Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : R23-WP5D Ajoutés récemment -  Recherche de documents de réunion
   
UIT-R R23-WP5D Documents de réunions
  Nb max de documents affichés/page:
Résultats: 51 documents
Result Page:  1 - 2  - Suivant
Numéro  Date Source Titre Questions 
  Numéro  Mise à disposition Taille    
 
[ ADM 40 ]  2024-06-24 WP 5D   Schedule for the 46th meeting of Working Party 5D, Geneva, 25 June- 2 July 2024     N/A  
  [ ADM 40 ] Revision 2 - English - Word 2024-06-28 [17:45]  57'439  octets  
 
[ TD 77 ]  2024-06-28 WP 5D   [Draft] Reply liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Parties 1C, 3J, 3K and 3M) - Considerations on draft Recommendation ITU-T K.DMEI of ITU-T SG5     N/A  
  [ TD 77 ]  - English - Word 2024-06-28 [17:13]  53'091  octets  
 
[ ADM 67 ]  2024-06-28 Chair, SWG WRC-27 AI 1.7   Draft agenda of the 3rd meeting of Sub-Working Group WRC-27 agenda item 1.7 Friday, 28 June 2024, from 1615 to 1730 hours (Geneva Time) (Room Popov)     N/A  
  [ ADM 67 ] Revision 1 - English - Word 2024-06-28 [14:44]  34'793  octets  
 
[ TD 65 ]  2024-06-27 SWG Frequency Arrangements   Draft revision of Recommendation ITU-R M.1036-7 - Frequency arrangements for implementation of the terrestrial component of International Mobile Telecommunications in the bands identified for IMT in the Radio Regulations     N/A  
  [ TD 65 ] Revision 1 - English - Word 2024-06-28 [13:54]  1'517'938  octets  
 
[ TD 70 ]  2024-06-27 SWG Sharing Studies   Annex 2.20.x to Working Party 5D Chair's Report - Detailed work plan for the development of preliminary draft new Report ITU-R M.[FS-IMT COORDINATION] - Coordination of stations in the fixed service with IMT stations in the frequency band 6 425-7 125 MHz     N/A  
  [ TD 70 ] Revision 1 - English - Word 2024-06-28 [10:41]  35'378  octets  
 
[ TD 69 ]  2024-06-27 SWG Sharing Studies   Annex 4.X to Working Party 5D Chair's Report - Working document towards a preliminary draft new Report ITU-R M.[FS-IMT COORDINATION] - Coordination of stations in the fixed service with IMT stations in the frequency band 6 425-7 125 MHz     N/A  
  [ TD 69 ] Revision 1 - English - Word 2024-06-28 [10:34]  38'261  octets  
 
[ TD 68 ]  2024-06-20 SWG Sharing Studies   Liaison statement to Working Party 7B - Possible coordination of space research service (deep space) stations operating in the band 7 145-7 190 MHz with IMT stations operating in the band 6 425-7 125 MHz     N/A  
  [ TD 68 ] Revision 1 - English - Word 2024-06-28 [10:29]  35'168  octets  
 
[ TD 67 ]  2024-06-27 SWG Sharing Studies   Annex 2.20.x to Working Party 5D Chair's Report - Detailed workplan for the development of preliminary draft new Report ITU-R M.[IMT-SRS] - Possible coordination of space research service (deep space) stations operating in the band 7 145-7 190 MHz with IMT stations operating in the band 6 425-7 125 MHz     N/A  
  [ TD 67 ] Revision 1 - English - Word 2024-06-28 [10:28]  38'128  octets  
 
[ TD 66 ]  2024-06-27 SWG Sharing Studies   Annex 4.X to Working Party 5D Chair's Report - Working document towards a preliminary draft new Report ITU-R M.[IMT-SRS] - Possible coordination of space research service (deep space) stations operating in the band 7 145-7 190 MHz with IMT stations operating in the band 6 425-7 125 MHz     N/A  
  [ TD 66 ] Revision 1 - English - Word 2024-06-28 [10:26]  45'117  octets  
 
