Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : R23-WP5D Ajoutés récemment -  Recherche de documents de réunion
   
UIT-R R23-WP5D Documents de réunions
  Nb max de documents affichés/page:
Résultats: 52 documents
Result Page:  1 - 2  - Suivant
Numéro  Date Source Titre
  Numéro  Mise à disposition Taille  
 
[ 791 ]  2025-07-03 Director, BR   Final list of participants - Working Party 5D (Kobe, Japan, 24 June - 3 July 2025)    
  [ 791 ]  - English -  PDF (acrobat) 2025-07-03 [11:59]  178'258  octets  
 
[ ADM 100 ]  2025-06-12 WP 5D   Schedule for the 49th meeting of Working Party 5D, Kobe, Japan, 24 June-3 July 2025    
  [ ADM 100 ] Revision 9 - English - Word 2025-07-03 [07:06]  212'738  octets  
 
[ TD 366 ]  2025-07-02 SWG IMT-MSS   Draft reply liaison statement to Working Party 4C - WRC-27 agenda item 1.13    
  [ TD 366 ] Revision 1 - English - Word 2025-07-03 [07:02]  40'412  octets  
 
[ TD 281 ]  2025-06-26 SWG Sharing Studies   Working document towards a preliminary draft new Report ITU-R M.[SRS-IMT] - Possible coordination between space research service (deep space) stations operating in the band 7 145-7 190 MHz and IMT stations operating in the band 6 425-7 125 MHz    
  [ TD 281 ] Revision 1 - English - Word 2025-07-03 [06:48]  7'422'842  octets  
 
[ ADM 109 ]  2025-07-02 Chair, WP 5D   Draft agenda for the Closing Plenary of the 49th meeting of Working Party 5D - Thursday, 3 July 2025, from 1400 to 1700 hours (Kobe time) (Room IO, The 9th floor of Kobe Fashion Mart)    
  [ ADM 109 ]  - English - Word 2025-07-03 [07:01]  52'298  octets  
 
[ TD 361 ]  2025-07-01 SWG IMT Characteristics   Working document on characteristics of terrestrial component of IMT for sharing and compatibility studies in preparation for WRC-27    
  [ TD 361 ] Revision 1 - English - Word 2025-07-03 [06:53]  127'487  octets  
 
[ TD 323 ]  2025-06-30 SWG Sharing Studies   Draft liaison statement to Working Party 4A - Development of methodologies to calculate coordination area around non-GSO earth station to facilitate compatibility in the frequency band 6 700-7 075 MHz with IMT base station    
  [ TD 323 ] Revision 1 - English - Word 2025-07-03 [06:46]  41'228  octets  
 
[ TD 303 ]  2025-06-29 SWG Sharing Studies   Draft reply liaison statement to Working Party 7D (copy to Working Party 5A) - Determination of the coordination area around existing RAS stations from IMT stations in the frequency band 6 650-6 675.2 MHz    
  [ TD 303 ] Revision 2 - English - Word 2025-07-03 [06:44]  40'402  octets  
 
[ TD 282 ]  2025-06-26 SWG Sharing Studies   Detailed work plan for the development of preliminary draft new Report ITU-R M.[SRS-IMT] - Coordination between space research service (deep space) stations operating in the band 7 145-7 190 MHz and IMT stations operating in the band 6 425-7 125 MHz    
  [ TD 282 ] Revision 2 - English - Word 2025-07-03 [06:40]  41'074  octets  
 
[ TD 283 ]  2025-06-26 SWG Sharing Studies   Draft reply liaison statement to Working Party 7B - Possible coordination between space research service (deep space) stations operating in the band 7 145-7 190 MHz and IMT stations operating in the band 6 425-7 125 MHz    
  [ TD 283 ] Revision 2 - English - Word 2025-07-03 [06:36]  38'473  octets  
 
[ TD 321 ]  2025-06-30 WG Spectrum Aspects and WRC Preparations   Draft Note to the Director, BR - Assistance on sharing and compatibility studies for the 4 500-4 800 MHz frequency band in relation to WRC-27 agenda item 1.7    
  [ TD 321 ] Revision 1 - English - Word 2025-07-03 [06:33]  39'160  octets  
 
