Page 12 - U4SSC Case study: City solid waste management, June 2020
P. 12

incidents detected during the service; the real-time monitoring of vehicles and traffic; and the
                monitoring of driving patterns.

                                        Figure 3: Control of the collecting services





































            This information is of special interest for the contractors that operate the service in order to enable
            them to optimise the use of their resources.

            3)  Vision for monitoring the performance of the process: The level of detail in the data allows us to
                know the environmental impact in terms of energy (CO2 emissions) and water savings (Figure 21),
                and also the percentage of recycled material that will be useful for re-use at the container level
                (Figure 5), which will serve to implement promotion campaigns in specific areas that increase the
                performance of the process.


























              6  Case study: City solid waste management, June 2020
   7   8   9   10   11   12   13   14   15   16   17