[ TD 75 ]  2024-06-28 SWG Sharing Studies   Annex 4.x to Working Party 5D Chair's Report - Working document - Elements on mitigation measures between FSS and IMT in the frequency band 3 400-3 600 MHz     N/A  
  [ TD 75 ]  - English - Word 2024-06-28 [10:18]  3'020'509  octets  
 
[ TD 73 ]  2024-06-28 SWG Sharing Studies   Annex 4.X to Working Party 5D Chair's Report - Preliminary draft new Report ITU-R RA.[RAS-IMT-COMPAT-43-GHz] - Methodology for the coordination of IMT systems and stations of the radio astronomy service operating in the frequency band 42.5-43.5 GHz     N/A  
  [ TD 73 ]  - English - Word 2024-06-28 [10:11]  7'580'800  octets  
 
[ TD 76 ]  2024-06-28 WP 5D   Reply liaison statement to Working Party 4A - Progress on the work on elements on a working document towards a new Recommendation/Report ITU-R S.[MITIGATION MEASURES]     N/A  
  [ TD 76 ]  - English - Word 2024-06-28 [10:10]  35'078  octets  
 
[ TD 74 ]  2024-06-28 WP 5D   Reply liaison statement to Working Party 7D - Update to preliminary draft new Report ITU-R RA.[RAS-IMT-COMPAT-43-GHZ]     N/A  
  [ TD 74 ]  - English - Word 2024-06-28 [09:39]  39'924  octets  
 
[ ADM 66 ]  2024-06-28 Chair, SWG Sharing Studies   Draft agenda for the 4th and 5th meetings of Sub-Working Group Sharing Studies - Friday, 28 June 2024, Period 2 (1045-1200 hours) (Geneva time) following SWG Frequency Arrangements and Period 3 (1430-1545) (Geneva time) (Room Popov)     N/A  
  [ ADM 66 ]  - English - Word 2024-06-28 [09:16]  39'432  octets  
 
[ TD 72 ]  2024-06-28 WP 5D   [Draft] Liaison statement to Independent Evaluation Groups and "Nufront Proponent" - Update to IEGs engaged in the evaluation of the new candidate technology submission for "Revision 3" of Recommendation ITU-R M.2150 and "Nufront Proponent"     N/A  
  [ TD 72 ]  - English - Word 2024-06-28 [08:21]  35'973  octets  
 
[ ADM 65 ]  2024-06-28 Chair, SWG Radio Aspects   Agenda of the 7th and 8th meetings of Technology Aspects Sub-Working Group Radio Aspects - Friday, 28 June 2024 from 1430-1545 hours (Geneva time) and 1615-1730 Hours (Room C1 - Tower)     N/A  
  [ ADM 65 ]  - English - Word 2024-06-28 [08:39]  39'018  octets  
 
[ ADM 64 ]  2024-06-28 Chair, SWG Frequency Arrangements   Draft agenda of the 2nd (proposed final) meeting of Sub-Working Group Frequency Arrangements - Friday, 28 June 2024, from 1045 to 1200 hours, Geneva time (Room Popov (Tower) and virtual room)     N/A  
  [ ADM 64 ]  - English - Word 2024-06-28 [09:00]  39'815  octets  
 
[ ADM 63 ]  2024-06-27 Chair, SWG IMT-MSS   Draft agenda of the third meeting Sub-Working Group IMT-MSS - Friday, 28 June 2024, from 1745 to 1900 hours (Geneva time) (Room Popov)     N/A  
  [ ADM 63 ]  - English - Word 2024-06-27 [17:36]  59'119  octets  
 
[ ADM 62 ]  2024-06-27 Acting Chair, SWG IMT Unwanted Emissions   Draft agenda for Sub-Working Group IMT Unwanted Emissions - Friday, 28 June 2024, from 1430 to 1545 hours (Geneva time) (Room A, ITU Tower)     N/A  
  [ ADM 62 ]  - English - Word 2024-06-27 [16:51]  46'515  octets  
 
