Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG15 : Réunion 2024-07-01 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG15  C (2024-07-01) 

UIT-T SG15

Transport, access and home

Période d'études 2022

Réunion  du 2024-07-01 au 2024-07-12

Lieu : Canada [Montréal]

Autres réunions : 2023-11-20  2023-04-17  2022-09-19 

Resultats:39 documents
Contributions  [ AI/Question: Q3/15 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 1247 ]  
 
G.hn: Initial proposal for creating technical flyers     Maxlinear Inc (United States)   Q3/15   2024-06-18
[ 1219 ]  
 
G.fin DLL(G.9942): Proposed activation methodology without quiet window     China Information Communication Technologies Group   Q3/15   2024-06-18
[ 1202 ]  
 
G.uvs-XR: Contents in Clause 6.2     China Information Communication Technologies Group , China Unicom   Q3/15   2024-06-18
[ 1200 ]  
 
G.uvs-XR: Suggested contents on new technologies     China Unicom   Q3/15   2024-06-18
[ 1186 ]  
 
Proposal of G.WMCI conventions content for Co-EDCA     ZTE Corporation (China)   Q3/15   2024-06-18
[ 1185 ]  
 
Proposal of the implementation Co-SR function based on WMCI     ZTE Corporation (China)   Q3/15   2024-06-18
[ 1184 ]  
 
Suggested sublayer functional model of G.fin-XPHY     ZTE Corporation (China)   Q3/15   2024-06-18
[ 1183 ]  
 
Function of APC for G.fin-XDLL     China Telecommunications Corporation , ZTE Corporation (China)   Q3/15   2024-06-18
[ 1182 ]  
 
Protocol stack for 10G symmetric rate G.fin system     China Telecommunications Corporation , ZTE Corporation (China)   Q3/15   2024-06-18
[ 1160 ]  
 
Consideration on WMCI messages     Huawei Technologies Düsseldorf GmbH (Germany)   Q3/15   2024-06-18
[ 1148 ]  
 
Update the skeleton draft for G.wmci project     China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China)   Q3/15   2024-06-18
[ 1122 ]  
 
Proposal on the framework of enhanced in-premise network device     Huawei Technologies Co., Ltd. (China) , China Unicom   Q3/15   2024-06-18
[ 1096 ]  
 
WP1 joint: Technical paper Broadband access & in-premises network standard introduction     Huawei Technologies Co., Ltd. (China)   Q4/15, Q3/15, Q2/15, Q1/15   2024-06-18
[ 1095 ]  
(Rev.1) 
Follow-up for the WP1 roadmap technical paper     Huawei Technologies Co., Ltd. (China) , Huawei Technologies Düsseldorf GmbH (Germany)   Q4/15, Q3/15, Q2/15, Q1/15   2024-06-18
[ 1094 ]  
 
Discussion about the network architecture of G.sup.CMAFP     China Mobile Communications Co. Ltd. , China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q3/15, Q2/15   2024-06-18
[ 1092 ]  
 
Use case of higher layer management link for G.sup.CMAFP     China Mobile Communications Co. Ltd. , China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q3/15, Q2/15   2024-06-18
[ 1030 ]  
(Rev.1-2) 
A1 Proposal for the new G.9941 Amd1 to add a second G.fin technology option based on G.989 framing.     Maxlinear Inc (United States)   Q3/15   2024-06-17
[ 1022 ]  
 
Use case of performance and fault management in FTTR+PON system     China Mobile Communications Co. Ltd. , China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q3/15, Q2/15   2024-06-17
[ 1020 ]  
 
Proposal of XDLL architecture baseline text     China Telecommunications Corporation , ZTE Corporation (China)   Q3/15   2024-06-17
[ 1019 ]  
 
Proposal of FMCI message general syntax for G.fin-NM     China Unicom , Huawei Technologies Co., Ltd. (China) , Huawei Technologies Düsseldorf GmbH (Germany)   Q3/15   2024-06-17
[ 1017 ]  
(Rev.1) 
Propose to update the FTTR4B use case supplement     China Information Communication Technologies Group , China Telecommunications Corporation , China Unicom , Huawei Technologies Co., Ltd. (China) , Huawei Technologies Düsseldorf GmbH (Germany) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q3/15   2024-06-17
[ 1016 ]  
(Rev.1) 
Content proposal of PMD layer specifications for the second option of the 2.5G symmetric G.fin technology to be specified in G.9941 Amd1.     Maxlinear Inc (United States)   Q3/15   2024-06-17
[ 1015 ]  
 
Proposal of FMCI baseline set for G.fin-NM     China Unicom , Huawei Technologies Co., Ltd. (China) , Huawei Technologies Düsseldorf GmbH (Germany)   Q3/15   2024-06-17
[ 1013 ]  
(Rev.1) 
Propose to start the new supplement on Integrated Sensing and Communication of in-premises network     China Information Communication Technologies Group , China Unicom , Huawei Technologies Co., Ltd. (China) , Huawei Technologies Düsseldorf GmbH (Germany) , ZTE Corporation (China)   Q3/15   2024-06-17
[ 999 ]  
 
Propose editorial clean-up for G.suppl.FIP4H     Huawei Technologies Düsseldorf GmbH (Germany)   Q3/15   2024-06-17
[ 998 ]  
 
Detailed ME proposal for G.FIN.NM     China Unicom , Huawei Technologies Co., Ltd. (China)   Q3/15   2024-06-17
[ 996 ]  
 
The initial thoughts on the protocol of G.WMCI.     China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China)   Q3/15   2024-06-17
[ 966 ]  
 
Security Threats Proposal for FTTR-4B     Huawei Technologies Co., Ltd. (China)   Q3/15   2024-06-15
[ 956 ]  
 
G.hn: G9961 updates for the hierarchical bidirectional transmission     Maxlinear Inc (United States)   Q3/15   2024-06-14
[ 955 ]  
 
G.hn: G9960 pending updates for the hierarchical bidirectional transmission     Maxlinear Inc (United States)   Q3/15   2024-06-14
[ 954 ]  
 
Initial draft of Technical Paper section describing Q2/15 work     Futurewei Technologies Inc. (United States)   Q4/15, Q3/15, Q2/15, Q1/15   2024-06-14
[ 939 ]  
 
Enhanced RF Scan     Enedis (France)   Q3/15   2024-06-13
[ 938 ]  
 
Destination Address Set Enhancements     Enedis (France)   Q3/15   2024-06-13
[ 937 ]  
 
802.15.4 Cor1 Reference     Enedis (France)   Q3/15   2024-06-13
[ 936 ]  
 
Resetting Cluster Counter     Enedis (France)   Q3/15   2024-06-13
[ 935 ]  
 
RREQ Jittering Typo     Enedis (France)   Q3/15   2024-06-13
[ 916 ]  
 
Input for proposed technical paper on WP1/15 work     Huawei Technologies Düsseldorf GmbH (Germany)   Q4/15, Q3/15   2024-06-08
[ 915 ]  
 
G.hn: Restructuring Section 9 of GSTP-HNSG technical paper on the use of G.hn technology for smart grids applications     Enedis (France) , Maxlinear Inc (United States)   Q3/15   2024-06-07
[ 914 ]  
 
G.hn: General revision of GSTP-HNSG technical paper on the use of G.hn technology for smart grids applications     Enedis (France) , Maxlinear Inc (United States)   Q3/15   2024-06-07
Resultats:39 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-8-17