Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG 11 : Réunion 2019-10-16 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG 11  C (2019-10-16) 

UIT-T SG 11

Protocols and test specifications

Période d'études 2017

Réunion  du 2019-10-16 au 2019-10-25

Lieu : Suisse [Genève]

Autres réunions : 2021-12-01  2021-07-15  2021-03-17  2020-12-18  2020-12-04  2020-11-19  2020-07-22  2020-03-04  2019-06-26  2019-03-06  2018-10-31  2018-07-18  2017-11-08  2017-07-12  2017-02-06 

Resultats:36 documents
Contributions  [ Source: China ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 374 ]  
(Rev.1) 
Proposal for technical update and editorial improvements in draft Q.BNG-CFS     China Unicom   Q5/11   2019-10-03
[ 373 ]  
(Rev.1) 
Proposal for modifications and updates in Q.SFD     China Unicom   Q4/11   2019-10-03
[ 371 ]  
 
Proposal for modifications and updates of Q4/11 ToR for the next study period     China Unicom   QALL/11, Q4/11   2019-10-03
[ 358 ]  
 
Proposed modifications for ITU-T Q.Pro-DES "Protocol at interface between two distributed ENUM servers for IMS"     China Telecommunications Corporation   Q2/11   2019-10-02
[ 354 ]  
 
Proposal for adding control interface requirements and service flow in Q.BNG-CFS     Ministry of Industry and Information Technology (MIIT) (China)   Q5/11   2019-10-01
[ 353 ]  
(Rev.1) 
Proposal for ToR of Q5/11 in next study period     China Unicom , Ministry of Industry and Information Technology (MIIT) (China)   QALL/11   2019-10-01
[ 352 ]  
(Rev.1) 
Proposal for the ToR of Q2/SG11 for the next study period     Ministry of Industry and Information Technology (MIIT) (China)   QALL/11   2019-10-01
[ 351 ]  
 
Determination of ITU-T Q.DEN_IMS "Signalling architecture of distributed ENUM networking for IMS"     China Telecommunications Corporation   Q1/11   2019-10-01
[ 350 ]  
(Rev.1) 
Proposals on revision of Q3/11 ToR for the next study period     China Telecommunications Corporation   QALL/11   2019-10-01
[ 349 ]  
 
Modification of Chapter 8 for Q.SCC     China Unicom   Q4/11   2019-10-01
[ 348 ]  
 
Modification of Chapter 6.2 for Q.SD-DCI     China Unicom   Q4/11   2019-10-01
[ 347 ]  
 
New Question Proposal in SG11: Integrated Space-terrestrial Network Signalling and Protocols in New IP Networking     Huawei Technologies Co., Ltd. (China) , Tsinghua University (China)   QALL/11   2019-09-30
[ 346 ]  
 
Propose to add appendix for examples of signalling descriptions of Q.NGNe-O-SA     China Telecommunications Corporation   Q1/11   2019-09-30
[ 342 ]  
 
Propose to add descriptions of signalling requirements of Q.NGNe-O-SA     China Telecommunications Corporation   Q1/11   2019-09-30
[ 341 ]  
 
Propose to modify the ToR of Q1/11 for the next study period     China Telecommunications Corporation   QALL/11   2019-09-30
[ 331 ]  
 
Proposal to merge Q13/Q14 and update ToR of Q13/Q14 for the next study period     China Telecommunications Corporation   QALL/11, Q14/11, Q13/11   2019-09-29
[ 330 ]  
 
Proposal for new work item on interoperability testing of virtual switch     China Telecommunications Corporation   Q14/11   2019-09-29
[ 329 ]  
 
Abbreviations, interoperability testing requirements and service use case modification of Q.vbng-iop-reqts     China Telecommunications Corporation   Q14/11   2019-09-29
[ 328 ]  
 
A new work item on "Signaling and Protocol requirements for Service Function Chaining Load Balancing Tracert"     China Telecommunications Corporation , China Unicom   Q4/11   2019-09-29
[ 327 ]  
 
Modification of Chapter 8 of Q.telemetry-VBNS     China Telecommunications Corporation   Q4/11   2019-09-29
[ 326 ]  
 
Chapter 9 of Q.telemetry-VBNS     China Telecommunications Corporation   Q4/11   2019-09-29
[ 323 ]  
 
Propose new research for next study period: Protocols for the Control and Management of High Precision and Deterministic IP Network     Huawei Technologies Co., Ltd. (China)   QALL/11   2019-09-28
[ 322 ]  
 
Propose new research for next study period: the New Transport Layer (Layer-4) Protocols     Huawei Technologies Co., Ltd. (China)   QALL/11   2019-09-28
[ 321 ]  
 
New: Proposes to initiate a new work item on protocol for providing intelligent analysis services in IMT-2020 network     China Telecommunications Corporation   Q6/11   2019-09-28
[ 320 ]  
 
Q.BNG-PAC :Propose to update general aspects and functions     China Telecommunications Corporation   Q5/11   2019-09-28
[ 319 ]  
 
Q.INS-PM: Propose to add descriptions of reference points, service data collection flow and message format     China Telecommunications Corporation   Q6/11   2019-09-28
[ 316 ]  
 
Proposals for clause 9 "procedures for interconnection between trustable network entities" of Q.SR-trust     China Telecommunications Corporation   Q2/11   2019-09-27
[ 315 ]  
 
Proposal for updating descriptions of signalling procedures and signalling requirements for distributed ENUM networking in Q.DEN_IMS     China Mobile Communications Corporation   Q1/11   2019-09-27
[ 314 ]  
 
Proposal on adding the descriptions in abbreviations section and reference model section in Q.LiteIMS-SA     China Mobile Communications Corporation   Q1/11   2019-09-27
[ 313 ]  
 
Proposal for updating descriptions of requirements for signalling collecting, signalling network analyses and signalling network optimization in Q.VoLTE-SAO-req     China Mobile Communications Corporation   Q2/11   2019-09-27
[ 312 ]  
 
Proposal for updating scope, references, definitions, abbreviations and overview in Q.VoLTE-SAO-req     China Mobile Communications Corporation   Q2/11   2019-09-27
[ 311 ]  
 
Proposal on updating the signaling architecture part in section 7 of Q.LiteIMS-SA     China Mobile Communications Corporation   Q1/11   2019-09-27
[ 310 ]  
 
Proposal for initiating a new work item on framework and protocols for signalling network analyses and optimization in VoLTE     China Mobile Communications Corporation   Q2/11   2019-09-27
[ 309 ]  
(Rev.1) 
Proposal for updating terms of reference for Question 1/11 in study period 2021-2024     China Mobile Communications Corporation   Q1/11   2019-09-27
[ 305 ]  
(Rev.1) 
Propose to modify the ToR of Q6/11 for the next study period     China Telecommunications Corporation   QALL/11   2019-09-25
[ 302 ]  
(Rev.1) 
Proposal to add reference, definition, abbreviation and security requirement to Q.SQM     China Unicom   Q13/11   2019-09-24
Resultats:36 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-7-26