|
Format |
Taille |
Mise à disposition |
|
|
|
English |
PDF (acrobat)
|
142738 octets |
2024-04-02 |
[41] Annex 19- Final list of participants |
|
Word
|
39719 octets |
2024-04-02 |
[41] Annex 18- List of documents issued (Documents 7C/1-7C/39) |
|
Word
|
52264 octets |
2024-04-02 |
[41] Annex 17- Review of Recommendations, Reports and Opinions under the purview of Working Party 7C |
|
Word
|
34044 octets |
2024-04-02 |
[41] Annex 16- Status of Questions assigned to Working Party 7C |
|
Word
|
1191866 octets |
2024-04-02 |
[41] Annex 15- Updating the ITU/WMO Handbook on use of Radio Spectrum for meteorology (Proposed text for inclusion as an additional new Chapter 6 (Space weather)) |
|
Word
|
9201428 octets |
2024-04-02 |
[41] Annex 14- Revision of ITU/WMO Handbook on use of Radio Spectrum for meteorology (Updates for Chapter 1 (General structure of meteorological systems)) |
|
Word
|
34776 octets |
2024-03-25 |
[41] Annex 13- Proposed update to the list of contributors to the work on updating the "ITU/WMO Handbook on use of radio spectrum for meteorology" |
|
Word
|
31967 octets |
2024-03-25 |
[41] Annex 12- Proposed Terms of Reference for Working Party 7C Correspondence Group on updating the "ITU/WMO Handbook on use of radio spectrum for meteorology" |
|
Word
|
3455758 octets |
2024-03-26 |
[41] Annex 11- Preliminary draft new Report ITU-R RS series - Analysis of interference received by EESS (passive) sensors in the 18.6-18.8 GHz band caused by surface water reflections |
|
Word
|
39235 octets |
2024-03-25 |
[41] Annex 10- Work plan for WRC-27 agenda item 1.17 |
|
Word
|
48925 octets |
2024-03-25 |
[41] Annex 9- Working document on the status of issues related to EESS (passive) above 86 GHz |
|
Word
|
18772477 octets |
2024-03-25 |
[41] Annex 8- Working document towards a preliminary draft new Report ITU-R RS.[SST MEASUREMENTS] - Spectrum for EESS (passive) sea surface temperature (SST) measurements |
|
Word
|
13199132 octets |
2024-03-26 |
[41] Annex 7- Working document towards a preliminary draft new Report ITU-R RS.[EESS(PASSIVE)6-7 GHz] - EESS (passive) in the 6 425-7 250 MHz range |
|
Word
|
32864 octets |
2024-03-26 |
[41] Annex 6- Working document towards a preliminary draft new Report ITU-R - Typical technical and operational characteristics of spaceborne active sensors in the band 3 000-3 400 MHz |
|
Word
|
31901 octets |
2024-03-26 |
[41] Annex 5- Working document towards a preliminary draft revision of Recommendation ITU-R RS.577-7 - Frequency bands and required bandwidths used for spaceborne active sensors operating in the Earth exploration-satellite (active) and space research (active) services |
|
Word
|
31915 octets |
2024-03-25 |
[41] Annex 4- Working document toward a preliminary draft new Report ITU R RS.[AGG_EESS_SAR-RNSS] - Examples of evaluating and resolving interference into receiving earth stations in the radionavigation-satellite service (space-to-Earth) from multiple spaceborne synthetic aperture radar sensors in the Earth exploration-satellite (active) service in the 1 215-1 300 MHz band |
|
Word
|
45577 octets |
2024-03-26 |
[41] Annex 3- Working document towards a preliminary draft new Report ITU-R RS.[SPEC_REQTS_TX_SPACE_WEATHER] - Spectrum requirements and applicable radio service designations for active space weather sensors that provide data critical for predictions and warnings |
|
Word
|
1898964 octets |
2024-03-25 |
[41] Annex 2- Preliminary draft revision of Report ITU-R RS.2489-0 - Technical and operational characteristics of ground-based passive sensors operating in the 51-58 GHz frequency range |
|
Word
|
129642 octets |
2024-03-25 |
[41] Annex 1- Working document towards a preliminary draft new Recommendation ITU-R RS.[RXSW_PROTECT_CRITERIA] - Protection criteria of receive-only space weather sensors in the meteorological aids service (space weather) |
|
Word
|
104443 octets |
2024-04-16 |
[41] - Report on the meeting of Working Party 7C (18 - 22 March 2024) |
|
|