|
Format |
Size |
Posted |
|
|
|
English |
Word
|
53686 bytes |
2018-06-04 |
[844] Annex 35
- List of output (TEMP) documents - (Documents 5A/TEMP/273 to 5A/TEMP/336) (64 Temporary Documents)
|
|
Word
|
7174901 bytes |
2018-06-01 |
[844] Annex 34
- Preliminary draft new Report ITU-R M.[NON_IMT.MTC_USAGE] - Technical and operational aspects of Internet of Things and Machine-to-Machine applications by systems in the Mobile Service (excluding IMT) |
|
Word
|
78000 bytes |
2018-06-04 |
[844] Annex 33
- Working document towards a preliminary draft new Report ITU-R M.[ITS_ARR] - Examples of Arrangements for Intelligent Transport Systems deployments under the mobile service |
|
Word
|
54909 bytes |
2018-06-04 |
[844] Annex 32
- Element of the text on best practice and experiences on the usage of the bands between ITS and other applications / services |
|
Word
|
72579 bytes |
2018-06-04 |
[844] Annex 31
- Preliminary draft revision of Recommendation ITU-R M.1890-0 - Operational radiocommunication objectives and requirements for advanced intelligent transport systems |
|
Word
|
57268 bytes |
2018-06-04 |
[844] Annex 30
- Preliminary draft new Recommendation ITU-R M.[ITS_FRQ] - Harmonization of frequency bands for Intelligent Transport Systems in the mobile service |
|
Word
|
3849491 bytes |
2018-06-04 |
[844] Annex 29
- [Working document toward a] preliminary draft new Report ITU-R M.[ITS USAGE] - Intelligent transport systems (ITS) usage in ITU Member States |
|
Word
|
130273 bytes |
2018-06-04 |
[844] Annex 28
- [Preliminary] draft revision of Recommendation ITU-R M.2084-0 - Radio interface standards of vehicle-to-vehicle and vehicle-to-infrastructure communications for Intelligent Transport System applications |
|
Word
|
1227313 bytes |
2018-06-01 |
[844] Annex 27
- Working document towards a preliminary draft new Report ITU-R M.[100-GHz.RSTT.COEXIST] - Coexistence between high-speed railway radiocommunication system between train and trackside operating in the frequency bands 92-94 GHz, 94.1-100 GHz and 102-109.5 GHz, and active and passive services |
|
Word
|
1197535 bytes |
2018-06-04 |
[844] Annex 26
- Working document towards a preliminary draft new Report ITU-R M.[RLAN SHARING 5 725-5 850 MHZ] - Sharing and compatibility studies of WAS/RLAN in the 5 725-5 850 MHz frequency range
|
|
Excel 2007
|
19696 bytes |
2018-06-04 |
[844] Annex 25 Part 2
|
|
Excel 2007
|
19693 bytes |
2018-06-04 |
[844] Annex 25 Part 1
|
|
Word
|
5515139 bytes |
2018-06-04 |
[844] Annex 25
- Working document towards a preliminary draft new Report ITU-R M.[RLAN SHARING 5 350-5 470 MHz] - Sharing and compatibility studies of WAS/RLAN in the 5 350-5 470 MHz frequency range |
|
Excel 2007
|
122003 bytes |
2018-06-04 |
[844] Annex 24 Part 1
|
|
Word
|
11982364 bytes |
2018-06-04 |
[844] Annex 24
- Preliminary draft new Report ITU-R M.[RLAN SHARING 5 150-5 250 MHz] - Sharing and compatibility studies of WAS/RLAN in the 5 150-5 250 MHz frequency range |
|
Word
|
89525 bytes |
2018-06-01 |
[844] Annex 23
- Working document towards a preliminary draft revision of Recommendation ITU-R M.1808* - Technical and operational characteristics of conventional and trunked land mobile systems operating in the mobile service allocations below 869 MHz to be used in sharing studies
|
|
Word
|
100662 bytes |
2018-06-01 |
[844] Annex 22
- Working document towards a preliminary draft revision of Recommendation ITU-R M.1826 - Harmonized frequency channel plan for broadband public protection and disaster relief operations at 4 940-4 990 MHz in Regions 2 and 3
|
|
Word
|
61548 bytes |
2018-06-01 |
[844] Annex 21
