Contributions
[ AI/Question: Q2/15 ] |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 743 ]
|
TC-Layer-based distribution of the Target channel burst profile
|
Verizon Communication Corporation (United States)
|
Q2/15
|
2018-01-16 |
|
[ 739 ]
|
G.989.2: Statistical Model for Differential Optical Path Loss (DOPL)
|
ADTRAN (United States)
,
Calnex Solutions Limited (United Kingdom)
,
Verizon Communication Corporation (United States)
|
Q2/15
|
2018-01-16 |
|
[ 738 ]
(Rev.1) |
G.989.2: Reassessment of the OOC-PSD for Type A and Type B systems
|
ADTRAN (United States)
,
Calnex Solutions Limited (United Kingdom)
,
Verizon Communication Corporation (United States)
|
Q2/15
|
2018-01-16 |
|
[ 737 ]
|
G.989.2: Use of finite extinction ratio for inter-channel crosstalk power penalty
|
ADTRAN (United States)
,
Calnex Solutions Limited (United Kingdom)
,
Verizon
|
Q2/15
|
2018-01-16 |
|
[ 736 ]
|
G.989.2: Proposal to Develop Statistical Models
|
ADTRAN (United States)
,
Calnex Solutions Limited (United Kingdom)
,
Verizon Communication Corporation (United States)
|
Q2/15
|
2018-01-16 |
|
[ 735 ]
(Rev.1) |
G.989.2: Multiple Echo Temporal Model for Monte Carlo Simulation
|
ADTRAN (United States)
,
Calnex Solutions Limited (United Kingdom)
,
Verizon Communication Corporation (United States)
|
Q2/15
|
2018-01-16 |
|
[ 733 ]
|
Super PON
|
Futurewei Technologies US R&D Center (United States)
|
Q2/15
|
2018-01-16 |
|
[ 732 ]
|
G.989.2: N2 sensitivity at the S/R-CP point
|
ADTRAN (United States)
,
Calnex Solutions Limited (United Kingdom)
,
Verizon Communication Corporation (United States)
|
Q2/15
|
2018-01-16 |
|
[ 726 ]
|
Guidelines for TC-layer Evolution in PON Standards
|
ADTRAN (United States)
|
Q2/15
|
2018-01-16 |
|
[ 698 ]
|
Nokia - Transport bandwidths for new functional splits
|
Nokia Corporation
|
Q2/15
|
2018-01-16 |
|
[ 696 ]
|
Nokia - Radio interface mapping
|
Nokia Corporation
|
Q2/15
|
2018-01-16 |
|
[ 695 ]
|
Nokia - Comments on G.sup.5GP Draft_171218
|
Nokia Corporation
|
Q2/15
|
2018-01-16 |
|
[ 641 ]
|
Proposal for the study of 50G TDM-PON
|
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
China Unicom
,
FiberHome Technologies Group (China)
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Nokia Shanghai Bell Co. Ltd. (China)
,
ZTE Corporation (China)
|
Q2/15
|
2018-01-16 |
|
[ 621 ]
|
Proposal of cooperative DBA and cooperative interface for low-latency services in G.989.3 Amd2
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
,
Verizon Communication Corporation (United States)
|
Q2/15
|
2018-01-16 |
|
[ 615 ]
|
Attribute of RE reporting related ONU in G.988
|
ZTE Corporation (China)
|
Q2/15
|
2018-01-16 |
|
[ 610 ]
|
Concerns for quiet window of multi-ODN in G.9807.2
|
ZTE Corporation (China)
|
Q2/15
|
2018-01-16 |
|
[ 607 ]
|
Structure considerations for common TC specification
|
ZTE Corporation (China)
|
Q2/15
|
2018-01-16 |
|
[ 604 ]
|
Proposal of modifications to section 9 for G.sup.5GP
|
FiberHome Technologies Group (China)
|
Q2/15
|
2018-01-16 |
|
[ 584 ]
|
Bandwidth assignment and latency control in TDM-PON for 5G fronthaul transport
|
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
|
Q2/15
|
2018-01-16 |
|
[ 579 ]
(Rev.1) |
Proposed revision of Annex A.2 in G.RoF
|
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
,
Futurewei Technologies US R&D Center (United States)
,
National Institute of Information and Communications Technology (NICT)
|
Q2/15
|
2018-01-16 |
|
[ 578 ]
(Rev.1) |
Revisions of Appendix VII for G.RoF recommendation
|
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))
|
Q2/15
|
2018-01-16 |
|
[ 563 ]
|
Additional insights on modulation formats for G.sup.HSP
|
Nokia USA
|
Q2/15
|
2018-01-15 |
|
[ 559 ]
|
Proposal for new Appendix for 2:n Splitter Coexistence approach
|
Nokia USA
|
Q2/15
|
2018-01-15 |
|
[ 538 ]
|
G.984.5 Amd1: Optical parameter definition at S/Rm reference point in MPM
|
Huawei Technologies Co., Ltd. (China)
|
Q2/15
|
2018-01-15 |
|
[ 520 ]
|
Proposed Text for section 7.4 (Synchronization) of G.sup.5GP
|
China Telecommunications Corporation
|
Q2/15
|
2018-01-15 |
|
[ 515 ]
|
Proposals for G.sup.HSP on FEC
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q2/15
|
2018-01-15 |
|
[ 514 ]
|
BT requirements for PtP Eth Bidi
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q2/15
|
2018-01-15 |
|
[ 499 ]
|
Proposed Text for Section 11.6 of G.sup.5GP
|
China Unicom
|
Q2/15
|
2018-01-15 |
|
[ 444 ]
|
G.988: Enhanced Security Control ME
|
Broadcom Corporation (United States)
|
Q2/15
|
2018-01-14 |
|
[ 435 ]
(Rev.1) |
Proposed method for CEx isolation and directivity calculations in multi-interferer scenarios and application case
|
AT&T, Inc. (United States)
,
China Telecommunications Corporation
,
Telecom Italia S.p.A.
|
Q2/15
|
2018-01-12 |
|
[ 434 ]
|
Proposed revision of "RoF system supporting FOD detection system" in G.RoF
|
National Institute of Information and Communications Technology
|
Q2/15
|
2018-01-12 |
|
[ 433 ]
|
Proposed revision to Clause 6 in G.RoF
|
National Institute of Information and Communications Technology
|
Q2/15
|
2018-01-12 |
|
[ 404 ]
(Rev.1) |
Proposals for Higher Speed Point to Point (HS-PtP) recommendation structure and text
|
AT&T, Inc. (United States)
,
Orange (France)
|
Q2/15
|
2018-01-09 |
|
[ 403 ]
(Rev.1) |
Capacity requirements for 5G wireless fronthaul
|
AT&T, Inc. (United States)
,
British Telecommunications Public Ltd. Co. (BT Plc)
,
ZTE Corporation (China)
|
Q2/15
|
2018-01-08 |
|
[ 402 ]
|
OAM functions for 5G wireless fronthaul
|
British Telecommunications Public Ltd. Co. (BT Plc)
,
ZTE Corporation (China)
|
Q2/15
|
2018-01-08 |
Resultats:35 documents
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):