Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG15 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG15  C 

UIT-T SG15

Transport, access and home

Période d'études 2022

Resultats:22 documents
Contributions  [ Source: Calnex Solutions plc. (United Kingdom) ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 1196 ]  
 
Harmonization between G.781 and G.8264     Calnex Solutions plc. (United Kingdom) , Huawei Technologies Co., Ltd. (China)   Q13/15   2024-06-18
[ 1115 ]  
 
Sync in data centres     Calnex Solutions plc. (United Kingdom) , Meta Platforms, Inc. (United States) , Microchip Technology Inc. (United States) , Renesas Electronics Canada Limited   Q13/15   2024-06-18
[ 934 ]  
 
Long Term Transient Testing (G.8273)     Calnex Solutions plc. (United Kingdom)   Q13/15   2024-06-13
[ 933 ]  
 
Comment to the List of Synchronous Ethernet interfaces in G.8262     Calnex Solutions plc. (United Kingdom) , Huawei Technologies Co., Ltd. (China)   Q13/15   2024-06-13
[ 929 ]  
 
New Dataset member for nodeClass for G.8275.1 and G.8275.2     Calnex Solutions plc. (United Kingdom) , Juniper Networks (United States) , Keysight Technologies Deutschland GmbH (Germany) , Microchip Technology Inc. (United States) , Renesas Electronics Canada Limited   Q13/15   2024-06-12
[ 922 ]  
 
New Dataset member for clockMode for G.8275.1 and G.8275.2     Calnex Solutions plc. (United Kingdom) , Juniper Networks (United States) , Keysight Technologies Deutschland GmbH (Germany) , Microchip Technology Inc. (United States) , Renesas Electronics Canada Limited   Q13/15   2024-06-11
[ 919 ]  
 
Clarification on VLAN ID = 0 in ITU-T G.8275.1     Calnex Solutions plc. (United Kingdom) , Huawei Technologies Co., Ltd. (China) , Nokia USA (United States)   Q13/15   2024-06-10
[ 918 ]  
 
Restructuring G.8275     Calnex Solutions plc. (United Kingdom) , Huawei Technologies Co., Ltd. (China) , Microchip Technology Inc. (United States) , Nokia Corporation (Finland)   Q13/15   2024-06-10
[ 917 ]  
 
Synchronization for applications connected via the 5G system (G.8271.1)     Calnex Solutions plc. (United Kingdom)   Q13/15   2024-06-10
[ 801 ]  
 
Ubiquitous Precision Time (G.8271, G.8271.1)     Calnex Solutions plc. (United Kingdom) , Huawei Technologies Co., Ltd. (China)   Q13/15   2023-11-07
[ 655 ]  
 
Clarification in G.8275 Annex F     Calnex Solutions plc. (United Kingdom) , Telefon AB - LM Ericsson (Sweden)   Q13/15   2023-11-01
[ 625 ]  
 
PAM4 interfaces in the clock recommendations (G.8262, G.8273.2, G.8273.3)     Calnex Solutions plc. (United Kingdom)   Q13/15   2023-10-27
[ 624 ]  
 
FlexE interfaces in the clock recommendations (G.8273.2, G.8273.3)     Calnex Solutions plc. (United Kingdom)   Q13/15   2023-10-27
[ 623 ]  
 
Synchronization requirements for applications connected via the 5G system (G.8271, G.8271.1)     Calnex Solutions plc. (United Kingdom)   Q13/15   2023-10-27
[ 453 ]  
(Rev.1) 
G.8272 text for appendix: GNSS usage in PRTC     Calnex Solutions plc. (United Kingdom) , Deutsche Telekom AG (Germany) , Microchip Technology Inc. (United States)   Q13/15   2023-04-03
[ 349 ]  
 
G.8260 text modification     Calnex Solutions plc. (United Kingdom) , Deutsche Telekom AG (Germany) , Microchip Technology Inc. (United States)   Q13/15   2023-03-31
[ 330 ]  
 
Network limits in G.8271.1 based on enhanced syncE and clock class C [G.8271.1]     Calnex Solutions plc. (United Kingdom) , Huawei Technologies Co., Ltd. (China) , Nokia Corporation (Finland)   Q13/15   2023-03-28
[ 327 ]  
 
Option for Performance Monitoring (G.8275, G.8275.1, G.8275.2)     Calnex Solutions plc. (United Kingdom) , Telefon AB - LM Ericsson (Sweden)   Q13/15   2023-03-27
[ 326 ]  
 
Transient response due to long term rearrangement of physical layer frequency transport: cTE component [G.8273.2]     Calnex Solutions plc. (United Kingdom) , Huawei Technologies Co., Ltd. (China)   Q13/15   2023-03-22
[ 325 ]  
 
Transient response due to long term rearrangement of physical layer frequency transport: variable temperature [G.8273.2]     Calnex Solutions plc. (United Kingdom) , Huawei Technologies Co., Ltd. (China)   Q13/15   2023-03-22
[ 4 ]  
 
Corrections to Appendix VI of G.8273.2     Calnex Solutions plc. (United Kingdom)   Q13/15   2022-07-28
[ 3 ]  
 
SyncE Transient Testing in G.8273     Calnex Solutions plc. (United Kingdom)   Q13/15   2022-07-28
Resultats:22 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-10-15