- Preliminary draft revision of Recommendation ITU-R M.2009-1 - Radio interface standards for use by public protection and disaster relief operations in accordance with Resolution 646 (Rev.WRC-15) |
|
Word
|
60345 bytes |
2018-06-01 |
[844] Annex 20
- Preliminary draft revision of Recommendation ITU-R M.1746-0 - Harmonized frequency channel plans for the protection of property using data communication
|
|
Word
|
61349 bytes |
2018-06-01 |
[844] Annex 19
- Preliminary draft revision of Recommendation ITU-R M.1637 - Global cross-border circulation of radiocommunication equipment for use
in emergency and disaster relief situations
|
|
Word
|
62797 bytes |
2018-06-04 |
[844] Annex 18 Part 2
|
|
Word
|
50427 bytes |
2018-06-04 |
[844] Annex 18 Part 1
|
|
Word
|
157821 bytes |
2018-06-04 |
[844] Annex 18
- Elements for a working document towards a possible preliminary draft new Report on utility communication systems |
|
Word
|
52242 bytes |
2018-06-04 |
[844] Annex 17
- Vocabulary for RLANs: DFS and TCP (elements for a future update of Rec. ITU-R M.1450) |
|
Word
|
1828774 bytes |
2018-06-01 |
[844] Annex 16
- Working document towards a preliminary draft new Report ITU-R M.[CDLMR] - Conventional digital land mobile radio systems |
|
Excel 2007
|
82716 bytes |
2018-06-01 |
[844] Annex 15 Part 1
|
|
Word
|
348183 bytes |
2018-06-01 |
[844] Annex 15
- Working document towards a preliminary draft new Recommendation ITU-R M.[RSTT_FRQ] - [Harmonization of] frequencies and related frequency arrangements, for railway radiocommunication systems between train and trackside |
|
Excel 2007
|
246515 bytes |
2018-06-01 |
[844] Annex 14 Part 3
|
|
Word
|
140500 bytes |
2018-06-01 |
[844] Annex 14 Part 2
|
|
Excel 2007
|
42136 bytes |
2018-06-01 |
[844] Annex 14 Part 1
|
|
Word
|
10579675 bytes |
2018-06-01 |
[844] Annex 14
- Preliminary draft new Report ITU-R M.[RSTT.USAGE] - Current and future usage of railway radiocommunication systems between train and trackside (RSTT) |
|
Word
|
55594 bytes |
2018-06-04 |
[844] Annex 13
- Report on activities in support of WRC-19 agenda item 9.1, issue 9.1.5 |
|
Word
|
50633 bytes |
2018-06-05 |
[844] Annex 12
- Draft CPM text for WRCC-19 agenda item 9.1, issue 9.1.5 |
|
Word
|
61363 bytes |
2018-06-04 |
[844] Annex 11
- Report on activities in support of WRC-19 agenda item 1.16 |
|
Word
|
90158 bytes |
2018-06-07 |
[844] Annex 10
- Draft CPM text for WRC-19 agenda item 1.16 |
|
Word
|
49262 bytes |
2018-06-04 |
[844] Annex 09
- Report on activities in support of WRC-19 agenda item 1.12 |
|
Word
|
50891 bytes |
2018-06-05 |
[844] Annex 08
- Draft CPM text for WRC-19 agenda item 1.12 |
|
Word
|
61338 bytes |
2018-06-04 |
[844] Annex 07
- Report on activities in support of WRC-19 agenda item 1.11 |
|
Word
|
67292 bytes |
2018-06-05 |
[844] Annex 06
- Draft CPM text on WRC-19 agenda item 1.11 |
|
Word
|
61970 bytes |
2018-06-04 |
[844] Annex 05
- Report on activities in support of WRC-19 agenda item 1.1 |
|
Word
|
76051 bytes |
2018-06-05 |
[844] Annex 04
- Draft CPM text on WRC-19 agenda item 1.1 |
|
Word
|
115129 bytes |
2018-06-08 |
[844] Annex 03
- Consolidation of Reports from the Working Groups of Working Party 5A |
|
PDF (acrobat)
|
83021 bytes |
2018-06-15 |
[844] Annex 02 Part 3
|
|
PDF (acrobat)
|
85868 bytes |
2018-06-15 |
[844] Annex 02 Part 2
|
|
PDF (acrobat)
|
74209 bytes |
2018-06-15 |
[844] Annex 02 Part 1
|
|
Word
|
287990 bytes |
2018-06-15 |
[844] Annex 02
- Consolidation of texts approved by Working Party 5A |
|
Word
|
141085 bytes |
2018-06-01 |
[844] Annex 01
- Working Party 5A management |
|
Word
|
86377 bytes |
2018-07-04 |
[844]
- Report on the twentieth meeting of Working Party 5A (Geneva, 21-31 May 2018) |
|
|