[ TD 71 ]  2024-06-27 WP 5D   [Draft] Reply liaison statement to CITS Expert Group on communications technology for automated driving towards work on "Requirements for merging automatically into congested lanes"     N/A  
  [ TD 71 ]  - English - Word 2024-06-27 [15:16]  32'951  octets  
 
[ ADM 61 ]  2024-06-27 Chair, SWG WRC-27 AI 1.7   Draft agenda of the 3rd meeting of Sub-Working Group WRC-27 agenda item 1.7 - Thursday, 27 June 2024, from 1545 to 1700 hours (Geneva Time) (Room Popov)     N/A  
  [ ADM 61 ]  - English - Word 2024-06-27 [12:16]  34'892  octets  
 
[ 240 ]  2024-06-27 CCT   Liaison statement to ITU-T Study Group 17 and ITU-R Working Parties 4B and 5D - Terms and definitions related to IMT-2020 (5G) technology     N/A  
  [ 240 ]  - English - Word 2024-06-27 [12:10]  39'717  octets  
 
[ TD 64 ]  2024-06-27 SWG Sharing Studies   Reply liaison statement to Working Parties 4C and 7B for WRC-27 agenda items 1.12, 1.13, 1.14, 1.15 - Technical and operational characteristics of HIBS for sharing and compatibility studies in preparation for WRC-27     N/A  
  [ TD 64 ]  - English - Word 2024-06-27 [11:53]  189'021  octets  
 
[ ADM 60 ]  2024-06-27 Chair, SWG Sharing Studies   Draft agenda for the 3rd meeting of Sub-Working Group Sharing Studies - Thursday, 27 June 2024, Period 5 (1715-1830 hours) (Geneva time) (Room Popov)     N/A  
  [ ADM 60 ]  - English - Word 2024-06-27 [11:05]  39'599  octets  
 
[ ADM 59 ]  2024-06-27 Acting Chair, SWG IMT Unwanted Emissions   Draft agenda for Sub-Working Group IMT Unwanted Emissions - Thursday, 27 June 2024, from 1400 to 1515 hours (Geneva time) (Room A, ITU Tower)     N/A  
  [ ADM 59 ]  - English - Word 2024-06-27 [09:59]  46'235  octets  
 
[ ADM 58 ]  2024-06-26 Chair, SWG IMT-MSS   Draft agenda of the third meeting Sub-Working Group IMT-MSS - Thursday, 27 June 2024, from 1045 to 1200 hours (Geneva time) (Room Popov)     N/A  
  [ ADM 58 ]  - English - Word 2024-06-26 [16:41]  59'306  octets  
 
[ ADM 47 ]  2024-06-25 Chair, SWG Specific Applications   Draft agenda of the 1st meeting of Sub-Working Group Specific Applications - Wednesday, 26 June 2024, 1045-1200 hours (Room A, ITU Tower) - Thursday, 27 June 2024, 1045-1200 hours (Room A, ITU Tower)     N/A  
  [ ADM 47 ] Revision 1 - English - Word 2024-06-26 [14:19]  34'684  octets  
 
[ TD 61 ]  2024-06-26 SWG IMT Specifications   Detailed work plan for a draft revision of Recommendation ITU-R M.2150-2 - Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications-2020 (IMT-2020)     N/A  
  [ TD 61 ]  - English - Word 2024-06-26 [11:11]  39'523  octets  
 
[ ADM 57 ]  2024-06-26 Chair, SWG WRC-27 AI 1.7   Draft agenda of the 2nd meeting of Sub-Working Group WRC-27 agenda item 1.7 - Wednesday, 26 June 2024, from 1545 to 1700 hours (Geneva Time) (Room Popov)     N/A  
  [ ADM 57 ]  - English - Word 2024-06-26 [11:16]  35'998  octets  
 
[ TD 62 ]  2024-06-26 SWG IMT Specifications   Detailed work plan for a draft revision of Recommendation ITU-R M.2012-6 - Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications-Advanced (IMT-Advanced)     N/A  
  [ TD 62 ]  - English - Word 2024-06-26 [11:01]  39'814  octets  
 