[ TD 345 ]  2025-07-01 SWG Radio Aspects   Working document towards a preliminary draft new Report ITU-R M.[IMT-2030.TECH PERF REQ] - Minimum requirements related to technical performance for IMT-2030 radio interface(s)    
  [ TD 345 ] Revision 1 - English - Word 2025-07-03 [06:31]  126'410  octets  
 
[ TD 324 ]  2025-06-30 SWG IMT Specifications   Draft Circular Letter for Recommendation ITU-R M.2150 Revision 4    
  [ TD 324 ] Revision 1 - English - Word 2025-07-03 [06:27]  118'150  octets  
 
[ TD 305 ]  2025-06-29 SWG IMT Specifications   [Draft] liaison statement to external organizations on the schedule for updating Recommendation ITU-R M.2150 to Revision 4    
  [ TD 305 ] Revision 1 - English - Word 2025-07-03 [06:25]  41'709  octets  
 
[ TD 304 ]  2025-06-29 SWG IMT Specifications   [Draft] liaison statement to external organizations on the schedule for updating Recommendation ITU-R M.2012 to Revision 8    
  [ TD 304 ] Revision 1 - English - Word 2025-07-03 [06:23]  41'456  octets  
 
[ TD 355 ]  2025-07-01 Chair, SWG Radio Aspects   Meeting Report of SWG Radio Aspects    
  [ TD 355 ] Revision 1 - English - Word 2025-07-03 [05:19]  42'956  octets  
 
[ TD 341 ]  2025-07-01 SWG WRC-27 AI1.7   Attachment 9 - Sharing between the meteorological satellite service (Earth-to-space) in the frequency band 8 175-8 215 MHz and IMT operating in the frequency band 7 125 8 400 MHz    
  [ TD 341 ] Revision 1 - English - Word 2025-07-03 [03:05]  834'695  octets  
 
[ TD 354 ]  2025-07-01 SWG WRC-27 AI1.7   Annex 1 - Sharing and compatibility studies between services to which the band is currently allocated and IMT systems in the frequency band 4 400-4 800 MHz under WRC-27 agenda item 1.7    
  [ TD 354 ] Revision 1 - English - Word 2025-07-03 [02:40]  12'024'068  octets  
 
[ TD 339 ]  2025-07-01 SWG WRC-27 AI1.7   Attachment 7 - Sharing between the mobile satellite service (Earth-to-space) in the frequency band 7 900-8 025 MHz and IMT operating in the frequency band 7 125-8 400 MHz    
  [ TD 339 ] Revision 1 - English - Word 2025-07-03 [02:33]  20'164'597  octets  
 
[ TD 342 ]  2025-07-01 SWG WRC-27 AI1.7   Attachment 10 - Sharing between the Earth exploration satellite service (space-to-Earth) in the frequency band 8 025-8 400 MHz and IMT operating in the frequency band 7 125-8 400 MHz    
  [ TD 342 ] Revision 1 - English - Word 2025-07-03 [02:39]  14'859'177  octets  
 
[ TD 337 ]  2025-07-01 SWG WRC-27 AI1.7   Attachment 5 - Sharing between the fixed satellite service (Earth-to-space) in the frequency band 7 900-8 400 MHz and IMT operating in the frequency band 7 125-8 400 MHz    
  [ TD 337 ] Revision 1 - English - Word 2025-07-03 [02:21]  23'401'147  octets  
 
[ TD 329 ]  2025-06-30 SWG WRC-27 AI1.7   Annex 3 - Sharing and compatibility studies between services to which the band is currently allocated and IMT systems in the frequency band 14.8-15.35 GHz under WRC-27 agenda item 1.7    
  [ TD 329 ] Revision 2 - English - Word 2025-07-03 [02:36]  7'077'066  octets  
 
[ TD 340 ]  2025-07-01 SWG WRC-27 AI1.7   Attachment 8 - Sharing between the meteorological satellite service (space-to-Earth) in the frequency bands 7 450-7 550 MHz and 7 750-7 900 MHz and IMT operating in the frequency band 7 125-8 400 MHz    
  [ TD 340 ] Revision 1 - English - Word 2025-07-03 [02:28]  6'484'466  octets  
 
