Numéro |
Date
|
Source
|
Titre
|
Questions
|
|
Numéro |
Mise à disposition |
Taille
|
|
|
|
[ 142 ]
|
2024-09-26 |
Acting Chair, WP 7C
|
Report of the meeting of Working Party 7C (Almaty, Kazakhstan, 18-27 September 2024)
|
N/A
|
|
[ 142 ] Annex 24 - English - Word |
2024-10-08 [16:50]
|
46'369 octets |
Timeline for finalisation of the update of the "ITU/WMO Handbook on use of radio spectrum for meteorology"
|
|
[ 142 ] Annex 21 - English - Word |
2024-10-08 [16:49]
|
2'903'836 octets |
Working document toward a preliminary draft revision of Report ITU-R RS.2431-0 - Technical and operational characteristics of EESS (passive) systems in the frequency range 275-[ XXX] GHz
|
|
[ 142 ] Annex 19 - English - Word |
2024-10-08 [16:46]
|
48'719 octets |
Status of issues related to EESS (passive) above 86 GHz
|
|
[ 142 ] Annex 11 - English - Word |
2024-10-08 [16:44]
|
47'029 octets |
Proposed draft CPM text for WRC-27 agenda item 1.17
|
|
[ 142 ] Annex 14 - English - Word |
2024-10-08 [16:44]
|
18'773'187 octets |
Working document towards a preliminary draft new Report ITU-R RS.[SST MEASUREMENTS] - Spectrum for EESS (passive) sea surface temperature (SST) measurements
|
|
[ 142 ] Annex 27 - English - Word |
2024-10-08 [15:31]
|
34'660 octets |
Status of Questions assigned to Working Party 7C
|
|
[ 142 ] Annex 28 - English - Word |
2024-10-08 [13:07]
|
52'354 octets |
Review of Recommendations, Reports and Opinions under the purview of Working Party 7C
|
|
[ 142 ] Annex 23 - English - Word |
2024-10-08 [13:04]
|
1'039'952 octets |
Working document towards a preliminary draft revision of Recommendation ITU-R RS.515-5 - Frequency bands and bandwidths used for satellite passive remote sensing
|
|
[ 142 ] Annex 17 - English - Word |
2024-10-08 [13:03]
|
358'666 octets |
Working document towards a preliminary draft new Report ITU-R [1.18 - EESS]
|
|
[ 142 ] Annex 25 - English - Word |
2024-10-08 [12:03]
|
35'273 octets |
Terms of Reference for Working Party 7C Correspondence Group on updating the "ITU/WMO Handbook on use of radio spectrum for meteorology"
|
|
[ 142 ] Annex 29 - English - Word |
2024-10-08 [11:41]
|
48'326 octets |
List of documents issued (Documents 7C/41 - 7C/137)
|
|
[ 142 ] Annex 20 - English - Word |
2024-10-08 [11:10]
|
3'933'361 octets |
Working document toward a preliminary draft revision of Recommendation ITU-R RS.1861-1 - Typical technical and operational characteristics of Earth exploration-satellite service (passive) systems using allocations between 1.4 and 275 GHz
|
|
[ 142 ] Annex 26 - English - Word |
2024-10-08 [11:07]
|
34'855 octets |
List of contributors to the work on updating the "ITU/WMO Handbook on use of radio spectrum for meteorology"
|
|
[ 142 ] Annex 22 - English - Word |
2024-10-08 [10:16]
|
3'358'869 octets |
Preliminary draft new ITU-R Report - Analysis of interference received by EESS (passive) sensors in the 18.6-18.8 GHz band caused by surface water reflections
|
|
[ 142 ] Annex 18 - English - Word |
2024-10-08 [08:53]
|
38'404 octets |
Draft work plan for WRC-27 agenda item 1.18 on resolves 1 of Resolution 712 (WRC-23)
|
|
[ 142 ] Annex 16 - English - Word |
2024-10-07 [17:12]
|
36'576 octets |
Working document towards a preliminary draft new Report ITU-R RS.[EESS(PASSIVE)6-7 GHz] - EESS (passive) in the 6 425-7 250 MHz range
|
|
[ 142 ] Annex 15 - English - Word |
2024-10-07 [16:54]
|
36'885 octets |
Work plan for WRC-27 agenda item 1.19
|
|
[ 142 ] Annex 13 - English - Word |
2024-10-07 [16:48]
|
43'158 octets |
Working document towards a PDN Report on WRC-27 agenda item 1.19 - Studies on possible allocations to the Earth exploration-satellite service (passive) in the bands 4 200-4 400 MHz and 8 400-8 500 MHz
|
|
[ 142 ] Annex 4 - English - Word |
2024-10-07 [16:47]
|
1'702'596 octets |
Preliminary draft revision of Recommendation ITU-R RS.1166-5 - Performance and interference criteria for active spaceborne sensors
