Documents Temporaires
(GEN)
[ AI/Question: Q2/5 ] |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 784-GEN ]
|
Revised text for draft revised Recommendation ITU-T K.21 including comments received during the LC period
|
Co-rapporteur Q2/5
|
Q2/5
|
2018-09-21 |
|
[ 783-GEN ]
|
Revised text for draft revised Recommendation ITU-T K.20 including UK and Japan comments received during the LC period
|
Co-rapporteur Q2/5
|
Q2/5
|
2018-09-21 |
|
[ 782-GEN ]
|
Revised text and figures for draft revised Recommendation ITU-T K.44 including UK comments received during the LC period
|
Co-rapporteur Q2/5
|
Q2/5
|
2018-09-21 |
|
[ 760-GEN ]
|
Draft LS/o/r on the new version of the Home Network Transport (HNT) Standards Overview and Work Plan (reply to SG15 - LS 92 -E) [to ITU-T SG15] (reply to TD603)
|
ITU-T Study Group 5
|
Q4/5, Q2/5, Q1/5
|
2018-09-19 |
|
[ 757-GEN ]
|
Raw meeting notes of Q2/5 (Geneva, 11-21 September 2018)
|
Co-rapporteur Q2/5
|
Q2/5
|
2018-09-19 |
|
[ 748-GEN ]
|
Intra-system ports for K.45 (maximum cable length of 6 meters) - Agreed Adtran-NTT text from Q2/5 September 2018 meeting
|
Co-rapporteur Q2/5
|
Q2/5
|
2018-09-19 |
|
[ 747-GEN ]
|
Recommendation ITU-T K.rcd "Technical parameters for residual current operated protective devices with automatic reclosing feature for telecom applications" for consent
|
Co-rapporteur Q2/5 and Editor
|
Q2/5
|
2018-09-19 |
|
[ 740-GEN ]
|
New work item on Supplement to K.45 "Technical rationale of resistibility of telecommunication equipment installed in the access and trunk networks against lightning"
|
Co-rapporteur Q2/5
|
Q2/5
|
2018-09-18 |
|
[ 739-GEN ]
|
New work item on Supplement to K.20 "Technical rationale of resistibility of telecommunication equipment installed in a telecommunication centre against lightning"
|
Co-rapporteur Q2/5
|
Q2/5
|
2018-09-18 |
|
[ 738-GEN ]
|
New work item on Supplement to K.21 "Technical rationale of resistibility of telecommunication equipment installed in customer premises against lightning"
|
Co-rapporteur Q2/5
|
Q2/5
|
2018-09-18 |
|
[ 735-GEN ]
|
Baseline text for new K.Supplement on Internal DC powering interface surge testing factors
|
Co-rapporteur Q2/5
|
Q2/5
|
2018-09-18 |
|
[ 726-GEN ]
|
Proposal for a new work item on Supplement for K.20, K.21 and K.44 "Internal DC powering interface surge testing factors"
|
Co-rapporteur Q2/5
|
Q2/5
|
2018-09-17 |
|
[ 706-GEN ]
|
Proposed fourth draft of new Recommendation K.spdsafe "Guidance on safety relating to the use of surge protective devices and surge protective components in telecommunication terminal equipment"
|
Editor
|
Q2/5
|
2018-09-14 |
|
[ 684-GEN ]
|
Revised K.64 Base Text to align with new safety standards
|
Co-rapporteur Q2/5
|
Q2/5
|
2018-09-11 |
|
[ 660-GEN ]
|
Report of ACEC meeting held on 11-12 April 2018 in Paris (St. Denis) France
|
Liaison Rapporteur to ACEC
|
Q5/5, Q4/5, Q3/5, Q2/5, Q1/5
|
2018-09-05 |
|
[ 619-GEN ]
|
LS/i/r on collaboration (reply to ITU-T SG5-LS50) [from ITU-D SG1]
|
ITU-D Study Group 1
|
Q6/5, Q4/5, Q3/5, Q2/5
|
2018-06-20 |
|
[ 590-GEN ]
(Rev.1-3) |
Draft Report of Working Party 1/5 (Geneva, 11-21 September 2018)
|
Chairman WP1/5
|
Q5/5, Q4/5, Q3/5, Q2/5, Q1/5
|
2018-06-14 |
|
[ 582-GEN ]
(Rev.1) |
Draft Report of Question 2/5 (Geneva, 11-21 September 2018)
|
Co-rapporteur Q2/5
|
Q2/5
|
2018-06-14 |
|
[ 572-GEN ]
(Rev.1-4) |
Draft agenda for Question 2/5 meeting (Geneva, 11-21 September 2018)
|
Co-rapporteur Q2/5
|
Q2/5
|
2018-06-14 |
|
[ 569-GEN ]
(Rev.1-3) |
Draft agenda for Working Party 1/5 meeting (Geneva, 11-21 September 2018)
|
Chairman WP1/5
|
Q5/5, Q4/5, Q3/5, Q2/5, Q1/5
|
2018-06-14 |
Resultats:20 documents
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):