[ TD 343 ]  2025-07-01 SWG WRC-27 AI1.7   Attachment 11 - Compatibility of the space research service (space-to-Earth) operating in the frequency band 8 400-8 500 MHz and IMT operating in the frequency band 8 215-8 400 MHz    
  [ TD 343 ] Revision 1 - English - Word 2025-07-03 [02:29]  2'332'864  octets  
 
[ TD 344 ]  2025-07-01 SWG WRC-27 AI1.7   [Attachment 12 - Sharing between the Earth exploration satellite service (Earth-to-space) operating in the frequency band 7 190-7 250 MHz and IMT operating in the frequency band 7 125-8 400 MHz]    
  [ TD 344 ] Revision 1 - English - Word 2025-07-03 [02:25]  1'434'326  octets  
 
[ TD 338 ]  2025-07-01 SWG WRC-27 AI1.7   Attachment 6 - Sharing between the mobile satellite service (space-to-Earth) (see RR No. 5.461) in the frequency band 7 250-7 375 MHz and IMT operating in the frequency band 7 125-8 400 MHz    
  [ TD 338 ] Revision 1 - English - Word 2025-07-03 [02:14]  1'217'736  octets  
 
[ TD 336 ]  2025-07-01 SWG WRC-27 AI1.7   Attachment 4 - Sharing between the fixed satellite service (space-to-Earth) in the frequency band 7 250-7 750 MHz and IMT operating in the frequency band 7 125-8 400 MHz    
  [ TD 336 ] Revision 1 - English - Word 2025-07-03 [02:07]  5'244'199  octets  
 
[ TD 332 ]  2025-07-01 SWG WRC-27 AI 1.7   Annex 2 - Sharing and compatibility studies between services to which the band is currently allocated and IMT systems in the frequency band 7 125-8 400 MHz under WRC-27 agenda item 1.7    
  [ TD 332 ] Revision 1 - English - Word 2025-07-03 [02:08]  1'671'109  octets  
 
[ TD 367 ]  2025-07-02 SWG WRC-27 AI1.7   Attachment 13 - Sharing between the maritime mobile satellite service (Earth-to-space) in the frequency band 7 375-7 750 MHz and IMT operating in the frequency band 7 125-8 400 MHz    
  [ TD 367 ]  - English - Word 2025-07-03 [01:52]  101'863  octets  
 
[ ADM 108 ]  2025-07-02 Chair, WG Spectrum Aspects & WRC Preparations   Draft agenda of the closing session of WG Spectrum Aspects and WRC Preparations - Thursday, 3 July 2025, from 0900 to 1015 hours and 1045 to 1200 hours, if needed (Kobe time) (Room IO, The 9th floor of Kobe Fashion Mart)    
  [ ADM 108 ]  - English - Word 2025-07-02 [13:43]  54'184  octets  
 
[ TD 364 ]  2025-07-01 Chair, WG Technology Aspects   Meeting Report of WG Technology Aspects    
  [ TD 364 ]  - English - Word 2025-07-03 [06:46]  47'504  octets  
 
[ TD 363 ]  2025-07-01 Chair, SWG WRC-27 AI1.7   Meeting Report of SWG WRC-27 Agenda Item 1.7    
  [ TD 363 ]  - English - Word 2025-07-03 [01:46]  51'073  octets  
 
[ TD 362 ]  2025-07-01 Chair, SWG IMT Characteristics   Meeting Report of SWG IMT Characteristics    
  [ TD 362 ]  - English - Word 2025-07-03 [03:16]  39'246  octets  
 
[ TD 314 ]  2025-06-30 WG General Aspects   [Draft] reply liaison statement to ITU-T Joint Coordination Activity for IMT2020 and Beyond (JCA IMT2020) - Information on the IMT-2020 and beyond roadmap    
  [ TD 314 ] Revision 1 - English - Word 2025-07-02 [11:24]  37'710  octets  
 
