Contributions
[ AI/Question: Q2/15 ] |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 2862 ]
|
G.sup.slicing: General text on end-to-end network slicing
|
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies Switzerland
,
Maxlinear Inc (United States)
|
Q2/15
|
2021-11-23 |
|
[ 2860 ]
|
G.9804: Flex-rate PON Downstream
|
Nokia Corporation (Finland)
|
Q2/15
|
2021-11-23 |
|
[ 2858 ]
|
G.988: An issue with references to PON Recommendations
|
Maxlinear Inc (United States)
|
Q2/15
|
2021-11-23 |
|
[ 2830 ]
|
G.9806 Higher Speed BiDi options
|
Futurewei Technologies US R&D Center (United States)
|
Q2/15
|
2021-11-23 |
|
[ 2827 ]
(Rev.1) |
G.sup.slicing Slicing Framework
|
Futurewei Technologies US R&D Center (United States)
|
Q2/15, Q12/15, Q11/15
|
2021-11-23 |
|
[ 2826 ]
|
Clarification of scope of ITU-T Rec. Series G Supplement Slicing
|
Nokia Corporation (Finland)
,
Oki Electric Industry Company Ltd. (OKI) (Japan)
,
Vodafone Group Services Ltd (United Kingdom)
|
Q2/15
|
2021-11-23 |
|
[ 2819 ]
(Rev.1) |
Miscellaneous updates for ITU-T Rec. Series G Supplement Slicing
|
Nokia Corporation (Finland)
|
Q2/15
|
2021-11-23 |
|
[ 2818 ]
|
Proposal to new ITU-T G.Sup.XRP "Passive optical network supporting extended reality service"
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Nokia Shanghai Bell Co. Ltd. (China)
,
ZTE Corporation (China)
|
Q2/15
|
2021-11-23 |
|
[ 2817 ]
|
Proposal to new ITU-T G.Sup.eOLT " Enhanced optical line termination integrated with IT technology"
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Nokia Shanghai Bell Co. Ltd. (China)
,
ZTE Corporation (China)
|
Q2/15
|
2021-11-23 |
|
[ 2797 ]
|
WRP management Ad-hoc progress
|
China Telecommunications Corporation
,
Futurewei Technologies US R&D Center (United States)
,
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies Düsseldorf GmbH (Germany)
,
Maxlinear Inc (United States)
,
Orange (France)
,
ZTE Corporation (China)
|
Q2/15
|
2021-11-23 |
|
[ 2795 ]
|
General description of slicing requirements for PON
|
Vodafone Group Services Ltd (United Kingdom)
|
Q2/15
|
2021-11-23 |
|
[ 2778 ]
|
Considerations on the semi-active WDM architecture for G.9802
|
China Information Communication Technologies Group
,
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Yangtze Optical Fibre and Cable Joint Stock Limited Company (China)
,
ZTE Corporation (China)
|
Q2/15
|
2021-11-23 |
|
[ 2760 ]
|
Proposal of a new supplement on latency control and deterministic capability of ITU-T PON system
|
China Information Communication Technologies Group
,
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
Ministry of Industry and Information Technology (MIIT) (China)
,
Nokia Corporation (Finland)
,
ZTE Corporation (China)
|
Q2/15
|
2021-11-23 |
|
[ 2721 ]
|
CEx Penalty vs Crosstalk ratio Figure correction
|
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q2/15
|
2021-11-22 |
|
[ 2720 ]
|
HSP 50G Upstream Link Simulations
|
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q2/15
|
2021-11-22 |
|
[ 2719 ]
|
XG(S)-PON Out-of-Band PSD Specification
|
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q2/15
|
2021-11-22 |
|
[ 2701 ]
|
Proposal of requirements for slicing in PON-based optical access networks
|
China Mobile Communications Co. Ltd.
,
Huawei Technologies Co., Ltd. (China)
|
Q2/15
|
2021-11-22 |
|
[ 2665 ]
|
OMCI mutual authentication enhancement
|
Huawei Technologies Co., Ltd. (China)
|
Q2/15
|
2021-11-22 |
|
[ 2664 ]
|
XG(S)-PON OOB crosstalk on GPON system
|
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q2/15
|
2021-11-22 |
|
[ 2650 ]
|
Proposal on End-to-end Optical Network Slice Management
|
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies Düsseldorf GmbH (Germany)
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q2/15, Q14/15, Q12/15, Q11/15
|
2021-11-21 |
|
[ 2649 ]
|
Optical Network Slice: Review on Previous Work and Gap Analysis
|
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies Düsseldorf GmbH (Germany)
,
Ministry of Industry and Information Technology (MIIT) (China)
|
Q2/15, Q12/15, Q11/15
|
2021-11-21 |
|
[ 2642 ]
|
Slicing Use case in Industrial PON Scenario
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q2/15
|
2021-11-19 |
|
[ 2641 ]
|
Relationship between OMA, penalty, ER, and AVP for 50G downstream
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
|
Q2/15
|
2021-11-19 |
|
[ 2640 ]
|
CEx Isolation Equation Text for G.9805
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q2/15
|
2021-11-19 |
|
[ 2639 ]
(Rev.1) |
Proposed values for Isolation and Directivity for a generic 2-port CEx in G.9805
|