[ TD 63 ]  2024-06-26 SWG IMT Specifications   Meeting Report of SWG IMT Specifications     N/A  
  [ TD 63 ]  - English - Word 2024-06-26 [11:03]  37'808  octets  
 
[ ADM 56 ]  2024-06-26 Chair, SWG Circular   Draft Agenda for Sub-Working Group Circular - Wednesday, 26th June 2024, Period 5 (1715-1830 hours, Geneva time) Room C2 (ITU Tower) - Thursday, 27th June 2024, Period 3 (1400-1515 hours, Geneva time) Room C2 (ITU Tower) - Monday, 1st July 2024, Period 3 (1400-1515 hours, Geneva time) Room A (ITU Tower)     N/A  
  [ ADM 56 ]  - English - Word 2024-06-26 [08:46]  35'742  octets  
 
[ ADM 55 ]  2024-06-26 Chair, SWG Frequency Arrangements   Draft agenda of the 1st meeting of Sub-Working Group Frequency Arrangements - Wednesday, 26 June 2024, from 1715 to 1830 hours, Geneva time (Room Popov (Tower) and virtual room)     N/A  
  [ ADM 55 ]  - English - Word 2024-06-26 [08:27]  41'048  octets  
 
[ ADM 54 ]  2024-06-26 Chair, SWG Sharing Studies   Draft agenda for the 2nd meeting of Sub-Working Group Sharing Studies - Wednesday, 26 June 2024, Period 3 (1400-1515 hours) (Geneva time) (Room Popov)     N/A  
  [ ADM 54 ]  - English - Word 2024-06-26 [08:16]  35'016  octets  
 
[ ADM 53 ]  2024-06-26 Chair, SWG IMT-MSS   Draft agenda of the second meeting Sub-Working Group IMT-MSS - Wednesday, 26 June 2024, from 1045 to 1200 hours (Geneva time) (Room Popov)     N/A  
  [ ADM 53 ]  - English - Word 2024-06-26 [08:15]  59'774  octets  
 
[ 212 ]  2024-06-13 Egypt   List of assignments that the administration of Arab Republic of Egypt had notified to the bureau and that are within the frequency band subject to WRC-27 agenda item 1.13     AI1.13  
  [ 212 ]  - English - Word 2024-06-14 [13:02]  36'929  octets  
 
[ ADM 48 ]  2024-06-25 Chair, SWG IMT-MSS   Draft agenda of the 1st meeting Sub-Working Group IMT-MSS - Tuesday, 25 June 2024, from 1715 to 1830 hours (Geneva time) (Room Popov)     N/A  
  [ ADM 48 ] Revision 1 - English - Word 2024-06-25 [16:27]  59'286  octets  
 
[ ADM 52 ]  2024-06-25 Chair, SWG IMT Characteristics   Draft agenda for Sub-Working Group IMT Characteristics - Wednesday 26th June 2024, from 0900 to 1015 hours (Geneva time), (Room Popov) - Thursday 27th June 2024, from 0900 to 1015 hours (Geneva time) (Room Popov) - Thursday 27th June 2024, from 1400 to 1515 hours (Geneva time) (Room C1) - Monday 1st July 2024, from 0900 to 1015 hours (Geneva time) (Room Popov)     N/A  
  [ ADM 52 ]  - English - Word 2024-06-25 [16:49]  52'952  octets  
 
[ 222 ]  2024-06-13 India   Proposal for the working document towards a preliminary draft revision of Report ITU-R M.2480 - National approaches of some countries on the implementation of terrestrial IMT systems in bands identified for IMT     N/A  
  [ 222 ]  - English - Word 2024-06-14 [16:13]  193'765  octets  
 
[ ADM 38 ]  2024-06-24 Acting Chair, WP 5D   Agenda for the Opening Plenary of the 46th meeting of Working Party 5D, Tuesday, 25 June 2024, from 0900 to 1200 hours (Geneva time) (Room Popov)     N/A  
  [ ADM 38 ] Revision 1 - English - Word 2024-06-25 [13:52]  44'371  octets  
 