|
|
[ 142 ] Annex 12 - English - Word |
2024-10-07 [16:39]
|
1'903'660 octets |
Preliminary draft revision of Report ITU-R RS.2489-0
|
|
[ 142 ] Annex 7 - English - Word |
2024-10-07 [16:34]
|
132'157 octets |
Working document towards a preliminary draft new Recommendation ITU-R RS.[RXSW_PROTECT_CRITERIA] - Protection criteria of receive-only space weather sensors in the meteorological aids service (space weather)
|
|
[ 142 ] Annex 30 - English - PDF (acrobat) |
2024-10-07 [16:25]
|
145'627 octets |
Final list of participants
|
|
[ 142 ] Annex 10 - English - Word |
2024-10-07 [16:24]
|
40'086 octets |
Working document toward a preliminary draft new Report ITU-R RS.[SW_STUDIES] -
|
|
[ 142 ] Annex 9 - English - Word |
2024-10-07 [16:23]
|
35'310 octets |
Work paln for WRC-27 agenda item 1.17
|
|
[ 142 ] Annex 8 - English - Word |
2024-10-07 [16:10]
|
132'159 octets |
Element for protection criteria for SW sensors operating in frequency not listed in Resolution 682 (WRC-23)
|
|
[ 142 ] Annex 5 - English - Word |
2024-10-07 [15:41]
|
36'432 octets |
Elements of working document towards a preliminary draft new Report ITU-R - Compatibility study between spaceborne EESS (active) SAR systems and radiolocation service
|
|
[ 142 ] Annex 6 - English - Word |
2024-10-07 [15:40]
|
32'135 octets |
Working document towards a preliminary draft new Report ITU-R - Typical technical and operational characteristics of spaceborne
active sensors in the band 3 000-3 400 MHz
|
|
[ 142 ] Annex 3 - English - Word |
2024-10-07 [15:37]
|
513'764 octets |
Preliminary draft revision of Recommendation ITU-R RS.2105-2 - Typical technical and operational characteristics of Earth exploration-satellite service (active) systems using allocations between 432 MHz and 238 GHz
|
|
[ 142 ] Annex 1 - English - Word |
2024-10-07 [15:32]
|
147'919 octets |
Preliminary draft new Report ITU R RS.[AGG_EESS_SAR-RNSS] - Examples of evaluating and resolving interference into receiving earth stations in the radionavigation-satellite service (space-to-Earth) from multiple spaceborne synthetic aperture radar sensors in the Earth exploration-satellite (active) service in the 1 215-1 300 MHz band
|
|
[ 142 ] Annex 2 - English - Word |
2024-10-07 [15:19]
|
64'750 octets |
Preliminary draft revision of Recommendation ITU-R RS.577-7 - Frequency bands and required bandwidths used for spaceborne active sensors operating in the Earth exploration-satellite (active) and space research (active) services
|
|
[ 156 ]
|
2024-10-08 |
WP 7B
|
Liaison statement to Working Party 7C on WRC-27 agenda item 1.17
|
AI1.17
|
|
[ 156 ] - English - Word |
2024-10-08 [11:52]
|
43'175 octets |
|
|
[ 155 ]
|
2024-10-08 |
WP 7B
|
Liaison statement to Working Party 7C on WRC-27 agenda item 1.19
|
AI1.19
|
|
[ 155 ] - English - Word |
2024-10-08 [11:49]
|
32'636 octets |
|
|
[ 154 ]
|
2024-09-30 |
WP 7B
|
Reply liaison statement to ITU-R Working Party 3J (copied for information to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Response to Working Party 3J questions related to WRC-27 agenda item 1.15
|
AI1.15
|
|
[ 154 ] - English - Word |
2024-10-02 [10:01]
|
36'511 octets |
|
|
[ 153 ]
|
2024-09-30 |
WP 7B
|
Liaison statement to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D - Report on progress of activities relating to WRC-27 agenda item 1.15
|
AI1.15
|
|
[ 153 ] - English - Word |
2024-09-30 [15:20]
|
35'688 octets |
|
|
[ 152 ]
|
2024-09-30 |
WP 7D
|
Reply liaison statement to Working Party 1A (copy to Working Parties 4C, 5A, 5D, 7C for information) - Beam Wireless Power Transmission (WPT)
|
N/A
|
|
[ 152 ] - English - Word |
2024-09-30 [15:12]
|
43'869 octets |
|
|
[ 151 ]
|
2024-09-30 |
WP 7D
|
Reply liaison statement to Working Party 4A (copy to Working Parties 5A, 5C and 7C for information) - WRC-27 agenda item 1.3
|