British Telecommunications Public Ltd. Co. (BT Plc) (United Kingdom)
,
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q2/15
|
2021-11-19 |
|
[ 2637 ]
|
Use case for multi-service slices of VNOs
|
ZTE Corporation (China)
|
Q2/15
|
2021-11-19 |
|
[ 2630 ]
|
Revision of Figure 7-7-a of optical coherent detection technique with multi-tone local light in G Suppl.55 Rev1
|
National Institute of Information and Communications Technology (NICT) (Japan)
|
Q2/15
|
2021-11-19 |
|
[ 2619 ]
|
G.Sup45 Rev proposed guidelines for OLT power savings
|
Orange (France)
|
Q2/15
|
2021-11-15 |
|
[ 2615 ]
|
Text proposal for Annex A of G.9803 Amd.2
|
KDDI Corporation (Japan)
,
National Institute of Information and Communications Technology (NICT) (Japan)
|
Q2/15
|
2021-11-12 |
|
[ 2604 ]
|
G.9804.3_20min_ Minutes of the 9th ad-hoc call on "50G DS PMD"
|
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies Düsseldorf GmbH (Germany)
,
Maxlinear Inc (United States)
,
Nokia Corporation (Finland)
,
Nokia USA (United States)
,
Orange (France)
,
ZTE Corporation (China)
|
Q2/15
|
2021-03-30 |
|
[ 2603 ]
(Rev.1) |
Reduced Dispersion Penalty at Lower Extinction Ratio in 50G PON Downstream Transmission
|
Futurewei Technologies US R&D Center (United States)
|
Q2/15
|
2021-03-30 |
|
[ 2602 ]
|
G.9804.3_20min _G.HSP 50G Downstream PMD Parameters
|
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q2/15
|
2021-03-30 |
|
[ 2601 ]
(Rev.1) |
G.9804.3_15min _G.HSP PMD OLT Tx TDEC Test Procedure
|
Huawei Technologies Düsseldorf GmbH (Germany)
,
Orange (France)
|
Q2/15
|
2021-03-30 |
|
[ 2600 ]
|
G.9804.2_5min: Provisioning for flexible FEC in the upstream
|
Maxlinear Inc (United States)
|
Q2/15
|
2021-03-30 |
|
[ 2598 ]
|
G.988_3min: Proposal for G.hsp minimum burst spacing attribute
|
Maxlinear Inc (United States)
|
Q2/15
|
2021-03-30 |
|
[ 2595 ]
|
G.9804.2_7min: Minimum spacing between upstream bursts
|
Maxlinear Inc (United States)
|
Q2/15
|
2021-03-30 |
|
[ 2594 ]
|
G.9804.2_5min: Valid range of maximum upstream burst size
|
Maxlinear Inc (United States)
,
Nokia Corporation (Finland)
|
Q2/15
|
2021-03-30 |
|
[ 2592 ]
|
G.988_5min: Proposal for G.9804 ME addressing the maximum ONU service rate
|
Maxlinear Inc (United States)
|
Q2/15
|
2021-03-30 |
|
[ 2591 ]
|
G.9804.3_5min: Ad hoc reports on jitter definition
|
Maxlinear Inc (United States)
|
Q2/15
|
2021-03-30 |
|
[ 2590 ]
|
G.9804.3_10min: Proposal for jitter specification
|
Futurewei Technologies US R&D Center (United States)
,
Maxlinear Inc (United States)
,
Nokia Corporation (Finland)
|
Q2/15
|
2021-03-30 |
|
[ 2584 ]
|
G.9804.2_15mins_Extensible PLOAM messaging scheme for capabilities reporting/feature setting
|
Nokia Corporation (Finland)
,
Nokia USA (United States)
|
Q2/15
|
2021-03-30 |
|
[ 2583 ]
|
G.9804.2_10mins_Modifications to working text on upstream FEC
|
Nokia Corporation (Finland)
,
Nokia USA (United States)
|
Q2/15
|
2021-03-30 |
|
[ 2582 ]
|
G.9804.3_10min_Flexible OLT X/S tolerance mask for G.hsp
|
Nokia USA (United States)
|
Q2/15
|
2021-03-30 |
|
[ 2577 ]
|
G.9804.3_10min _G.HSP PMD OLT Tx Eye Mask Test Equaliser
|
Huawei Technologies Düsseldorf GmbH (Germany)
,
Orange (France)
|
Q2/15
|
2021-03-30 |
|
[ 2573 ]
|
G.9804.3_10min _ Lower Bound for Extinction Ratio in 50G downstream
|
Huawei Technologies Co., Ltd. (China)
,
Huawei Technologies Düsseldorf GmbH (Germany)
|
Q2/15
|
2021-03-30 |
|
[ 2572 ]
|
G.9804.2_5min_PLOAM extensibility
|
Futurewei Technologies US R&D Center (United States)
|
Q2/15
|
2021-03-30 |
|
[ 2546 ]
|
Heterodyne Detection for G.9804.4 25 Gbps C-band Upstream
|
AEPONYX Inc. (Canada)
,
Calix Networks, Inc. (United States)
,
Verizon Communication Corporation (United States)
|
Q2/15
|
2021-03-30 |
|
[ 2544 ]
|
G.9804.1_20min _Slicing Requirements
|
China Telecommunications Corporation
,
Nokia Corporation (Finland)
,
Telecom Italia S.p.A. (Italy)
,
Vodafone Group Services Ltd (United Kingdom)
|
Q2/15
|
2021-03-30 |
|
[ 2533 ]
|
G.sup.5GBH_10min_ Backhaul capacity estimation model and calculation method for single station
|
China Information Communication Technologies Group
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Nokia Corporation (Finland)
,
Nokia Shanghai Bell Co. Ltd. (China)
|
Q2/15
|
2021-03-30 |
|
[ 2531 ]
|
G.sup.5GBH_10min_ Small cell architecture
|
China Information Communication Technologies Group
,
China Unicom
,
Huawei Technologies Co., Ltd. (China)
,
Nokia Corporation (Finland)
,
Nokia Shanghai Bell Co. Ltd. (China)
|
Q2/15
|
2021-03-30 |
Resultats:333 documents Résultats :
1 -
2 -
3 -
4 -
5 -
6 -
7
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):