Page 965 - 5G Basics - Core Network Aspects
P. 965

Transport aspects                                              2


            sending  a  R-TPS  message  and  shall  then  wait  for  reception  of  an  O-PMS  message.  The  FTU-R  shall
            acknowledge the O-PMS message by sending a R-PMS message and shall then wait for reception of an
            O-PMD message.
            The FTU-R shall acknowledge the O-PMD message by sending a R-PMD message and shall then wait for
            reception of an O-ACK message followed by an O-P-SYNCHRO 6 signal (transmitted six superframes after
            O-ACK). After reception of the O-P-SYNCHRO 6 signal, the FTU-R shall transition into showtime as described
            in clause 12.3.5.

            12.3.5  Transition to showtime
            The FTU-O shall transition to showtime starting from the symbol with index 0 of the downstream logical
            frame  immediately  following  the  O-P-SYNCHRO  6  signal.  The  FTU-R  shall  transition  to  showtime  one
            superframe  after  the  FTU-O  transitions  to  showtime,  starting  from  the  symbol  with  index  0 of the  first
            upstream logical frame. Before that transition, the FTU-R shall send R-IDLE. All DTU’s of the downstream
            logical frames of the first superframe following O-P-SYNCHRO 6 shall be dummy DTUs.
            The baseline bit-loading table of the NOI of the first downstream logical frame in showtime shall be the one
            specified  in  R-PMD  message.  The  baseline  bit-loading  table  and  the  gi  values  of  the  NOI  of  the  first
            upstream  logical  frame  in  showtime  shall  be  one  specified  in  O-PMD message.  The  baseline  bit-loading
            table of the DOI of the first downstream logical frame and the first upstream logical frame in showtime
            shall be, respectively, the same as for NOI (both bi and gi values). Those baseline bit-loading tables shall be
            indicated with SCCC=0 in the RMC. The FRA adjustment "no adjustment" shall be applied on the baseline
            bit-loading tables in the first logical frame of showtime. This adjustment shall have an FCCC equal to 0.

            If MB downstream is equal to 1, the configuration of the first downstream logical frame in showtime shall
            be TTRds=sds, TAds=0, TBUDGETds=sds. Otherwise, the configuration of the first downstream logical frame is
            indicated in the first downstream RMC message. The configuration of the first upstream logical frame in
            showtime shall be as specified in previously received downstream RMC messages. If no RMC messages are
            decoded correctly, the default value shall be TTRus=sus, TAus=0, TBUDGETus=sus.
            The transmit PSD of the first showtime logical frame in the downstream and upstream directions shall be
            STPSDds  and  STPSDus,  respectively  (NOI  symbol  position  only).  The  STPSDds  and  STPSDus  in  the  first
            showtime logical frame in the downstream and upstream directions shall use the tssi that was used during
            the channel analysis and exchange phase of initialization. The transmit PSD may be further adjusted using
            the corresponding OLR procedures (see clauses 13.2.1.1 and 13.2.2.1).
            The superframe count after transition into showtime and the probe sequences used during the initialization
            for sync symbols shall continue from initialization with no interruption.

            12.3.5.1   Establishment of DOI
            In the downstream, the establishment of DOI shall be in two steps:
            1)      The VCE/DRA initiates a TIGA procedure (see clause 13.2.2.1) with a TIGA command containing
                    settings for the DOI interval (this TIGA command may or may not contain settings for the NOI as
                    well).
            2)      After a successful completion of the TIGA procedure, transmission in the DOI may be enabled by
                    the VCE/DRA by setting TBUDGET > TTR.

            In the upstream, the establishment of DOI shall be in two steps:
            1)      The VCE/DRA initiates a SRA procedure (see clause 13.2.1.1) with an SRA command containing
                    settings for the DOI interval (this SRA command may or may not contain settings for the NOI as
                    well).

            2)      After a successful completion of the SRA procedure, transmission in the DOI may be enabled by
                    the VCE/DRA by setting TBUDGET > TTR.







                                                                                                         955
   960   961   962   963   964   965   966   967   968   969   970