AI1.3
|
|
[ 151 ] - English - Word |
2024-09-30 [16:24]
|
200'414 octets |
|
|
[ 150 ]
|
2024-09-30 |
WP 7D
|
Reply liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B and 7C for information) - Relevant technical information to support studies under WRC-27 agenda item 1.7
|
AI1.7
|
|
[ 150 ] - English - Word |
2024-09-30 [15:01]
|
45'055 octets |
|
|
[ 149 ]
|
2024-09-30 |
WP 7B
|
Reply liaison statement to Working Party 5D on WRC-27 agenda item 1.7 (copy to Working Parties 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7C and 7D)
|
AI1.7
|
|
[ 149 ] - English - Word |
2024-09-30 [14:55]
|
154'986 octets |
|
|
[ 148 ]
|
2024-09-30 |
WP 7D
|
Reply liaison statement to Working Party 5C (copy to Working Parties 4A, 4B, 4C, 5A, 5B, 6A and 7C for information) - Studies under WRC-27 agenda item 1.10
|
AI1.10
|
|
[ 148 ] - English - Word |
2024-09-30 [16:20]
|
46'936 octets |
|
|
[ 147 ]
|
2024-09-30 |
WP 7D
|
Reply liaison statement to Working Party 7B (copy for information to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7A and 7C) - Relevant technical information to support studies under WRC-27 agenda item 1.15
|
AI1.15
|
|
[ 147 ] - English - Word |
2024-09-30 [15:52]
|
503'916 octets |
|
|
[ 146 ]
|
2024-09-27 |
WP 7D
|
Reply liaison statement to Working Party 5B (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5C,and 7C for information) - Relevant technical information to support studies in preparation of WRC-27 agenda item 1.8
|
AI1.8
|
|
[ 146 ] - English - Word |
2024-09-30 [13:35]
|
461'990 octets |
|
|
[ 145 ]
|
2024-09-27 |
WP 7D
|
Reply liaison statement to Working Party 4A (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 7B and 7C for information) - Information to support the studies under WRC-27 agenda item 1.1
|
AI1.1
|
|
[ 145 ] - English - Word |
2024-09-27 [16:29]
|
50'213 octets |
|
|
[ 144 ]
|
2024-09-27 |
WP 7D
|
Reply liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C for information) - Technical information to support the studies for WRC-27 agenda items 1.12 and 1.13
|
AI1.12, AI1.13
|
|
[ 144 ] - English - Word |
2024-09-27 [17:13]
|
49'980 octets |
|
|
[ 143 ]
|
2024-09-27 |
WP 7D
|
Reply liaison statement to Working Party 4C (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 7B and 7C for information) - WRC-27 agenda item 1.11
|
AI1.11
|
|
[ 143 ] - English - Word |
2024-09-27 [16:42]
|
43'730 octets |
|
|
[ TD 39 ]
|
2024-09-23 |
SWG 7C-2
|
Proposed draft CPM Text for WRC-27 agenda item 1.17
|
AI1.17
|
|
[ TD 39 ] - English - Word |
2024-09-22 [08:33]
|
46'547 octets |
|
|
[ 141 ]
|
2024-09-26 |
Director, BR
|
Final list of participants - Working Party 7C (Almaty, Kazakhstan, 18-27 September 2024)
|
N/A
|
|
[ 141 ] - English - PDF (acrobat) |
2024-09-27 [14:44]
|
145'627 octets |
|
|
[ ADM 10 ]
|
2024-09-25 |
Acting Chair, WP 7C
|
Draft agenda for the final Plenary meeting of Working Party 7C - Thursday, 26 September 2024, at 1400 hours (Geneva time + 3 hours) (Room Callipso A, overflow Callipso B)
|
N/A
|
|
[ ADM 10 ] Revision 1 - English - Word |
2024-09-26 [10:57]
|
35'233 octets |
|
|
[ TD 62 ]
|
2024-09-26 |
WP 7C
|
Annex XX to Working Party 7C Chair's Report - Review of Recommendations, Reports and Opinions under the purview of Working Party 7C
|
N/A
|
|
[ TD 62 ] Revision 1 - English - Word |
2024-09-26 [10:56]
|
51'924 octets |
|
|
[ TD 55 ]
|
2024-09-25 |
WP 7C
|
Proposed reply liaison statement to Working Party 7B regarding WRC-27 agenda item 1.15
|
AI1.15
|
|
[ TD 55 ] Revision 1 - English - Word |
2024-09-26 [09:10]
|
57'820 octets |
|
|
[ TD 61 ]
|
2024-09-26 |
WP 7C
|
Annex XX to Working Party 7C Chair's Report - Status of Questions assigned to Working Party 7C
|
N/A
|
|
[ TD 61 ] - English - Word |
2024-09-26 [07:38]
|
35'556 octets |
|
Résultats: 79 documents
Result Page:
1 -
2
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):