[ ADM 43 ]  2024-06-24 Chair, WG Spectrum Aspects & WRC Preparations   Draft agenda of the 1st meeting of Working Group Spectrum Aspects & WRC Preparations - Tuesday, 25 June 2024 (after the Opening Plenary) (Room Popov)     N/A  
  [ ADM 43 ] Revision 2 - English - Word 2024-06-25 [13:48]  55'493  octets  
 
[ ADM 49 ]  2024-06-25 Chair, SWG Evaluation   Draft agenda for the meeting of Sub-Working Group Evaluation - Wednesday, 26 June 2024, Periods 1 & 2 (0900-1015 hours and 1045-1200 hours) (Room C1) - Thursday, 27 June 2024, Period 1 (0900-1015 hours) (Room C1) - Friday, 28 June 2024, Period 2 (1045-1200 hours) (Room C1) - Monday, 1 July 2024, Period 2 (1045-1200 hours) (Room C2)     N/A  
  [ ADM 49 ]  - English - Word 2024-06-25 [13:40]  35'938  octets  
 
[ ADM 51 ]  2024-06-25 Acting Chair, SWG Sharing Studies   Draft agenda for the 1st meeting of Sub-Working Group Sharing Studies - Tuesday, 25 June 2024, Period 3 (1400-1515 hours) (Geneva time) (Room Popov)     N/A  
  [ ADM 51 ]  - English - Word 2024-06-25 [13:02]  40'520  octets  
 
[ ADM 44 ]  2024-06-25 Chair, SWG Radio Aspects   Agenda for 1st meeting of Technology Aspects, Sub-Working Group Radio Aspects - Tuesday, 25 June 2024 - 1545-1700 (Geneva time) (Room C1)     N/A  
  [ ADM 44 ]  - English - Word 2024-06-25 [09:46]  41'340  octets  
 
[ ADM 50 ]  2024-06-25 Chair, SWG WRC-27 AI 1.7   Draft agenda of the 1st meeting of Sub-Working Group WRC-27 agenda item 1.7 - Tuesday, 25 June 2024, from 1545 to 1700 hours (Geneva Time) (Room Popov)     N/A  
  [ ADM 50 ]  - English - Word 2024-06-25 [12:53]  35'457  octets  
 
[ ADM 46 ]  2024-06-25 Acting Chair, SWG Coordination   Draft agenda for the 1st and 2nd meetings of SWG Coordination - Wednesday, 25 June 2024, Period 3 (1400-1515 hours, Geneva time), Room C1 (after SWG IMT-Specifications) - Friday, 28 June 2024, Period 1 (0900-1015 hours, Geneva time), Room C1 (ITU Tower)     N/A  
  [ ADM 46 ]  - English - Word 2024-06-25 [10:01]  208'271  octets  
 
[ ADM 45 ]  2024-06-25 Chair, SWG IMT Specifications   Draft agenda for SWG IMT Specifications - Tuesday, 25 June 2024, Period 3 (1400-1515 hours, Geneva time) (Room C1, ITU Tower)     N/A  
  [ ADM 45 ]  - English - Word 2024-06-25 [09:39]  34'129  octets  
 
[ INF 3 ]  2024-06-25 BR Study Groups Department   Information for participants - Meetings of Working Party 5D #46 (Geneva, 25 June - 2 July 2024)     N/A  
  [ INF 3 ] Part 1 - English -  PowerPoint 2007 2024-06-25 [09:34]  4'395'967  octets  
  [ INF 3 ]  - English - Word 2024-06-25 [09:33]  4'884'510  octets  
 
[ 239 ]  2024-06-24 CITEL Rapporteur   Update Report on CITEL PCC.II activities     N/A  
  [ 239 ] Revision 1 - English - Word 2024-06-25 [08:59]  51'993  octets  
Résultats: 51 documents
Result Page:  1 - 2  - Suivant
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML Oui  
Formats doc pdf zip  + Autres formats
Langues (maximum 2) E F S A C R  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2024-06-28