 ]  
 
Preparation of the STL Release 2009     Rapporteurs Q10/16   Q10/16   2009-07-09
[ 59-WP3 ]  
 
Processing Test Plan for the for the ITU-T Joint (G.718/G.729.1) SWB/Stereo extension Optimisation/Characterization phase     Rapporteurs Q10/16   Q10/16   2009-07-09
[ 58-WP3 ]  
 
ITU-T characterization phase of the superwideband extension (SWB) to ITU-T G.722/G.711.1: List of conditions and stereo scenarios     Rapporteurs Q10/16   Q10/16   2009-07-09
[ 57-WP3 ]  
+Add.1 
Draft new ITU-T Rec.G.729.1 Corrigendum 1 "G.729-based embedded variable bit-rate coder: An 8-32 kbit/s scalable wideband coder bitstream interoperable with G.729: Corrections to source code" (for Consent)     Editor G.729.1   Q10/16   2009-07-09
[ 56-WP3 ]  
 
Draft new Corrigendum 2 to Recommendation ITU-T G.718 (for Consent)     Editor G.718   Q9/16   2009-07-09
[ 55-WP3 ]  
 
Draft revised Technical Paper HSTP-MCTB (ex HSTP-MCTA) "Media coding toolbox for IPTV: Audio and video codecs" (for Approval)     Rapporteur Q6/16   Q6/16   2009-07-09
[ 54-WP3 ]  
(Rev.1) 
LS prepared by Q8/16 at its meeting in Geneva, 6-9 July 2009     Rapporteur Q8/16   Q8/16   2009-07-09
[ 53-WP3 ]  
 
Processing plan (V1.0) for GSAD selection phase     Rapporteur Q8/16   Q8/16   2009-07-09
[ 52-WP3 ]  
 
Performance evaluation plan (V1.0) for GSAD selection phase     Rapporteur Q8/16   Q8/16   2009-07-09
[ 51-WP3 ]  
 
Draft Terms of Reference of the Enhanced Performance Video Coding Joint Collaborative Team (EPVC JCT)     Rapporteur Q6/16   Q6/16   2009-07-09
[ 50-WP3 ]  
 
List of IPR information received between February and July 2009 for ITU-T WP3/16 Recommendations     TSB   Q10/16, Q9/16, Q8/16, Q7/16, Q6/16   2009-07-09
[ 49-WP3 ]  
 
List of Participants     TSB   Q10/16, Q9/16, Q8/16, Q7/16, Q6/16   2009-07-06
[ 48-WP3 ]  
(Rev.1) 
Report of Q10/16 Rapp. Group meeting (Geneva, 6-9 July 2009)     Rapporteurs Q10/16   Q10/16   2009-07-06
[ 47-WP3 ]  
(Rev.1) +Add.1 
Report of Q9/16 Rapp. Group meeting (Geneva, 6-9 July 2009)     Rapporteur Q9/16   Q9/16   2009-07-06
[ 46-WP3 ]  
(Rev.1) +Add.1 
Report of Q8/16 Rapp.Group meeting (Geneva, 6-9 July 2009)     Rapporteur Q8/16   Q8/16   2009-07-06
[ 45-WP3 ]  
(Rev.1) 
Report of Q6/16 Rapp. Group meeting (London and Geneva, 1-3 and 6-8 July 2009)     Rapporteur Q6/16   Q6/16   2009-07-06
[ 44-WP3 ]  
 
Report of Q6/16 Rapp. Group meeting (Yokohama, Japan, 15-18 April 2009)     Rapporteur Q6/16   Q6/16   2009-07-06
[ 43-WP3 ]  
 
Draft agenda and work plan for WP 3/16 (Geneva, 10 July 2009)     Chairman WP 3/16   Q9/16, Q8/16, Q7/16, Q6/16, Q10/16   2009-04-17
Resultats:25 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-10-18