[ ADM 106 ]  2025-07-01 Chair, WG General Aspects   Draft agenda of the 2nd meeting of Working Group General Aspects - Wednesday, 2 July 2025, at 1515 hours (Kobe time) (Room Ex 2-B)    
  [ ADM 106 ] Revision 1 - English - Word 2025-07-02 [11:19]  35'710  octets  
 
[ TD 320 ]  2025-06-30 Chair, SWG Specific Applications   Meeting Report of Sub-Working Group Specific Applications    
  [ TD 320 ] Revision 1 - English - Word 2025-07-02 [11:14]  51'117  octets  
 
[ ADM 107 ]  2025-07-02 Chair, WG Technology Aspects   Draft agenda for the final meeting of Working Group Technology Aspects- Thursday, 3 July 2025, at 1045 hours (Kobe time) (Room EX 1-B, the 9th floor of Kobe Fashion Mart)    
  [ ADM 107 ]  - English - Word 2025-07-02 [11:24]  40'997  octets  
 
[ TD 360 ]  2025-07-01 WG Spectrum Aspects and WRC Preparations   [Draft liaison statement to Working Parties 4A, 4C, 7B and 7C] - [Updated information on characteristics and protection criteria of the terrestrial component of IMT for sharing and compatibility studies in preparation for WRC-27]    
  [ TD 360 ]  - English - Word 2025-07-02 [10:47]  38'528  octets  
 
[ TD 359 ]  2025-07-01 Chair, SWG IMT-MSS   Meeting Report of Sub-Working Group IMT-MSS    
  [ TD 359 ]  - English - Word 2025-07-02 [10:42]  53'027  octets  
 
[ TD 358 ]  2025-07-01 SWG IMT-MSS   Working document on studies for the regulatory considerations to protect terrestrial IMT systems under WRC-27 agenda item 1.13    
  [ TD 358 ]  - English - Word 2025-07-02 [10:26]  10'141'364  octets  
 
[ TD 357 ]  2025-07-01 WG Spectrum Aspects and WRC Preparations   Elements towards a draft reply liaison statement to Working Party 1A - Blocking of IMT receivers by the emissions of beam WPT    
  [ TD 357 ]  - English - Word 2025-07-02 [10:15]  36'940  octets  
 
[ TD 356 ]  2025-07-01 Chair, WG General Aspects   Meeting Report of Working Group General Aspects    
  [ TD 356 ]  - English - Word 2025-07-02 [11:10]  58'134  octets  
 
[ TD 353 ]  2025-07-01 Chair, SWG Evaluation   Meeting Report of Sub-Working Group Evaluation    
  [ TD 353 ]  - English - Word 2025-07-02 [07:44]  43'102  octets  
 
[ TD 352 ]  2025-07-01 SWG Evaluation   Detailed work plan for development of the draft new Report ITU-R M.[IMT-2030.EVAL]    
  [ TD 352 ]  - English - Word 2025-07-02 [07:33]  38'227  octets  
 
[ TD 351 ]  2025-07-01 SWG Evaluation   Working document towards preliminary draft new Report ITU-R M.[IMT-2030.EVAL] - Guidelines for evaluation of radio interface technologies for IMT-2030    
  [ TD 351 ] Part 4 - English - Word 2025-07-02 [07:17]  62'691  octets  
  [ TD 351 ] Part 3 - English - Word 2025-07-02 [07:17]  35'403  octets  
  [ TD 351 ] Part 2 - English - Word 2025-07-02 [07:16]  19'014  octets  
  [ TD 351 ] Part 1 - English - Word 2025-07-02 [07:15]  26'142  octets  
  [ TD 351 ]  - English - Word 2025-07-02 [07:15]  573'820  octets  
 
[ 790 ]  2025-07-01 CITEL Rapporteur   Update Report on CITEL PCC.II activities    
  [ 790 ] Part 1 - English -  Zip (Document) 2025-07-02 [06:44]  16'915'546  octets  
Résultats: 52 documents
Result Page:  1 - 2  - Suivant
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML Oui  
Formats doc pdf zip  + Autres formats
Langues (maximum 2) E F S A C R  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2025-07-03